ML18018B724: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~~,-.r~.REGULATOR)
{{#Wiki_filter:~~,   -.r
INFORMATION DISTRIBUTION S TEM (RIDS)ACCCSSION NBR;8408020042 DOC~DATE: 84/07/05 NOTARIZED; NO'DOCKET 0'ACIL:50-,400 Shearon Harris Nuclear Power Planti Unit ii Carolina'5000400 AUTH, NAME AUTHOR AFPILI)TION R>JATSON g R~A~Carolina Power 8 Light Co.REC IP~NAME RECIPIENT AFFILIATION DENTONgH~Rr Office of Nuclear Reactor Regulationi Director SUBJECT;Forwards info in response to Eddleman Contention 9 re environ qualification program,FSAR wil-l be amended to provide description of program.DISTRIBUTION CODE: A048S COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR/Licensing Submittal:
  ~       .             REGULATOR) INFORMATION DISTRIBUTION     S   TEM (RIDS)
E'quipment Qualification NOTES: RECIPIENT'D CODE/NAME NRR LB3 BC 12 INTERNALS ADM~LFMB GC 13 NRR KARSCHzR NRR/DL DIR ie NRR/DS1/AEB RGN2 COPIES LTTR ENCL'1 0 1 0 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME BUCKLEYiB 01 ELD/HDS1 12 IE FILE'9 NRR/DE/EQB 07 0 AB 06 REG FIL 04 COPIES LTTR ENCL 1 1 1 1 1 2 2 1 1 1 1 EXTERNAL: ACRS NRC PDR NTIS 15 02 31 8 8 1 1 1 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 24 0 e h K"I II C 1 I 0 l~f I'I M II fl CIPQ 0 Carolina Power&Light Company SERIAL: NLS-84-343 JUL R5 i9SC Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-400 ENVIRORlENTAL QUALIFICATION PROGRAM  
ACCCSSION NBR;8408020042             DOC   DATE: 84/07/05   NOTARIZED;   NO       'DOCKET Harris Nuclear Power Planti Unit ii Carolina'5000400
                                          ~
Shearon                                                                0'ACIL:50-,400 AUTH, NAME             AUTHOR AFPILI )TION                                 R
    >JATSON g R ~ A ~       Carolina Power 8 Light Co.
REC IP ~ NAME         RECIPIENT AFFILIATION DENTONgH ~ Rr           Office of Nuclear Reactor Regulationi Director SUBJECT;     Forwards info in response to Eddleman Contention 9 re environ qualification program,FSAR wil-l be amended to provide description of program.
DISTRIBUTION CODE: A048S         COPIES RECEIVED:LTR       ENCL       SIZE:
TITLE: OR/Licensing Submittal: E'quipment         Qualification NOTES:
                'DRECIPIENT CODE/NAME COPIES LTTR ENCL RECIPIENT ID CODE/NAME COPIES LTTR ENCL NRR   LB3 BC   12     '1    0    BUCKLEYiB      01      1 INTERNALS ADM~LFMB GC NRR KARSCHzR 13 1
1 0
1 1
IE FILE'9 ELD/HDS1 NRR/DE/EQB 12 07 1
1 2
1 1
2 NRR/DL DIR      ie      1    1          0     AB   06       1     1 NRR/DS1/AEB            1     1     REG  FIL        04      1     1 RGN2                    1     1 EXTERNAL: ACRS                 15      8    8    LPDR            03 NRC PDR         02     1     1     NSIC           05 NTIS            31            1 TOTAL NUMBER OF COPIES         REQUIRED: LTTR     26   ENCL   24
 
0 e
h K
C "I   II 1
I 0
l ~ f     I         'I M
II fl
 
CIPQ 0 Carolina Power & Light Company                   SERIAL:   NLS-84-343 JUL R5 i9SC Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC     20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1   DOCKET NO. 50-400 ENVIRORlENTAL QUALIFICATION PROGRAM
 
