ML17334B772

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Plant,Unit 1.W/980506 Ltr
ML17334B772
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/30/1998
From: Center J, Cooper D, Minor J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9805190304
Download: ML17334B772 (14)


Text

CATEGORY 1, REGULAT rcY INFORMATXON DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9805190304 DOC.DATE: 98/04/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH. NAME AUTHOR AFFILIATION MINOR,J.W. Xndiana Michigan Power Co. (formerly Indiana & Michigan Ele CENTER,J.F. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele COOPER,D.E. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1998 for DC Cook Nuclear Plant, Unit 1.W/980506 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) 1 ENCL 1 SIZE: 8 E

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 STANG,J 1 1

'1 R INTERNAL: AEOD/SPD/RRAB 1 1 IREE CENTER 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL "RIDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

American Electric Cook Nuclear Plant P~

One Cook Place Sndgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 6, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1998 is submitted.

Sincerely,

.E. Cooper Plant Manager ljc Attachment c: 'RC Region III D.R. Hahn S. Hamming B. Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble

-. W.H. Schalk pgO~~B D.G. Turner B.L. Bartlett 9805190304 980430 PDR ADOCK 050003i5 R PDR

N.R.C. OPERATING DATA REPOR DOCKET NO. 50- 315 DATE May 4, 1998 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Apr-98
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, IfAny (Net Mwe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 2880.0 204504.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 73.5
20. Unit Availability Factor 0.0 0.0 73.5
21. Unit Capacity Factor (MDC Net) 0.0 0.0 67.1
22. Unit Capacity Factor (DER Net) 0.0 0.0 65.4
23. Unit Forced Outage Rate 100.0 100.0 9.1
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit1 DATE May 4, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

April 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 4/1/98 4/1 7/98 4/2/98 4/18/98 4/3/98 4/19/98 4/4/98 4/20/98 4/5/98 4/21/98 4/6/98 4/22/98 4/7/98 4/23/98 4/8/98 4/24/98 4/9/98 4/25/98 4/1 0/98 4/26/98 4/1 1/98 4/27/98 4/12/98 4/28/98 4/1 3/98 4/29/98 4/14/98 4/30/98 4/15/98 4/16/98

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit1 DATE May 4, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of 1 MONTHLYOPERATING ACTIVITIES - April 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of April was 0 MWh.

DETAILS 10/01/97 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

All times are in Eastern Standard Time (EST).

DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit1 DATE May 4, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON REACTOR - REPORT NO. CODE CODE TO PREVENT RECURRENCE 333 090897 F 744.0 97-010 NIA N/A The unit was shutdown to resolve design 97-011 NIA N/A basis questions discovered during the NRC 97-012 NIA NIA Architect and Engineering (AE) Inspection.97-013 NIA N/A 97-014 NIA N/A 97-016 N/A NIA 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

American Electric Cook Nuclear Plant P~

One Cook Place Bndgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

'ay 6, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2.

Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1998 is submitted.

Sincer ly, D.E. Cooper.

Plant Manager

/jc Attachment c: NRC Region III D.R. Hahn S. Hamming B. Lewis INPO Records'Center ANI Nuclear Engineering Department E.E.'Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett

a r V ~

1

N.R.C. OPERATING DATA REPOR DOCKET NO. 50- 316 DATE May 4, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Apr-98
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 2880.0 178200.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 0.0 67.2
20. Unit Availability Factor 0.0 0.0 67.2
21. Unit Capacity Factor (MDC Net) 0.0 0.0 61.2
22. Unit Capacity Factor (DER Net) 0.0 0.0 59.6
23. Unit Forced Outage Rate NA NA 14.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE May 4, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (NIWe-Net)

April 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 4/1/98 0 4/17/98 4/2/98 0 4/18/98 4/3/98 0 4/19/98 4/4/98 0 4/20/98 4/5/98 0 4/21/98 4/6/98 0 4/22/98 4/7/98 0 4/23/98 4/8/98 0 4/24/98 4/9/98 0 4/25/98 4/10/98 0 4/26/98 4/11/98 0 4/27/98 4/12/98 0 4/28/98 4/13/98 0 4/29/98 4/14/98 0 4/30/98 4/15/98 0 4/16/98 0

A Wp'a (

4k)

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE May 4, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of 1 MONTHLYOPERATING ACTIVITIES - April 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of April was 0 MWh.

DETAILS'2/28/98 n/a U2R97 Cycle 11 -12 refueling outage continues.

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2.. ~

DATE May 4, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 334 101297 S 744.0 N/A N/A N/A The unit entered the period in a scheduled refueling outage.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I'ame Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

0 0