ML17334A683

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980309 Ltr
ML17334A683
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/28/1998
From: Center J, Cooper D, Minor J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9803190403
Download: ML17334A683 (9)


Text

CATEGORY 1 REGULAT Y INFORM'ATION DISTRIBUTIOh SYSTEM (RIDS)

ACCESSION NBR:9803190403 DOC.DATE: 98/02/28 NOTARIZED:NO DOCKET FACIL:50.-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH'.NAME AUTHOR AFFILIATION CEN1ER, J: F. 'Indiana Michigan Power Co.

MINOR,J.W. . Indiana Michigan Power Co.

COOPER,D.E. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept fo 1998 for Donald C Cook Nuclear Plant, Unit 2. 98 309 1 r.

DISTRIBUTION CODE: IE24D COPIES ECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: E RECIPIENT COPIES .RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 STANG, J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 N 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-,2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

V I, .

I hg C

R I

indiana tAichtgan Power Company Cook Nuclear Plant One Cook Place Bndgman, Ml 49t06 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 March 9, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1998 is submitted.

Sincere, D.E. Co per Plant Manager

/jc Attachment c: NRC Region III D.R. Hahn

-. R.C. Callen S. Hamming' B. Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett 9'803i90403 9'802287 PDR, ADQCK 050003%6 R PDRQ IIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

A

%~i, ~

@e~ ia

'f:I>

i 4

I I

N.R.C. OPERATING DATA REPORT DOCKET NO. 50 - 316 DATE March 6, 1998 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Feb-98
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 672.0 1416.0 176736.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) . 0.0 , 0.0 1.14257779.0
19. Unit Service Factor ..0.0 0.0. 67.8,
20. Unit Av'ailability Factor "

0.0 0.0 67.8

21. Unit Capacity Factor (MDC Net) 0.0 0.0 61.7
22. Unit Capacity Factor (DER Net) 0.0 0.0 60.1
23. Unit Forced Outage Rate NA NA 14.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE March 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

February 1998 DAY AVERAGE DAILY. DAY AVERAGE DAlLY POWER LEVEL POWER LEVEL 2/1/9S 0 2/17/98 0 2/2/98 0 2/18/98 0 2/3/98 0 2/19/98 0 2/4/98 0 2/20/98 0 2/5/98 0 2/21/98 0 2/6/98 0 2/22/98 0 2/7/98 0 2/23/98 0 2/8/98 0 2/24/98 0 2/9/98 0 2/25/98 0 2/10/98 0 2/26/98 0 2/11/9S 0 2/27/98 0 2/12/98 0 2/28/98 0 2/13/98 0 0 "2/14/98 0 0 2/15/98 "0 0 2/16/98 0

,I V

I '(

~

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE March 6, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of 1 MONTHLYOPERATING ACTIVITIES - February 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of February was 0 MWh.

DETAILS 02/28/98 n/a U2R97 Cycle 11 - 12 refueling outage continues.

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit2-DATE March 6,-1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - February 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON~ REACTOR~ REPORT NO. CODE'ODE~ TO PREVENT RECURRENCE 334 101297 S 744.0 4 N/A N/A N/A The unit entered the period in a scheduled refueling outage.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)