Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980309 Ltr
ML17334A681
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/28/1998
From: Center J, Cooper D, Minor J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9803190400
Download: ML17334A681 (48)


Text

CATEGORY 1 REGULAIOY INFORMATION DISTRIBUTIORYSTEM (RIDS)

ACCESSION NBR:9803190400 DOC.DATE: 98/02/28 NOTARIZED: NO DOCKET FACIL:50,-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAMg AUTHOR AFFILIATION CENTER,J.F. Indiana Michigan Power Co.

MINOR,J.W. -

Indiana Michigan Power Co.

COOPER,D.E. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept Fe 998 for Donald C Cook Nuclear Plant, Unit 1. /980309 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECXPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0

PD3-3 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CESAR 1 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 E

NOTE TO ALL MRIDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

V I

Indiana Michigan Power Company

~ ~ Cook Nuclear Plant One Cook Place Bridgman, MI 49106 R

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 March 9, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1998 is submitted.

Sincer ly, D.E. Cooper Plant Manager

/jc Attachment c: NRC Region III D.R. Hahn R.C. Callen S. Hamming B. Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick iJ 4/i~ ~j A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett 9803190400 'rr80228 7 PDR ADOCK 05000315 R PDR i llllllllllllllllllllllllllllllllllllllll

N.R.C. OPERATING DATA REPOR DOCKET NO. 50 - 315 DATE March 6, 1998 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Feb-98
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electricai Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 672.0 1416.0 203040.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0; 0.0 74.1,

'.0

~

20. Unit Availability.Factor, . 0.0

~

74;1

21. Unit Capacity Factor (MDC Net) 0.0 0.0 67.6
22. Unit Capacity Factor (DER Net) 0.0 0.0 65.9
23. Unit Forced Outage Rate 100.0 100.0 8.2
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE March 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

February 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL . POWER LEVEL 2/1/98 0 2/17/98 0 2/2/98 0 2/18/98 0 2/3/98 0 2/19/98 0 2/4/98 0 2/20/98 0 2/5/98 0 2/21/98 0 2/6/98 0 2/22/98 0 2/7/98 0 2/23/98 0 2/8/98 0 2/24/98 0 2/9/98 0 2/25/98 0 2/10/98 0 2/26/98 0 2/11/98 0 2/27/98 0 2/12/98 0 2/28/98 0 2/13/98 0 0 2/14/98 0 0 2/15/98 0 .0 2/16/98 '0

1 DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE March 6, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1of1 MONTHLYOPERATING ACTIVITIES - February 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of February was 0 MWh.

DETAILS

'0/01/97 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

All times are in Eastern Standard Time (EST).

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit1-DATE March 6, 1998 COMPLETED BY JF Center.

TELEPHONE 616-697-5()98 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - February 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON~ REACTORs REPORT NO CODE CODEs TO PREVENT RECURRENCE 333 090897 F 744.0 F 97-010 N/A NIA The unit was shutdown to resolve design 97-011 NIA NIA basis questions discovered during the NRC 97-012 NIA NIA Architect and Engineering (AE) Inspection.97-013 N/A NIA 97-014 N/A N/A 97-016 N/A N/A TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

1 F: Forced A: Equipment Failure (Explain) ', 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

-a/s r

rg V ~/yggDM Distri73.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients: Copies:

J Stang Paper Copy Internal Recipients:

RidsRgn3MailCenter 0 OK Rids Res DraaOerab 0 OK RidsOcfoDpbaPab 0 OK RidsManager OK RidsAcrsAcnwMailCenter 0 OK RGN3 'Paper Copy RES/DRAA/OERAB 1 Paper Copy OCFO Paper Copy EC R 01 Paper Copy ACRS Paper Copy External Recipients:

NOAC Paper Copy INEEL Marshall Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03694646:1

Subject:

D. C. Cook Nuclear Plant, Unit 1, Monthly Operating Report for February 2000 Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003694646.

Page 1

Distri73.txt lE24- Monthly Operating Report (per Tech Specs)

Docket: 05000315 Page 2

Indiana Michigan I

Power Company Cook Nuckw Hart Ono Cook Aace

&idge M 49106 616466901

)NOME NICHIREN PNM'arch 13, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for February 2000 is submitted.

