ML17334A648
| ML17334A648 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/31/1998 |
| From: | Center J, Minor J, Sampson J INDIANA MICHIGAN POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9802200253 | |
| Download: ML17334A648 (13) | |
Text
CATEGORY 1 ~
REGULATORY INFORMATION DISTRIBUTXOlPKYSTEM (RIDS)
ACCESSION NBR:9802200253 DOC.DATE: 98/01/31 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
American Electric Power Co., Inc.
CENTER,J.F.
American Electric Power Co., Inc.
SAMPSON,J.R.
American Electric Power Co., Inc.
RECIP.NAME RECXPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jan 1998 for DC Cook Nuclear Plant, Unit 2.W/980209 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-3 PD COPIES RECIPIENT LTTR ENCL
~
XD CODE/NAME 1
1 HICKMAN,J COPIES LTTR ENCL 1
1 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1
1 1
1 1
1 1
RGhf3 NOAC CENT 1
1 1
1 1
1 D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
il" l I ty
tndiana Michigan Power Company Cook Nudear Plant One Cook Place Bndgman, Ml49t06 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 February 9, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1998 is submitted.
Sincerely, J.R. Sampson Plant Manager, fjc Attachment c:
NRC Region III D.R. Hahn
- R.C. Callen
'. 'amming B.
Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk," ~~ '2 D.G. Turner B.L. Bartlett 9802200253
'MOi3f.
j PDR ADOCK 050003lb R
PDR }
IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII
l
N.R.C. OPERATING DATAREPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50 - 316 February 6, 1998 JW Minor 616-465-5901 D. C OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS MWe)
- 7. Maximum Dependable Capacity (Net MWe)
Cook Unit2 Jan-98 3411 1133 1090 1100 1060 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9.
Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 NA Year-to-Date 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 NA Cumulative 176064.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 68.0 68.0 62.0 60.4 14.3
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 February 6, 1998 JW Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
January 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1/1/98 1/2/98 1/3/98 1/4/98 1/5/98 1/6/98 1/7/98 1/8/98 1/9/98 1/1 0/98 1/11/98 1/12/98 1/13/98 1/14/98 1/15/98 1/16/98 1/17/98 1/18/98 1/19/98 1/20/98 1/21/98 1/22/98 1/23/98 1/24/98 1/25/98 1/26/98 1/27/98 1/28/98 1/29/98 1/30/98 1/31/98 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 February 6, 1998 JF Center 616-697-5098 1 of1 HIGHLIGHTS MONTHLYOPERATING ACTIVITIES-January 1998 The unit entered this reporting period in Mode 6 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of January was 0 MWh.
DETAILS*
01/31/98 n/a U2R97 Cycle 11 -12 refueling outage continues.
Alltime entries are Eastern Standard Time (EST).
DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 February 6, 1998.
JF Center 616-697-5098 1 of1 UNITSHUTDOWNS AND POWER REDUCTIONS - January 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE" HOURS REASON2 REACTOR>
REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 334 101297 S
744.0 N/A N/A N/A The unit entered the period in a scheduled refueling outage.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
Indiana Michigan Power Company Cook Muciear Piant One Cook Place Bridgman, MI49106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 February 9, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1998 is submitted.
Sincerely, J.R. Sampson Plant Manager fjc Attachment NRC Region III D.R. Hahn R.C. Callen S.
Hamming B.
Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett
t l
N.R.C. OPERATING DATAREPORT DOCKET NO.
50- 315 DATE February 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit 1 Jan-98 3250 1152 1020 We) 1056 1000 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net Mwe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 202368.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 74.3 74.3 67.8 66.1 7.9
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50 - 315 D.C. Cook Unit1 February 6, 1998 JW Minor 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
January 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1/1/98 1/2/98 1/3/98 1/4/98 1/5/98 1/6/98 1/7/98 1/8/98 1/9/98 1/10/98 1/11/98 1/12/98 1/13/98 1/14/98 1/15/98 1/16/98 1/17/98 1/18/98 1/1 9/98 1/20/98 1/21/98 1/22/98 1/23/98 1/24/98 1/25/98 1/26/98 1/27/98 1/28/98 1/29/98 1/30/98 1/31/98
0 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 February 6, 1998 JF Center 616497-5098 1 of1 MONTHLYOPERATING ACTIVITIES-January 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of January was 0 MWh.
DETAILS 10/01/97 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
Alltimes are in Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1
~
February 6, 1998.
JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F
744.0 97-010 97-011 97-012 97-013 97-014 97-016 NIA NIA N/A N/A N/A NIA NIA N/A NIA N/A N/A NIA The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation ofdata entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source