ML17334A648

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2.W/980209 Ltr
ML17334A648
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/31/1998
From: Center J, Minor J, Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9802200253
Download: ML17334A648 (13)


Text

CATEGORY 1 ~

REGULATORY INFORMATION DISTRIBUTXOlPKYSTEM (RIDS)

ACCESSION NBR:9802200253 DOC.DATE: 98/01/31 NOTARIZED: NO DOCKET FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME >

AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc.

CENTER,J.F. American Electric Power Co., Inc.

SAMPSON,J.R. American Electric Power Co., Inc.

RECIP.NAME RECXPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1998 for DC Cook Nuclear Plant, Unit 2.W/980209 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ~ XD CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMAN,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CENT 1 1 OC/DBA/PAD 1 RGhf3 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

il" l

I ty

tndiana Michigan Power Company Cook Nudear Plant One Cook Place Bndgman, Ml49t06 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 February 9, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1998 is submitted.

Sincerely, J.R. Sampson Plant Manager, fjc Attachment c: NRC Region III D.R. Hahn

'. 'amming

R.C. Callen .,

B. Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk,"

D.G. Turner

~~ '2 B.L. Bartlett 9802200253 'MOi3f. j IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII PDR ADOCK 050003lb R PDR }

l N.R.C. OPERATING DATA REPORT DOCKET NO. 50 - 316 DATE February 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C Cook Unit2
2. Reporting Period Jan-98
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 176064.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 0.0 68.0
20. Unit Availability Factor 0.0 0.0 68.0
21. Unit Capacity Factor (MDC Net) 0.0 0.0 62.0
22. Unit Capacity Factor (DER Net) 0.0 0.0 60.4
23. Unit Forced Outage Rate NA NA 14.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE February 6, 1998 COMPLETED BY JW Minor TELEPHONE 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

January 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 1/1/98 1/17/98 0 1/2/98 1/18/98 0 1/3/98 1/19/98 0 1/4/98 1/20/98 0 1/5/98 1/21/98 0 1/6/98 1/22/98 0 1/7/98 1/23/98 0 1/8/98 1/24/98 0 1/9/98 1/25/98 0 1/1 0/98 1/26/98 0 1/11/98 1/27/98 0 1/12/98 1/28/98 0 1/13/98 1/29/98 0 1/14/98 1/30/98 0 1/15/98 1/31/98 0 1/16/98

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE February 6, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - January 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of January was 0 MWh.

DETAILS*

01/31/98 n/a U2R97 Cycle 11 -12 refueling outage continues.

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE February 6, 1998.

COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE" HOURS REASON2 REACTOR> REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 334 101297 S 744.0 N/A N/A N/A The unit entered the period in a scheduled refueling outage.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

Indiana Michigan Power Company Cook Muciear Piant One Cook Place Bridgman, MI 49106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 February 9, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1998 is submitted.

Sincerely, J.R. Sampson Plant Manager fjc Attachment NRC Region III D.R. Hahn R.C. Callen S. Hamming B. Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett

t N.R.C. OPERATING DATA REPORT l

DOCKET NO. 50- 315 DATE February 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Jan-98
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 202368.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 74.3
20. Unit Availability Factor 0.0 0.0 74.3
21. Unit Capacity Factor (MDC Net) 0.0 0.0 67.8
22. Unit Capacity Factor (DER Net) 0.0 0.0 66.1
23. Unit Forced Outage Rate 100.0 100.0 7.9
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit1 DATE February 6, 1998 COMPLETED BY JW Minor TELEPHONE 616465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

January 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 1/1/98 1/17/98 1/2/98 1/18/98 1/3/98 1/1 9/98 1/4/98 1/20/98 1/5/98 1/21/98 1/6/98 1/22/98 1/7/98 1/23/98 1/8/98 1/24/98 1/9/98 1/25/98 1/10/98 1/26/98 1/11/98 1/27/98 1/12/98 1/28/98 1/13/98 1/29/98 1/14/98 1/30/98 1/15/98 1/31/98 1/16/98

0 DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit 1 DATE February 6, 1998 COMPLETED BY JF Center TELEPHONE 616497-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - January 1998 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of January was 0 MWh.

DETAILS 10/01/97 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

All times are in Eastern Standard Time (EST).

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 ~

DATE February 6, 1998.

COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 333 090897 F 744.0 97-010 NIA NIA The unit was shutdown to resolve design 97-011 NIA N/A basis questions discovered during the NRC 97-012 N/A NIA Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 NIA NIA 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)