Sincerely,

@san~

R. C. Godley Regulatory Affairs Director RCG/mbd Attachments ANI Nuclear Engineering Department A. C. Bakken, III G. T. Gaffney Canton D. R. Hahn Department of Health S. Hamming Department of Labor RAF Harris INPO Records Center G. John B. Lewis McGraw-Hill Companies D. H. Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T. P. Noonan D. W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk AE/:~II0er/ca's / II')'nr/ver

NRC OPERATING DATA REPORT DOCKET NO. '0-315 DATE March 6, 2000 COMPLETED BY :J. W. Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Feb-2000
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 696.0 1440.00 220584.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 68.0
20. Unit Availability Factor 0.0 0.0 68.0
21. Unit Capacity Factor (MDC Net) 0.0 0.0 62.0
22. Unit Capacity Factor (DER Net) 0.0 0.0 60.5
23. Unit Forced Outage Rate 100.0 100.0 17.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

September 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit1 DATE March 6, 2000 COMPLETED BY J. W. Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

February 2000 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 2/1/2000 0 2/1 7/2000 0 2/2/2000 0 2/1 8/2000 0 2/3/2000 0 2/1 9/2000 0 2/4/2000 0 2/20/2000 0 2/5/2000 0 2/21/2000 0 2/6/2000 0 2/22/2000 0 2/7/2000 0 2/23/2000 0 2/8/2000 0 2/24/2000 0 2/9/2000 0 2/25/2000 0 2/10/2000 0 2/26/2000 0 2/11/2000 0 2/27/2000 0 2/12/2000 0 2/28/2000 0 2/13/2000 0 2/29/2000 0 2/14/2000 0 2/1 5/2000 0 2/16/2000 0

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit t, DATE March 5, 2000

'OMPLETED BY MB Depuydt TELEPHONE 616-465-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS February 2000 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 333 090897 F 696.0 97-010 N/A N/A The unit remained shutdown to resolve design 97-011 N/A N/A basis questions discovered during the NRC 97-012 N/A N/A Architect and Engineering (AE) Inspection.97-013 N/A NIA 97-014 N/A N/A 97-016 N/A NIA 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

-98

>/u/ups Distri66.txt

.Distribution Sheet Priority: Normal From: Stefanie Fountain

'ction Recipients: Copies:

J Stang Paper Copy Internal Recipients:

RidsRgn3MailCenter OK RidsResDraaOerab OK RidsManager OK RidsAcrsAcnwMailCenter 0 OK RGN3 Paper Copy RES/DRAA/OERAB 1 Paper Copy 0 0 F 010 0 0 E Paper Copy RFILE REEFER 01 Paper Copy ACRS Paper Copy External Recipients:

NOAC Paper Copy INEEL Marshall Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003685663:1

Subject:

Letter forwarding monthly operating report for Donald C. Cook for January 2000.

F Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003685663.

Page 1

~0 Distri66.txt lE24- Monthly Operating Report (per Tech Specs)

Docket: 05000315 Page 2

One Cook Pboe Ml 49106 616466901 lNQlANSl NICIIfGIM PQWM February 11, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for Januaty 2000 is submitted.

Sincerely, R. C. Godley Regulatory Affairs Director RCG/mbd Attachments c: ANI Nuclear Engineering Department A. C. Bakken, III G. T. Gaffney Canton D. R. Hahn Department of Health S. Hamming Department of Labor RAF Harris INPO Records Center G. John B. Lewis McGraw-Hill Companies D. H. Malin NRC Project Manager- NRR NRC Region III NRC Resident Inspector T. P. Noonan D. W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk

~~&SR~ AEI':~Ir0ericn's Eae~r iarlIIer meaf

NRC OPERATING DATA REPORT DOCKET NO. 50 - 315 DATE February 4, 2000 COMPLETED BY J. W. Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit1
2. Reporting Period Jan-2000
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 744.00 219888.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0

. 16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0

17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 68.2
20. Unit Availability Factor 0.0 0.0 68.2
21. Unit Capacity Factor (MDC Net) 0.0 0.0 62.2
22. Unit Capacity Factor (DER Net) 0.0 0.0 60.7
23. Unit Forced Outage Rate 100.0 100.0 17.0
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

