Addendum to Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2
ML17334B789
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/31/1998
From: Minor J
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17334B788 List:
References
NUDOCS 9805270361
Download: ML17334B789 (5)


Text

~

~

~

N.R.C. OPERATING DATAREPORT DOCKET NO.

50 - 316 DATE May 15, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS M
7. Maximum Dependable Capacity (Net MWe)

D. C. Cook Unit 2 Jan-98 3411 1133 1090 We) 1100 1060 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:

9.

Power Level To Which Restricted, IfAny (Net MWe):

10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. UnitAvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 744.0 0.0 0.0 0.0 0.0 0.0'.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 176064.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 68.0 68.0 62.0 60.4 14.7
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved 9805270361 9805%8 PDR ADOCK 050003l6

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50- 316 D.C. Cook Unit 2 May 15, 1998 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

January 1998 DAY 1/1/98 1/2/98 1/3/98 1/4/98 1/5/98 1/6/98 1/7/98 1/8/98 1/9/98 1/1 0/98 1/1 1/98 1/12/98 1/13/98 1/14/98 1/15/98 1/16/98 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

DAY 1/17/98 1/18/98 1/19/98 1/20/98 1/21/98 1/22/98 1/23/98 1/24/98 1/25/98 1/26/98 1/27/98 1/28/98 1/29/98 1/30/98 1/31/98 AVERAGE DAILY POWER LEVEL

I Q<v

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 May 15, 1998 JF Center 616-697-5098 1 of 1 MONTHLYOPERATING ACTIVITIES-January 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves. '

Gross electrical generation for the month of January was 0 MWh.

DETAILS*

01/07/98 1800 U2R97 Cycle 11 - 12 refueling outage declared complete. Unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

The unit was initiallyshutdown 09/08/97.

Alltime entries are Eastern Standard Time (EST).

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 May 15, 1998 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE'OURS REASON REACTOR REPORT NO.

CODE CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 334 101397 S

335 010798 F

162.0 582.0 N/A N/A N/A N/A N/A N/A The unit entered the period in a scheduled refueling outage.

The refueling outage was declared complete, but the unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report.(LER) File (NUREG 0161) 5 COMPONENT: