Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 1
ML17335A173
Person / Time
Site: Cook 
Issue date: 07/31/1998
From: Center J, Cooper D, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9808180320
Download: ML17335A173 (8)


Text

CATEGORY j.

REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS) r ACCESSION NBR:9808180320 DOC.DATE: 98/07/31 NOTARIZED: NO DOCKET I FACIL:50;315 J)onald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NM4E

~

AUTHOR AFFILIATION MINOR,J.W.

Indiana Michigan Power Co.

CENTER,J.F.

Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for July 1998 for DC Cook Nuclear Plant Unit 1.W/980806 ltr.

DISTRIBUTION CODE..IE24D COPIES RECEIVED:LTR 1

ENCL 1

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

A T

RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME STANG,J RGN NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

0 U

M E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

American ElectricP~

Cook Huctear Plant One Cook Place Bndgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 August 6, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1

Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1998 is submitted.

Since ely,

.E. Cooper Plant Manager ljc Attachment NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis J.R. Sampson B.L. Bartlett P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G. John D.P. Lynch R.G. Pickard G.T. Gaffney

'P808i80320 9807Si PDR, ADGCK 050003i5

.,R PDR

i

N.R.C. OPERATING DATA REPOR

(

I DOCKET NO.

DATE COMPLETED BY TELEPHONE 50- 315 August 4, 1998 JW Minor 616-465-5901 D. C OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS MWe)
7. Maximum Dependable Capacity (Net MWe)

Cook Unit1 Jul-98 3250

. 1152 1020 1056 1000 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, IfAny (Net Mwe):
10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 5088.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 206712.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 72.7 72.7 66.3 64.7 10.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 315 D.C. Cook Unit1 August 4, 1998 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

July 1998 DAY AVERAGE DAILY "POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 7/1/98 7/2/98 7/3/98 7/4/98 7/5/98 7/6/98 7/7/98 7/8/98 7/9/98 7/10/98 7/11/98 7/12/98 7/13/98 7/14/98 7/15/98 7/16/98 7/17/98 7/18/98 7/19/98 7/20/98 7/21/98 7/22/98 7/23/98 7/24/98 7/25/98 7/26/98 7/27/98 7/28/98 7/29/98 7/30/98 7/31/98

P=

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit1 August 4, 1998 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-July 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation, for the month of July was 0 MWh.

DETAILS 07/01/98 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

Alltimes are in Eastern Standard Time (EST).

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit1 August 4, 1998 "

~

JF Center 616-697-5098 1 of1 UNlTSHUTDOWNS AND POWER REDUCTIONS - July 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE'OURS REASON REACTOR REPORT NO.

CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

744.0 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A

- N/A NIA N/A N/A NIA NIA N/A N/A NIA The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source