==Dear Mr. Denton:==
 
Carolina Power & Light Company hereby provides information in response to Eddleman Contention 9. This information is based on the Shearon Harris Environmental Qualification program. We w111 amend the Final Safety Analysis Report shortly to provide a complete description of our program.
Should you have any questions with regard to                  this issue, please contact Mr. Sherwood R. Z1mmerman at (919) 836-6242.
Yours very      truly, R. A. Watson  Vice            President Harris Nuclear Project PS/cfr  (408PSA)
Cct    Mr. B. C. Buckley (NRC)                                Mr. Wells Eddleman Mr. Bob Legrange (NRC-NRC/EQ)                          Mr. John D. Runkle Mr. Armand Masciantonio (NRC-NRR/EQ)                  Dr. Richard D. Wilson Mr. G. F. Maxwell (NRC-SHNPP)                        Mr. G. 0. Br1ght (ASLB)
Mr. J. P. O'Reilly (NRC-RII)                          Dr. J. H. Carpenter (ASLB)
Mr. Trav1s Payne (KUDZU)                              Mr. J. L. Kelley (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)
Chapel  Hill Public Library Wake County    Public Library 84OBOaOO >  i    5ooo40o pDR ADo                  pDR
* 411 Fayettevitte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602
 
~ ~
SHEARON HARRIS NUCLEAR POWER PLANT ATOMIC SAFETY AND LICENSING BOARD EDDLEMAN CONTENTION NO. 9 9A. The proposed  resolution    and vendor 's modification for ITT-Barton transmitters has not      been  shown to be adequate.    (Ref. IE Information Notices  81-29,  82-52,  and  83-72).
Res onse  to Contention    9A:
ITT Barton transmitters, model numbers 763 and 764, are supplied to the Shearon Harris project by Westinghouse.
Carolina Power    & Light  Company (CP&L) has addressed    IE Information Notices 81-29, 82-59,    and 83-72 as follows:
Information Notice 81-29 dated September 24, 1981, Equipment Qualification Notice      No. 2  Test Summary Report No. 1 indicated noisy output followed by erroneous output for two DP transmitters and noise followed by erroneous output for 40 minutes for one pressure transmitter (Model 763 and 764 ITT Barton). CP&L did not take any action at that time because    the manufacturer was investigating the failures, concentrating on aging methodology, test set-up, and duplicating test conditions to establish what the failure mechanisms were. There were no corrective actions recommended at that time. Subsequently, as described in IE Notice 82-52, the causes of the problems were identified and corrected. The  transmitters    have been successfully retested.
2~    Information Notice 82-52 dated        December 21,. 1982, Equipment Qualification Notice  No. 2  Test Summary      Report No. 2 indicated that the failure mechanisms had been determined to be bad connections in the connector assembly. Satisfactory resolution of the failures on Information Notice  81-29  also had been established.        The transmitter was successfully retested by Westinghouse.
CP&L  sent all Barton Models 763 and 764 safety-related transmitters back to ITT Barton on November 11, 1982 after receipt of a change notice from Westinghouse for rework (i.e., resoldering connector assemblies).          They are  still  at the factory.
3~    Information Notice 83-72 dated October 28, 1983, Equipment Qualification Notice No. 20  Test Summary Report No. 1 indicated a negative shift in output during initial exposure to operating pressure for the Model 763 pressure transmitter.
The  reported defect had a specific cause which was determined to be creep in the mechanical linkage and the material used to attach the link wire to the bourdon tube and strain-sensing beam.
Since the Model 763 Barton transmitters had already been sent to the factory for rework per Information Notices 81-29 and 82-52, CP&L indicated that the 763 transmitters should remain at ITT Barton until          all corrective hardware modifications could be implemented at the same (401PSA/ccc)
 
I time. Westinghouse has maintained a close    follow  on the Barton transmitter testing    and  will inform  CP&L when qualification testing  and developments    have been  thoroughly evaluated. CP&L will perform an evaluation of the corrective actions to insure that this problem has been corrected, and the results of the evaluation will be documented in the EQ package.
Suppressed    zero transmitters are used to measure pressurizer pressure.
The effect  of  this drift allowance on over-temperature delta T is minimal and can be absorbed.      The effect on low trips and DNB calculations is conservative. Credit is taken for the high trip on loss of load only and this transient is not limiting for      DNB or overpressure protection.
Therefore, Westinghouse has established that the observed excessive negative drift is not a safety concern.
4~ Information Notice 83-72 dated October 28, 1983, Equipment Qualification Notice No. 23  Test Summary Report No. 1 indicated that the Models 763 and 764 transmitters had thermal nonrepeatability which caused results in performance outside Barton's specification.
The  defect was determined to be leakage current through the shafts of the zero and span potentiometers to the mounting bracket.
As  stated before for the Model 763 transmitters, CP&L has indicated that the Model 764 transmitters which have already been sent to ITT Barton for rework per IN 81-29 and IN 82-52 should remain at the factory until all hardware modifications can be implemented at the same time. Westinghouse will maintain a close follow on the Barton transmitter testing and will keep CP&L informed of qualification testing and developments until they have been thoroughly evaluated.        CP&L will perform an evaluation of the corrective actions to insure that this problem has been corrected and the results of the evaluation will be included in the EQ package.
CP&L  believes that the above corrective actions are adequate      to address the concerns expressed in Eddleman Contention 9A.
(401PSA/ccc)
 
