ML17335A483
| ML17335A483 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/31/1998 |
| From: | Center J, Cooper D, Minor J AMERICAN ELECTRIC POWER CO., INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9901210147 | |
| Download: ML17335A483 (6) | |
Text
CATEGORY j.
REGULAT Y INFORMATION DISTRIBUTIOh SYSTEM (RIDS) e A
ACCESSION NBR:9901210147 DOC.DATE: 98/12/31 NOTARIZED: NO DOCKET ¹ FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME.
AUTHOR AFFILIATION MINOR,J.W.
American Electric Power Co., Inc.
CENTER,J.F.
American Electric Power Co., Inc.
COOPER,D.E.
American Electric Power Co., Inc.,
RECIP.NAME RECIPXENT AFFILIATION
SUBJECT:
Monthly operating rept for Dec 1998 for DC Cook Nuclear Plant, Unit 2.With 990108 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME STANG,J GN3 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
American Electric Po~
Cook Nudear Plant One Cook Place
- Bndgman, heal 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 January 8, 1999 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the month of December 1998 is submitted.
Sincerely, D.E. Cooper Plant Manager ijc Attachment NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis R.P. Powers J.R. Sampson B.L. Bartlett P.A. Barrett J.B. Kingseed D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G. John D.P. Lynch R.G. Pickard G.T. Gaffney I
~l 990iai0i47 98i23i PDR ADOCK 050003i6 R
/ t 1
~~
I
t
~
~
~
N.R.C. OPERATING DATAREPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50 - 316 January 8, 1999 JW Minor 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit 2 Dec-98 3411 1133 1090 We) 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 8760.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 184080.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 65.0 65.0 59.2 57.7 19.4
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
P INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 316 D.C. Cook Unit 2 January 8, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
December 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 12/1/98 12/2/98 12/3/98 12/4/98 12/5/98 12/6/98 12/7/98 12/8/98 12/9/98 12/1 0/98 12/11/98 12/12/98 12/13/98 12/14/98 12/15/98 12/16/98 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 12/1 7/98 12/18/98 12/19/98 12/20/98 12/21/98 12/22/98 12/23/98 12/24/98 12/25/98 12/26/98 12/27/98 12/28/98 12/29/98 12/30/98 12/31/98
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 January 8, 1999 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-December 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of December was 0 MWh.
DETAILS'2/01/98 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
'lltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 January 8, 1999 JF Center 616-697-5098 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS - December 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F
744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source