Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 1
ML17334B665
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/30/1997
From: Center J, Minor J, Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9712160260
Download: ML17334B665 (7)


Text

ACCESSION NBR:

FACIL:,$0@315 AUTH.2%ME ) ~

MINOR,J.W.

CENTER, J. F.

SAMPSON,J.R.

RECIP. NAME CATEGORY 1 REGULA INFORMATION DISTRIBUTIO YSTEM (RXDS) 9712160260 DOC.DATE: 97/11/30 NOTARIZED: NO DOCKET ¹ Donald C.

Cook. Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTHOR AFFILIATION Indiana Michigan Power Co.

Indiana Michigan Power Co.

Indiana Michigan Power Co'.

RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1997 for DC Cook Nuclear Plant, Unit 1.W/971208 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME HIC J

COPIES LTTR ENCL 1

1 XNTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1

1 1

1 1

1 1

1 FIL RGN3 NOAC 01 1

1 1

1 1

1 D

U M

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

Indiana Michigan.

Power Company Cook Nuctear Plant,~

One Cook Piace Bridgman, MI49t06 1l 4

U.S. N.iclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 December 8, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit "I Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of November 1997 is submitted.

Sincerely,

.gQ J.R. Sampson Plant Manager

/jc Attachment c:

NRC Region'ill D.R. Hahn R.C. Callen S.

Hamming B.

Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. 'Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L.. Noble W.H. Schalk D.G. Turner B.L. Bartlett 97i2ih0260 97ii30 PDR ADQCK 050003i5 R

PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

~

4 C

i'

N.R.C. OPERATING DATAREPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50- 315 December 4, 1997 JW Minor 616-465-5901 OPERATING STATUS

1. Unit Name

'.C

2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS MWe)
7. Maximum Dependable Capacity (Net MWe)

Cook Unit1 Nov-97 3250 1152

,1020 1056 1000 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, IfAny (Net Mwe):
10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor.
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 8016.0 4698.0 0.0 4612.3 0.0 14390017.0 4714030.0 4546279.0 57.5 57.5 56.7 55.6 30.2 Cumulative 200880.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 74.9 74.9 68.3 66.6 7.0
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 315 D.C. Cook Unit1 December 4, 1997 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

November 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 11/1/97 11/2/97 11/3/97 11/4/97 11/5/97 11/6/97 11/7/97 11/8/97 11/10/97 11/10/97 11/1 1/97 11/12/97 11/13/97 11/14/97 11/15/97 11/16/97 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 11/17/97 11/1 8/97 11/10/97 11/20/97 11/21/97 11/22/97 11/23/97 11/24/97 11/25/97 11/26/97 11/27/97 11/28/97 11/29/97 11/30/97

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1 December 4, 1997 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-November 1997 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of November was 0 MWh.

DETAILS 10/01/97 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

Alltimes are in Eastern Standard Time (EST).

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit1.c-December 4, 1997, JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - NOVEMBER 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE" HOURS REASON2 REACTOR>

REPORT NO.

CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

720.0 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A NIA N/A N/A NIA N/A NIA N/A NIA NIA The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source