9B. There  is not sufficient assurance that the concerns with Limitorque valve operators identified in IE Information Notice 83-72 (except for Items C2, C5, and C7) have been adequately    resolved.
Res onse  to Contention  9B:
The  Information Notice 83-72 (IN 83-72) addressed several concerns with the Limitorque valve operators at the Midland Plant. These concerns were related to:
: 1. Terminal blocks    underrated,  unqualified, unidentifiable (A, B, C9).
: 2. Motor  insulation material    ambient  temperature rating (Cl).
: 3. Orientation of the operators (C3)    ~
: 4. Drain plug  installation (C4).
: 5. Installed  equipment not  in accordance with the purchase order  and EQ program (C6).
: 6. 0-ring qualification uncertain (C8).
Limitorque Corporation has been contacted on several occasions and has provided several written responses to CP&L concerning the above deficiencies. Limitorque concluded that except for the nylon terminal blocks, the above deficiencies were related to lack of information at Midland and thus do not represent actual equipment qualification concerns applicable to Shearon Harris.
However,  it is CP&L's  practice to perform an independent assessment of the applicability of IE Notices and Bulletins to Shearon Harris. To that end, the following assessment is offered:
: 1. Terminal blocks will be field verified on a sample basis using vendor supplied information. The verifier will measure the dimensions of the power and nonpower lead terminal blocks, including the point-to-point distances of the terminal screws, using manufacturer catalog information provided by Limitorque. This field verification will ensure that the terminal blocks provided are the same type that were qualified. If any discrepancies are found, inspected.
                                  ~  remaining safety-related operators will be
: 2. Motor  insulation material is presently being verified in the field as part of our equipment qualification effort. Verification consists of identification of motor insulation class from the motor nameplate data.
For valve operators inside containment insulation class should be RH. If any operators are found not to have RH insulation, Limitorque will be contacted for resolution. No discrepancies have been noted thus far in the  verification process.
: 3. Orientation of the operators is specified on design drawings and is independently verified by the on-site Quality Assurance (QA) organization. (See our response to Eddleman 9E of this submittal.)
(401PSA/ccc)
: 4. Drain plugs are required by the vendor for inside-containment operators. Installation is inspected by site QA and verified on    a sample basis by the site EQ group.
: 5. Safety-related equipment is manufactured under the vendor's facility QA program. Prior to shipment, CP&L, Westinghouse, or Ebasco inspect (both
    'documentation and physical) the equipment and issue a "Quality Release". Upon arrival on site, CP&L QA personnel inspect the equipment prior to release to the field for installation. Thus, the installed equipment is assured to be in accordance with the purchase order and EQ program.
: 6. 0-rings are designed for the specific application  and are qualified  as an integral part of the operator assembly.
Limitorque  EQ reports have been reviewed by Westinghouse, Ebasco, and  CP&L and have been found to be qualified. Except for the above mentioned verifications; no further action is deemed necessary at this time.
(401PSA/ccc)
 