Se tember 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

~e DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit1 DATE February 4, 2000 COMPLETED BY J. W. Minor TELEPHONE 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

January 2000 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 1/1/2000 1/17/2000 1/2/2000 1/18/2000 1/3/2000 1/19/2000 1/4/2000 1/20/2000 1/5/2000 1/21/2000 1/6/2000 1/22/2000 1/7/2000 1/23/2000 1/8/2000 1/24/2000 1/9/2000 1/25/2000 1/10/2000 1/26/2000 1/11/2000 1/27/2000 1/12/2000 1/28/2000 1/1 3/2000 1/29/2000 1/14/2000 1/30/2000 1/15/2000 1/31/2000 1/16/2000

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE February 8, 2000 COMPLETED BY MB Depuydt .

TELEPHONE 616-465-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS January 2000 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 333 090897 F 744.0 97-010 N/A NIA The unit remained shutdown to resolve design 97-011 N/A NIA basis questions discovered during the NRC 97-012 N/A NIA Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

~ ~

I'

i/nyu<<

Distri49.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients: Copies:

J Stang 1 Not Found Internal Recipients:

RGN 3 Not- Found RES/DRAA/OERAB Not Found Not Found E CEN Not Found Not Found External Recipients:

NOAC Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003678909

Subject:

.Monthly operating report for December 1999 for D. C. Cook Nuclear Plan t, Unit 1. With 000114 letter.

Body:

Docket: 05000315, Notes: N/A Page 1

Indiana Michigan One Gxa pbce SMgnatLMI 49106 Z

616465%1 INOIANA NICHIGAM GOWK R January 14, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for December 1999 is submitted.

Sincerely, R. C. Godley Regulatory Affai s Director RCG/mbd Attachments ANI Nuclear Engineering Department A. C. Bakken, III G. T. Gaffney Canton D. R. Hahn- Department of Health S. Hamming Department of Labor INPO Records Center G. John B. Lewis McGraw-Hill Companies D. H. Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T. P. Noonan D. W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Ucensing Manager M. W. Rencheck W. H. Schalk D. G. Turner

NRC OPERATING DATA REPORT DOCKET NO. 50- 315 DATE January 5, 2000 COMPLETED BY J. W. Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Dec-99
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 8760.00 219144.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 68.5
20. Unit Availability Factor 0.0 0.0 68.5
21. Unit Capacity Factor (MDC Net) 0.0 0.0 62.5
22. Unit Capacity Factor (DER Net) 0.0 0.0 60.9
23. Unit Forced Outage Rate 100.0 100.0 16.7
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

September 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit1 DATE January 5, 2000 COMPLETED BY J. W. Minor TELEPHONE 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

December 99 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 12/1/99 12/17/99 0 12/2/99 12/18/99 0 12/3/99 12/19/99 0 12/4/99 12/20/99 0 12/5/99 12/21/99 0 12/6/99 12/22/99 0 12/7/99 12/23/99 0 12/8/99 12/24/99 0 12/9/99 12/25/99 0 1210/99 12/26/99 0 12/11/99 12/27/99 0 12/12/99 12/28/99 0 12/1 3/99 12/29/99 0 12/14/99 12/30/99 0 12/15/99 12/3199 0 12/16/99

DOCKET NO. 50-315 UNIT NAME D C Cook Unit 1 DATE January 9, 2000 COMPLETED BY MB Depuydt TELEPHONE 616P65-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTlONS December 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 333 090897 F 744.0 97-010 N/A NIA The unit remained shutdown to resolve design 97-011 NIA N/A basis questions discovered during the NRC 97-012 N/A NIA Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A 3 METHOD: 4 SYSTEM: 5 COMPONENT:

1 TYPE: 2 REASON:

1: Manual Exhibit G - Instructions Exhibit I: Same Source F: Forced A: 'Equipment Failure (Explain)

S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

Distri29.txt Distribution Sheet Priority: Normal From: Andy Hoy Action Recipients: Copies:

J Stang 1 Paper Copy Internal Recipients:

RGN3. Paper Copy RES/DRAA/OERAB Paper Copy OC O/DPBA Paper Copy LE CENTER 01 Paper Copy ACRS Paper Copy External Recipients:

NOAC Paper Copy INEEL Marshall Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTADOl ID: 003677047

Subject:

Monthly operating report for December 1999 for D. C. Cook Nuclear Plan Unit 1. With letter dated 1/14/00.

Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching f or Accession Number ML003677047.

IE24 Monthly Operating Report (per Tech Specs)

Docket: 05000315 Page 1

Indiana Michigan I

Power Company Cook Nudear Rant One Cook Race Bridgman. Ml 49106 616456661 INIIlkiM NICIIIGQN ISO%M January 14, 2000 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit1 Technical Specillcation 6.9.1.8, the attached Monthly Operating Report for December 1999 is submitted.

Sincerely, R. C. Godley Regulatory Affai s Director RCG/mbd Attachments ANI Nuclear Engineering Department A. C. Bakken, III G. T. Gaffney Canton D. R. Hahn Department of Health S. Hamming Department of Labor INPO Records Center G. John B. Lewis McGraw-Hill Companies D. H. Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T. P. Noonan D. W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk D. G. Turner AEP: Arrrerr'ca's Errergi I'rrrlrrr.'r

~>TroA+

NRC OPERATING DATA REPORT DOCKET NO. 50- 315 DATE January 5, 2000 COMPLETED BY J. W. Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Dec-99
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 8760.00 219144.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 68.5
20. Unit Availability Factor 0.0 0.0 68.5
21. Unit Capacity Factor (MDC Net) 0.0 0.0 62.5
22. Unit Capacity Factor (DER Net) 0.0 0.0 60.9
23. Unit Forced Outage Rate 100.0 100.0 16.7
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

September 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

I DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit1 DATE January 5, 2000 COMPLETED BY J. W. Minor TELEPHONE 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

December 99 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 12/1/99 12/17/99 12/2/99 12/18/99 12/3/99 12/19/99 12/4/99 12/20/9S 12/5/99 12/21/99 12/6/99 12/22/99 12/7/99 12/23/99 12/8/99 12/24/99 12/9/99 12/25/99 1210/99 12/26/99 12/11/99 12/27/99 12/12/99 12/28/99 12/13/99 12/29/99 12/14/99 12/30/99 12/15/99 12/31S9 12/16/99

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE January 9, 2000.

COMPLETED BY MB Depuydt TELEPHONE 616465-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS December 1999 METHOD OF SHUTnNG LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 333 090897 F 744.0 97-010 N/A N/A The unit remained shutdown to resolve design 97-011 N/A N/A basis questions discovered during the NRC 97-012 N/A N/A Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) file E: Operator Training and (NUREG 0161)

License Examination f: Administrative G: Operational Error (Explain)

H: Other (Explain)

A ~ ~

Distri63.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients: Copies:

J Stang 1 Not Found Internal Recipients:

RGN 3 1 Not Found RES/DRAA/OERAB 1 Not Found 0 A/PAD 1 Not Found'ot CENTE 1 Found 1 Not Found External Recipients:

NRC PDR Not Found NOAC. Not Found INEEL Marshall Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993500245

Subject:

Monthly operating report for D. C. Cook Nuclear Plant, Unit 1. With 99 1208 letter.

Body:

PDR,ADOCK 05000315 R Docket: 05000315, Notes: N/A Page 1

0 '

Mi49106 616465 5001 mi INQlklNA NICNIGQM PQSMR December 8, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 1999 is submitted.

Sincerely, R. C. Godley Regulatory Affairs Director RCG/mbd Attachments ANI Nuclear Engineering Department A. C. Bakken, III G. T. Gaffney Canton D. R. Hahn Department of Health S. Hamming Department of Labor INPO Records Center G. John B. Lewis McGraw-Hill Companies D. H. Malin NRC Project Manager NRR NRC Region III NRC Resident Inspector T. P. Noonan D. W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk D. G. Turner

