CATEGORY 1 REGULAT KY INFORMATXON DISTRIBUTIO SYSTEM (RXDS)
ACCESSION NBR:9902230283 DOC.DATE: 99/01/31 NOTARIZED: NO FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
AUTH.NAME AUTHOR AFFILIATION MXNOR,J.W.
American Electric Power Co., Inc..
CENTER,J.F.
American Electric Power Co., Inc.
COOPER,D.E.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000316
SUBJECT:
Monthly operating rept for Jan 1999 for DCCNP,Unit 2.With 990208 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
A T
RECIPIENT ID CODE/NAME PD3-3 PD XNTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME STANG,J E CENT NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL nRIDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
American Electric P M149106 6164665901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 February 8, 1999 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of January 1999 is submitted.
Sincer y
D.. Cooper Plant Manager Ijc Attachment C:
NRC Region III INPO Records Center ANI Nuolear Engineering Department D.R. Hahn S. Hamming B. Lewis R.P. Powers J.R. Sampson B.L. Bartlett P.A. Barrett J.B. Kingseed D.W. Paul W.H. Schalk D.G. Turner R.G. Pickard G.T. Gaffney
'rr'it02230283 990i3i PDR ADQCK"OM003ih R
PDR ~
rKlr~lrrrerica's Errergt'arlner"
N.R.C. OPERATING DATAREPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50- 316 February 4, 1999 JW Minor 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit 2 Jan-99 3411 1133 1090 We) 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 184824.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 64.7 64.7 59.0 57.4 19.8
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
I INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
(
~
~
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 february 4, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
January 1999 DAY 1/1/99 1/2/99 1/3/99 1/4/99 1/5/99 1/6/99 1/7/99 1/8/99 1/9/99 1/10/99 1/11/99 1/12/99 1/13/99 1/14/99 1/15/99 1/16/99 AVERAGE DAILY POWER LEVEL DAY 1/17/99 1/1 8/99 1/19/99 1/20/99 1/21/99 1/22/99 1/23/99 1/24/99 1/25/99 1/26/99 1/27/99 1/28/99 1/29/99 1/30/99 1/31/99 AVERAGE DAILY POWER LEVEL
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 February 4, 1999 JF Center 616-697-5098 1 of1 HIGHLIGHTS MONTHLYOPERATING ACTIVITIES-January 1999 The unit entered this reporting period in Mode 5 at 0% RTP.,
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electricai generation for the month ofJanuary was 0 MWh.
DETAILS 01/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
Alltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 February 4, 1999 JF Center 616497-5098 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS January 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE HOURS REASON REACTOR REPORT NO.
CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 335 010798 F
744.0 N/A N/A The unit remained shutdovm to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
~
4 v
ri