Text
.R.C. OPERATING DATAREPORT
~
~
DOCKET NO.
50 - 316 DATE May 15, 1998 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit2 Mar-98 3411 1133 1090 We) 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 2160.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 177480.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 67.5 67.5 61.5 59.9 155
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
'7805270365 9805i8 PDR ADQCK 0500OSib R
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 316 D.C. Cook Unit 2 May 15, 1998 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
March 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 3/1/98 3/2/98 3/3/98 3/4/98 3/5/98 3/6/98 3/7/98 3/8/98 3/9/98 3/10/98 3/11/98 3/12/98 3/13/98 3/14/98 3/15/98 3/16/98 3/17/98 3/18/98 3/19/98 3/20/98 3/21/98 3/22/98 3/23/98 3/24/98 3/25/98 3/26/98 3/27/98 3/28/98 3/29/98 3/30/98 3/31/98
~I
~ '
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 May 15, 1998 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-March 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of March was 0 MWh.
DETAILS 01/07/98 1800 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
Alltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit2
~
May 15, 1998 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE'OURS REASON~
REACTOR3 REPORT NO.
CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F
744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source