ML17333A416: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/31/1995
| issue date = 12/31/1995
| title = Revised Monthly Operating Rept for Dec 1995 for DC Cook Nuclear Plant Unit 1
| title = Revised Monthly Operating Rept for Dec 1995 for DC Cook Nuclear Plant Unit 1
| author name = JANISSE J D, TURNER D G
| author name = Janisse J, Turner D
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE 02/Apr/96 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name DE C.Cook Unit 1 2.Reporting Period Dec 1995 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 notes Revised 04/01/96 DG Turner 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.Power Level To Which Restricted.
{{#Wiki_filter:N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 02/Apr/96 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
If Any (Net MWe)10.Reasons For Restrictions.
: 1. Unit Name                 DE C. Cook Unit 1
If Any: 11.Hours in Reporting Period 12.No~of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six This Mo.Yr.to Date 744.0 8760.0 716.7 6081.4 0.0 0.0 591.2 5810.5 0.0 0.0 1666704 17297303 535600 5606930 513907 5396784 79.5 66.3 79.5 66.3 69.1 61.6 67.7 60.4 10.9 14.6 Months (Type, Date,and Cumm.184080.0 137992.3 463.0 135634.1 321.0 399417881 129612370 124678099 74.5 74.5 67.5 65.8 6.2 Duration):
: 2. Reporting Period                         Dec 1995 notes
25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
: 3. Licensed Thermal Power (MWt)                 3250   Revised
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved 9'b04120i45 9b040lPDR ADQCK 050003l5 PDR  
: 4. Name Plate Rating (Gross MWe)               1152   04/01/96
~l g~}}
: 5. Design Electrical Rating (Net MWe)           1020   DG Turner
: 6. Maximum Dependable Capacity (GROSS MWe) 1056
: 7. Maximum Dependable Capacity (Net MWe)       1000
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through       7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted.     If Any (Net MWe)
: 10. Reasons For Restrictions. If Any:
This  Mo. Yr. to Date      Cumm.
: 11. Hours in Reporting Period                 744.0      8760.0    184080.0
: 12. No ~ of Hrs. Reactor Was Critical       716.7      6081.4    137992.3
: 13. Reactor Reserve Shutdown Hours               0.0          0.0      463.0
: 14. Hours Generator on Line                   591.2      5810.5    135634.1
: 15. Unit Reserve Shutdown Hours                 0.0          0.0      321.0
: 16. Gross Therm. Energy Gen. (MWH)         1666704    17297303    399417881
: 17. Gross Elect. Energy Gen. (MWH)           535600      5606930  129612370
: 18. Net Elect. Energy Gen. (MWH)             513907      5396784  124678099
: 19. Unit Service Factor                       79.5        66.3        74.5
: 20. Unit Availability Factor                   79.5        66.3        74.5
: 21. Unit Capacity Factor (MDC Net)           69.1        61.6        67.5
: 22. Unit Capacity Factor (DER Net)           67.7        60.4        65.8
: 23. Unit Forced Outage Rate                   10.9        14. 6          6.2
: 24. Shutdowns Scheduled over Next     Six Months (Type, Date,and Duration):
: 25. If Shut   Down At End of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast     Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9'b04120i45 9b040l PDR  ADQCK 050003l5 PDR
 
~ l g ~}}

Latest revision as of 13:19, 22 October 2019

Revised Monthly Operating Rept for Dec 1995 for DC Cook Nuclear Plant Unit 1
ML17333A416
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1995
From: Janisse J, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17333A411 List:
References
NUDOCS 9604120145
Download: ML17333A416 (2)


Text

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 02/Apr/96 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name DE C. Cook Unit 1
2. Reporting Period Dec 1995 notes
3. Licensed Thermal Power (MWt) 3250 Revised
4. Name Plate Rating (Gross MWe) 1152 04/01/96
5. Design Electrical Rating (Net MWe) 1020 DG Turner
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 8760.0 184080.0
12. No ~ of Hrs. Reactor Was Critical 716.7 6081.4 137992.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 591.2 5810.5 135634.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 1666704 17297303 399417881
17. Gross Elect. Energy Gen. (MWH) 535600 5606930 129612370
18. Net Elect. Energy Gen. (MWH) 513907 5396784 124678099
19. Unit Service Factor 79.5 66.3 74.5
20. Unit Availability Factor 79.5 66.3 74.5
21. Unit Capacity Factor (MDC Net) 69.1 61.6 67.5
22. Unit Capacity Factor (DER Net) 67.7 60.4 65.8
23. Unit Forced Outage Rate 10.9 14. 6 6.2
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9'b04120i45 9b040l PDR ADQCK 050003l5 PDR

~ l g ~