CATEGORY 1 REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NBR:9711200047 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 Ar7TH AN'AME AUTHOR AFFILIATION
. CENTER,J.F.
MINOR',J.W.
SAMPSON,J.R.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Oct 1997 for Donald C Cook Nuclear Plant, Unit 1.W/971110 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
A T
RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN3 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J FILE CE 0
BA/PAD COPIES LTTR ENCL 1
1 1
1 1
1 0
R EXTERNAL: LITCO BRYCE,J H NRC PDR 1
1 1
1 NOAC 1
1 0
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES. RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
3
~
b Y
I II
~
C
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, MI49106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 November 10, 1997 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of October 1997 is submitted.
Sincerely,g/~,
J.R. Sampson Plant Manager Ijc Attachment
'RC Region III D.R. Hahn R.C. Callen S.
Hamming-B.
Lewis INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett S.J. Brewer D.W. Paul J.A. Kobyra D.L. Noble W.H. Schalk D.G. Turner B.L. Bartlett O'
ar u~
I 9711aaooeV 9y<03g PDR ADOCK 05000315 R
PDR LI,'IIIIII!IIIIIIIIIIIIII/IIIIIIIIIIIIIIII
I J.
ill
'I
N.R.C. OPERATING DATAREPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-315 November 10, 1997 JW Minor 616-465-5901 OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt)
- 4. Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe)
- 6. Maximum Dependable Capacity (GROSS M
- 7. Maximum Dependable Capacity (Net MWe)
D. C. Cook Unit 1 Oct-97 3250 1152 1020 We) 1056 1000 Notes:
- 8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net Mwe):
- 10. Reasons For Restrictions, IfAny:
- 11. Hours in Reporting Period
- 12. No. of Hrs.. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Gen. (MWH)
- 17. Gross Electrical Energy Gen. (MWH)
- 18. Net Electrical Energy Gen. (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 7296.0 4698.0 0.0 4612.3 0.0 14390017.0 4714030.0 4546279.0 63.2 63.2 62.3 61.1 21.6 Cumulative 200160.0
, 151285.3
~
463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 75.1 75.1 68.6 66.8 6.6
- 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
- 25. IfShut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
- 26. Units in Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
A
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-315 D.C. Cook Unit1 November 10, 1997 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
October 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 10/1/97 10/2/97.
10/3/97 10/4/97 10/5/97 10/6/97 10/7/97 10/8/97 10/10/97 10/10/97 10/11/97 10/12/97 10/13/97 10/14/97 10/15/97 10/16/97 10/17/97 10/18/97 10/1 10/97 10/20/97 10/21/97 10/22/97 10/23/97 10/24/97 10/25/97 10/26/97 10/27/97 10/28/97 10/210/97 10/30/97 10/31/97
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit1 November 7, 1997 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-October 1997 HIGHLIGHTS The unit entered this reporting'period in:Mode, 5,at 0% RTP."
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of October was 0 MWh.
DETAILS 10/01/97 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
AIItimes are in Eastern Standard Time (EST).
DOCKET NO.
UNIT NAME DATE
- COMPLETED BY TELEPHONE PAGE
~
i 50- 315 D.C.Cogk Unit i
'ovember 7, 1997 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 1997 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.
DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5.
CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F
744.0 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source