ML18004C001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/17/1986
| issue date = 10/17/1986
| title = Forwards Rev 1 to Comanche Peak Response Team Issue-Specific Action Plan Isap VII.a.9, Adequacy of Purchased Safety- Related Matl & Equipment. Major Tasks in Rev 1 to Isap Listed
| title = Forwards Rev 1 to Comanche Peak Response Team Issue-Specific Action Plan Isap VII.a.9, Adequacy of Purchased Safety- Related Matl & Equipment. Major Tasks in Rev 1 to Isap Listed
| author name = COUNSIL W G
| author name = Counsil W
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee name = NOONAN V S
| addressee name = Noonan V
| addressee affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
| addressee affiliation = NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
| docket = 05000445, 05000446
| docket = 05000445, 05000446
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:X~TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER~400 NORT11 OLIVE 8TREEI', LJL 81~DALLAS.TEXAS 75201 October 17, 1986 Log¹TXX-6043 File¹10068 WILLIAM G.COUNSIL CXCCUTIVC VICC PRCSIDEN'I Director of Nuclear Reactor Regulation ATTN: Vince S.Noonan, Director Comanche Peak Project Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C;20555  
{{#Wiki_filter:Log  ¹ TXX-6043 X   ~
File ¹  10068 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER ~ 400 NORT11 OLIVE 8TREEI', LJL 81 ~ DALLAS. TEXAS 75201 October 17, 1986 WILLIAMG. COUNSIL CXCCUTIVC VICC PRCSIDEN'I Director of Nuclear Reactor Regulation ATTN: Vince S. Noonan,           Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C; 20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)DOCKET NOS.50-445 AND 50-446 REVISION OF CPRT ISSUE-SPECIFIC ACTION PLAN (ISAP)VII.a.9"ADEQUACY OF PURCHASED SAFETY-RELATED MATERIAL AND EQUIPMENT"  
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 REVISION OF CPRT ISSUE - SPECIFIC ACTION PLAN (ISAP)                         VII.a.9 "ADEQUACY OF PURCHASED SAFETY-RELATED MATERIAL AND EQUIPMENT"


==Dear Mr.Noonan:==
==Dear Mr. Noonan:==
Enclosed herewith is Revision 1 to ISAP VII.a.9.Revision 1 is essentially a rewrite of the entire ISAP, wherein the methodology was refocused to directly provide physical verification of compliance with procurement and design requirements specified, by TUGCO and the vendor.The major tasks in revision 1 to the ISAP include the following:
 
Reinspection of accessible physical characteristics of selected purchased safety-related material and equipment; and Evaluation of the adequacy and implementation of the current CPSES procurement program and storage/maintenance program (warehouse only).The results of the implementation of revision 1 to ISAP VII.a.9 wil,l provide specific information about the quality.of purchased safety-related material and equipment as well as the adequacy of the current CPSES QA/QC procurement program and storage/maintenance program.We believe that Revision 1 directly resolves NRC concerns with Revision 0 of ISAP VII.a.9.Should you have any questions please contact me or Mr.John W.Beck.Very truly yours,~X4 W.G.Counsil JCH/amb Enclosure jPc4~gg]oZ~/RO A DIVISION OF TEXAS UTILITIES ELECTRIC COAIPANY (00I f b-i'r P/J J}}
Enclosed herewith is Revision 1 to ISAP VII.a.9. Revision 1 is essentially a rewrite of the entire ISAP, wherein the methodology was refocused to directly provide physical verification of compliance with procurement and design requirements specified, by TUGCO and the vendor. The major tasks in revision 1 to the ISAP include the following:
Reinspection of accessible           physical characteristics               of selected purchased   safety-related material             and equipment;         and Evaluation of the adequacy and implementation of the current CPSES procurement program and storage/maintenance program (warehouse only).
The   results of the implementation of revision 1 to ISAP VII.a.9 wil,l provide specific information about the quality. of purchased safety-related material and equipment as well as the adequacy of the current CPSES QA/QC procurement program and storage/maintenance               program.
We   believe that Revision         1 directly resolves           NRC concerns with Revision 0 of ISAP     VII.a.9. Should you have any questions please contact me or Mr. John W.
Beck.
Very   truly yours,
                                                                                          ~X4 W. G. Counsil JCH/amb Enclosure                                                                                       (00I jPc4~                                       A DIVISION OF TEXAS UTILITIESELECTRIC COAIPANY gg] oZ~/RO
 
f     r  P b-   J
            /J i'}}

Latest revision as of 06:01, 22 October 2019

Forwards Rev 1 to Comanche Peak Response Team Issue-Specific Action Plan Isap VII.a.9, Adequacy of Purchased Safety- Related Matl & Equipment. Major Tasks in Rev 1 to Isap Listed
ML18004C001
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/17/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML18004C002 List:
References
TXX-6043, NUDOCS 8610220120
Download: ML18004C001 (2)


Text

Log ¹ TXX-6043 X ~

File ¹ 10068 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER ~ 400 NORT11 OLIVE 8TREEI', LJL 81 ~ DALLAS. TEXAS 75201 October 17, 1986 WILLIAMG. COUNSIL CXCCUTIVC VICC PRCSIDEN'I Director of Nuclear Reactor Regulation ATTN: Vince S. Noonan, Director Comanche Peak Project Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C; 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 REVISION OF CPRT ISSUE - SPECIFIC ACTION PLAN (ISAP) VII.a.9 "ADEQUACY OF PURCHASED SAFETY-RELATED MATERIAL AND EQUIPMENT"

Dear Mr. Noonan:

Enclosed herewith is Revision 1 to ISAP VII.a.9. Revision 1 is essentially a rewrite of the entire ISAP, wherein the methodology was refocused to directly provide physical verification of compliance with procurement and design requirements specified, by TUGCO and the vendor. The major tasks in revision 1 to the ISAP include the following:

Reinspection of accessible physical characteristics of selected purchased safety-related material and equipment; and Evaluation of the adequacy and implementation of the current CPSES procurement program and storage/maintenance program (warehouse only).

The results of the implementation of revision 1 to ISAP VII.a.9 wil,l provide specific information about the quality. of purchased safety-related material and equipment as well as the adequacy of the current CPSES QA/QC procurement program and storage/maintenance program.

We believe that Revision 1 directly resolves NRC concerns with Revision 0 of ISAP VII.a.9. Should you have any questions please contact me or Mr. John W.

Beck.

Very truly yours,

~X4 W. G. Counsil JCH/amb Enclosure (00I jPc4~ A DIVISION OF TEXAS UTILITIESELECTRIC COAIPANY gg] oZ~/RO

f r P b- J

/J i'