NRC OPERATING DATA REPORT DOCKET NO. 50- 315 DATE December 3, 1999 COMPLETED BY J. W. Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit1
2. Reporting Period Nov-99
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Efectrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 8016.00 218400.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 68.7
20. Unit Availability Factor 0.0 0.0 68.7
21. Unit Capacity Factor (MDC Net) 0.0 0.0 62.7
22. Unit Capacity Factor (DER Net) 0.0 0.0 61.1
23. Unit Forced Outage Rate 100.0 100.0 16.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

September 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit 1 DATE December 3, 1999 COMPLETED BY J. W. Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

November 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 11/1/99 0 11/1 7/99 11/2/99 0 11/1 8/99 11/3/99 0 11/19/99 11/4/99 0 11/20/99 11/5/99 0 11/21/99 11/6/99 0 11/22/99 11/7/99 0 11/23/99 11/8/99 0 11/24/99 11/9/99 0 11/25/99 11/10/99 0 11/26/99

, 11/11/99 0 11/27/99 11/12/99 0 11/28/99 11/1 3/99 0 11/29/99 11/14/99 0 11/30/99 11/15/99 0 11/16/99 0

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE December 6, 1999 COMPLETED BY S. Cherba TELEPHONE 616-465-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS November 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION VO. DATE TYPE'OURS REASON~ REACTOR3 REPORT NO. CODE CODEs TO PREVENT RECURRENCE 333 090897 F 720.0 97-010 N/A N/A The unit remained shutdown to resolve design 97-011 N/A N/A basis questions discovered during the NRC 97-012 N/A N/A Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

V/9/g Distri20.txt Distribution Sheet Priority: Normal From: Stefanie Fountain Action Recipients: Copies:

J Stang Not Found Internal Recipients:

RGN 3. Not Found RES/DRAA/OERAB Not Found OC/DBA/PAD Not Found FILE CENTER 0 Not Found ACRS Not Found External Recipients:

NRC PDR Found NOAC 1 /Found .

INEEL Marshall Not"Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993250001

Subject:

Monthly operating report for October 1999 for Donald C Cook Nuclear Plant Unit 1 Body:

PDR ADOCK,05000315 Docket: 05000315, Notes: N/A Page 1

I

~ >

One Cook Race BickJeae, Ml 49106 6164666661 R

INQIBMA NICWGQN PQSFM November 9, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for October 1999 is submitted.

Sincerely, R. C. Godley Regulatory Affairs Director RCG/mbd Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center A. C. Bakken, III G. T. Gaffney Canton D. R. Hahn Department of Health S. Hamming Department of Labor G. John B. Lewis McGraw-Hill Companies D. H. Malin T. P. Noonan W. Paul Lancaster J. E. Pollock R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk D. G. Turner g~c1 EJ 5 1o/Eilci9 AEI':~IrnerI'ca's Enesg>'nrlner 3

NRC OPERATING DATA REPORT DOCKET NO. 50- 315 DATE November 4, 1999 COMPLETED BY J. W. Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit1
2. Reporting Period Oct-99
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 7320.0 217704.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 68.9
20. Unit Availability Factor 0.0 0.0 68.9
21. Unit Capacity Factor (MDC Net) 0.0 0.0 62.9
22. Unit Capacity Factor (DER Net) 0.0 0.0 61.3
23. Unit Forced Outage Rate 100.0 100.0 16.0
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

September 2000

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE November 4, 1999

. COMPLETED BY J. W. Minor TELEPHONE 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

October 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 10/1/99 10/17/99 0 10/2/99 10/18/99 0 10/3/99 10/19/99 0 10/4/99 10/20/99 0 10/5/99 10/21/99 0 10/6/99 10/22/99 0 10/7/99 10/23/99 0 10/8/99 10/24/99 0 10/9/99 10/25/99 0 10/10/99 10/26/99 0 10/11/99 10/27/99 0 10/12/99 10/28/99 0 10/13/99 10/29/99 0 10/14/99 10/30/99 0 10/15/99 10/31/99 0 10/16/99

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit1 DATE November 5, 1999 COMPLETED BY S. A. Richardson TELEPHONE 616465-5901 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 333 090897 F 744.0 97-010 N/A N/A The unit remained shutdown to resolve design 97-011 N/A N/A basis questions discovered during the NRC 97-012 N/A N/A Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled 8: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)