9C. It has  not been demonstrated that the RTDs have been qualified in that the Arrhenius thermal aging methodology employed is not adequate to reflect the actual effects of exposures to temperatures of normal operation and accidents over the times the RTDs could be exposed to those temperatures.    (Ref. NUREG/CR-1466, SAND-79-1561, Predicting Life Expectancy of Complex Equipment Using Accelerated Aging Techniques.)
Res onse  to Contention  9C:
Depending on the application of a piece of equipment, the environment        it  is exposed  to  can vary. The  Shearon  Harris Environmental  Qualification  Program includes Aging, which reflects the intended application. The goal of the aging program is to simulate a certain age of the equipment (40 years) prior to testing under the severe environmental conditions representative of the postulated accident to which    it  must be qualified.
The aging program addresses the types of experiments discussed in Part        II  of NUREG/CR-1466 (SAND    79-1561)  "Predicting  Life Expectancy and  Simulating  Age  of Complex Equipment Using Accelerated Aging      Techniques",
: 1. Failure Mode Tests,
: 2. Capability Tests, and
: 3. Accelerated Aging Tests, as follows:
: 1. Failure Mode Tests  The purpose is to indicate where a change in material, components, or design may lead to enhanced reliability. This is accomplished by exposing the equipment to environments that have higher than use stress levels. With respect to environmental qualification at Shearon Harris, the equipment is subjected to an aging temperature greater than the actual environment temperature it will be subjected to during its installation. All components making up the equipment see this higher temperature, which places the equipment in a high stress condition for a specific period of time usually expressed in many  hours, or days.
: 2. Compatibility Tests  The purpose is to show whether the aging of a specified material is affected by the aging of other materials in the group. As stated in the Failure Mode Tests, all components making up the equipment are aged simultaneously under high stress conditions thus accounting for this condition.
: 3. Accelerated Aging Tests    This  is the method employed to age the equipment. Specifically, aging is primarily based on the Arrhenius methodology which is acceptable to the NRC (See NUREG 0588, Section 4-4).
On the Shearon Harris RTDs, CP&L has reviewed the Westinghouse supplied test results and has done a detailed analysis of the results. This analysis included a review of the aging parameters used by Westinghouse with comparison to actual parameters values at Shearon Harris.
Additional information about aging methodology used for the Harris        RTDs  is presented in WCAP-8587, which has been approved by the NRC.
(401PSA/ccc)
 
As  reported in WCAP 8687, Supplement 2  E-05A and E-06A, organic materials in the RTD assemblies are limited to epoxy potting at the cable/probe interface and silicon varnish on the cable lead. With the sealed armor protecting the RTD  cable from the intrusion of moisture, the silicon varnish does  not serve  a critical function. Only the epoxy serves any physical function in    providing some support for wires in the transition from cable to probe body.. Like the varnish, the potting is not a primary seal against moisture in the  event of a Design Basis Event. The other materials are inorganic and are not    age-sensitive.
The  accelerated aging parameters were chosen for an ambient temperature of 50'C with an elevated temperature in the area of the epoxy potting of 50'C above ambient. The elevation of temperature above ambient is the result of heat transfer from the reactor coolant pipe or reactor coolant bypass manifold. Because no age-sensitive material is exposed to the full reactor coolant temperature, there is no reason to perform accelerated aging simulation using that temperature over the intended qualified life. The accelerated thermal aging is described in the respective EQ test reports which have been approved by the NRC.
(401PSA/ccc)
 
9D. The  qualification of instrument cables did not include adequate consideration and analysis of leakage currents resulting from the radiation environment. These leakage currents could cause degradation of signal quality and/or spurious signals in Harris instrument cables.
Res onse  to Contention  9D:
In addressing to the claim that the qualification of instrument cables did not include adequate monitoring of leakage currents during and after tests, it merits noting that IEEE 383-1974, which forms the basis for the cable qualification program at Shearon Harris, does not required monitoring this parameter.
A  review of the methods used in testing cable for Shearon Harris will, however, show that even though leakage current is not a standard measured parameter, other tests that are performed are equal or even haxsher than leakage current measurements.      One of these tests is the post thermal/radiation    test  which  involves  submergence of the aged cable and application  of high  voltages. After  cables  have been aged thermally and received an equivalent    40  year plus  accident  total integrated radiation dose, they are straightened    and  recoiled  with  an  inside  diameter  if  approximately 20 times the cable overall diameter      and  immersed  in  tap  water  at  room temperature. While    still  immersed  these  specimens  should  pass  a voltage withstand test at voltages several times higher          than  required  during  normal operation. If  an insulation breakdown has occurred        during  the  test,  this would show up.
Additionally, in the case of instrument cable where leakage current is a concern, insulation resistance, which can be used to indicate the values of
, leakage  current, is also frequently measured before, during, and after the environmental qualification. A comparison of pre-test to post-test values of
.insulation resistance is done during the test report reviews.
All of  the above tests results are reviewed by        CP&L and  this review is part of the test report review packages.
(401PSA/ccc)
 
