CATEGORY 1 REGULAT RY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR;9812160112 DOC.DATE: 98/11/30 NOTARIZED: NO FACIL:50-316'Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
American Electric Power Co., Inc.
CENTER,J.F.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000316
SUBJECT:
Monthly operating rept for Nov 1998 for DC Cook Nuclear Plant, Unit 2.With 981207 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
A RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME STANG,J COPIES LTTR ENCL 1
1 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1
1 1
1 1
1 1
1 RGN3 NOAC CENTER 1
1 1
1 1
1 D
'N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
American Electric P Cook Nuclear Plant One Cook Place Bridgman, Ml49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 December 7, 1998 Gentlemen',
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the month of November 1998 is submitted.
Sine
- ely,
~
ooper Plant Manager Ijc Attachment c:
NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis R.P. Powers J.R. Sampson B.L. Bartlett P.A. Barrett J.B. Kingseed D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G. John D.P. Lynch R.G. Pickard G.T. Gaffney 98i2ih0ii2 98ii30 PDR ADOCK 050003ib, R
0 I
N.R.C. OPERATING DATAREPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50 - 316 December 7, 1998 JW Minor 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit2 Nov-98 3411 1133 1090 We) 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 8016.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 183336.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 65.3 65.3 59.5 57.9 19.0
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 December 7, 1998 JW Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
November 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 11/1/98 11/2/98 11/3/98 11/4/98 11/5/98 11/6/98 11/7/98 11/8/98 11/9/98 11/10/98 11/11/98 11/12/98 11/13/98 11/14/98 11/1 5/98 11/16/98 11/17/98 11/18/98 11/19/98 11/20/98 11/21/98 11/22/98 11/23/98 11/24/98 11/25/98 11/26/98 11/27/98 11/28/98 11/29/98 11/30/98 0
0 0
0 0
0 0
0 0
0 0
0 0
0
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 December 7, 1998 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-November 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of November was 0 MWh.
DETAILS 11/01/98 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
'lltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 December 7, 1998 JF Center 616-697-5098 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS - November 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE" HOURS REASON2 REACTOR>
REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F
720.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
1 0
I' v