Text
CATEGORY 1,
REGULAT rcY INFORMATXON DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR:9805190304 DOC.DATE: 98/04/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
Xndiana Michigan Power Co.
(formerly Indiana
& Michigan Ele CENTER,J.F.
(formerly Indiana
& Michigan Ele COOPER,D.E.
(formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Apr 1998 for DC Cook Nuclear Plant, Unit 1.W/980506 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR 1
ENCL 1
SIZE: 8 TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME STANG,J IREE CENTER RGN3 NOAC COPIES LTTR ENCL 1
1 1
'1 1
1 1
1 R
D U
N NOTE TO ALL "RIDSN RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
American ElectricP~
Cook Nuclear Plant One Cook Place Sndgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 6, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1
Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1998 is submitted.
Sincerely,
.E. Cooper Plant Manager ljc Attachment c: 'RC Region III D.R. Hahn S.
Hamming B.
Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble
-. pgO~~B W.H. Schalk D.G. Turner B.L. Bartlett 9805190304 980430 PDR ADOCK 050003i5 R
N.R.C. OPERATING DATAREPOR DOCKET NO.
DATE COMPLETED BY TELEPHONE 50- 315 May 4, 1998 JW Minor 616465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit 1 Apr-98 3250 1152 1020 We) 1056 1000 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net Mwe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 2880.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 204504.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 73.5 73.5 67.1 65.4 9.1
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE 50 - 315 D.C. Cook Unit1 May 4, 1998 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
April 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4/1/98 4/2/98 4/3/98 4/4/98 4/5/98 4/6/98 4/7/98 4/8/98 4/9/98 4/1 0/98 4/1 1/98 4/12/98 4/1 3/98 4/14/98 4/15/98 4/16/98 4/1 7/98 4/18/98 4/19/98 4/20/98 4/21/98 4/22/98 4/23/98 4/24/98 4/25/98 4/26/98 4/27/98 4/28/98 4/29/98 4/30/98
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit1 May 4, 1998 JF Center 616-697-5098 1 of 1 MONTHLYOPERATING ACTIVITIES-April 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of Aprilwas 0 MWh.
DETAILS 10/01/97 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
- Alltimes are in Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit1 May 4, 1998 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 1998 DURATION NO.
DATE TYPE'OURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT REASON REACTOR REPORT NO.
CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F
744.0 97-010 97-011 97-012 97-013 97-014 97-016 NIA NIA NIA NIA NIA N/A N/A N/A NIA N/A N/A NIA The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
American ElectricP~
Cook Nuclear Plant One Cook Place Bndgman, Ml49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
'ay 6, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2.
Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1998 is submitted.
Sincer ly, D.E. Cooper.
Plant Manager
/jc Attachment c:
NRC Region III D.R. Hahn S.
Hamming B.
Lewis INPO Records'Center ANI Nuclear Engineering Department E.E.'Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett
a r
V
~
1
N.R.C. OPERATING DATAREPOR DOCKET NO.
DATE COMPLETED BY TELEPHONE 50- 316 May 4, 1998 JW Minor 616-465-5901 D. C. Cook Unit 2 Apr-98 3411 1133 1090 We) 1100 1060 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 NA Year-to-Date 2880.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 NA Cumulative 178200.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 67.2 67.2 61.2 59.6 14.3
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 316 D.C. Cook Unit 2 May 4, 1998 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (NIWe-Net)
April 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4/1/98 4/2/98 4/3/98 4/4/98 4/5/98 4/6/98 4/7/98 4/8/98 4/9/98 4/10/98 4/11/98 4/12/98 4/13/98 4/14/98 4/15/98 4/16/98 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 4/17/98 4/18/98 4/19/98 4/20/98 4/21/98 4/22/98 4/23/98 4/24/98 4/25/98 4/26/98 4/27/98 4/28/98 4/29/98 4/30/98
A Wp'a (
4k)
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 May 4, 1998 JF Center 616-697-5098 1 of 1 HIGHLIGHTS MONTHLYOPERATING ACTIVITIES-April 1998 The unit entered this reporting period in Mode 6 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of Aprilwas 0 MWh.
DETAILS'2/28/98 n/a U2R97 Cycle 11 -12 refueling outage continues.
Alltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit2..
~
May 4, 1998 JF Center 616-697-5098 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS - April 1998 DURATION NO.
DATE TYPE'OURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT REASON REACTOR REPORT NO.
CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 334 101297 S
744.0 N/A N/A N/A The unit entered the period in a scheduled refueling outage.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation ofdata entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I'ame Source
0 0