t 9E. There is not    sufficient assurance that the physical orientation of equipment in    testing is the same as the physical orientation of equipment installed.
Res onse  to Contention    9E:
The environmental      qualification reports describe and in some cases even provide photographs of the listed equipment orientation/set-up during their testing. The test set-up is reviewed in detail by the design organization with particular attention paid to any limiting conditions. The vendor may test in several orientations, test in the most limiting orientation, test in a single orientation and then analyze other orientations, or simply specify the exact tested orientation. This is also carefully reviewed by the design organization. The results of these reviews are then fed back into the installation drawings and form the basis for field installation. Any orientation questions, discrepancies,        or inconsistencies are resolved with the vendor.
CP&L  then assures    that the equipment is installed per design drawings.
Contractor personnel use only controlled engineering documents to install equipment. A very large quality inspection organization as'sures installation per design through a comprehensive, independent field inspection program using these design documents.        Installation problems identified by the field installation personnel are resolved by design engineering personnel during the installation process. Documentation is maintained as part of plant records justifying the changes, thus allowing for future audit and verification.
Problems that are identified during the inspection process are also evaluated by design engineering personnel.          The non-conforming item is either reworked or justified by design engineering to be acceptable as-is.
Thus,  it is  shown  that this multi-faceted program involving the vendor, design engineering, construction installation personnel, and quality inspection organization ensures that qualified equipment is installed in an orientation consistent with the test program. It should also be noted that in addition to the above, there are various walkdown programs being developed (post installation, post inspection) which will provide an additional overlay of assurance    on  the installation process.
(401PSA/ccc)
 
1 9F. The  effects of radiation  on  lubricants  and seals  has not been adequately addressed  in the environmental qualification    program.
Res onse  to Contention 9F:
The Shearon  Harris harsh environment qualification program uses actual type tests to demonstrate qualification. This includes irradiation of equipment as a whole, including the seals, lubricants, etc., used in the equipment.          As such,  the  effects  of radiation  on  lubricants  and seals  are included  in the qualification of the equipment using these elements. This is documented in the Equipment Qualification packages and is reviewed by CP&L and audited by NRC. In those cases where lubricants, seals, etc., are the limiting component, inspection and replacement requirements are specifically hi-lighted by the EQ program and transmitted to operations personnel for inclusion in the maintenance and surveillance program for the plant.
(401PSA/ccc)
 
E
'c
$
: 90. There  is inadequate assurance that failure to report all results of environmental qualification tests, including failures, has been brought to light in connection with electrical equipment installed in Harris.
This includes past test failures of equipment which subsequently passes an EQ test and test failures of equipment which is said to be qualified by  similarity. (Ref. Item 2, Page 5, L. D. Bustard et    al., Annual Report:  Equipment Qualification Inspection Program, Sandia National Laboratories, FY83.)
Res onse  to Contention  9G:
Environmentally qualified Class    1E electrical components are purchased from vendors who have  CP&L  approved  quality assurance programs. The Vendor Surveillance Unit verifies that the vendor QA program and implementation are acceptable before the vendors are awarded contracts. The acceptance of the vendor's QA program is based on a review of the vendor's QA program manual/procedures and the performance of an on-site facility QA audit. For the SHNPP project, manual reviews and facility audits are performed by CP&L Vendor Surveillance Unit, Ebasco and/or Westinghouse personnel.          During a facility QA audit conducted by CP&L Vendor      Surveillance  Unit  personnel,  a prepared checklist is used which included questions      concerning  verification of design adequacy and design analysis.
After  a  contract has  been awarded,  CP&L  Vendor Surveillance  Specialists perform shop inspections at the vendor's facilities to verify that the requirements of the specification for Class 1E electrical components are being met. During these surveillance visits, the Vendor Surveillance Specialists verify that a report is available for components that require environmental qualification. The CP&L Vendor Surveillance Specialists verify that the report represents the equipment that is being purchased and that the report has been approved by authorized laboratory, vendor, and CP&L personnel.
Ebasco and Westinghouse surveillance 'representatives also perform shop inspections for contracts for which they are responsible. These surveillance representatives verify that electrical component qualification reports are available and that the reports have been approved by authorized laboratory, vendor and Ebasco/Westinghouse personnel.
As  part of the equipment qualification program, a review is done of the results of any testing. If, during this review, anomalies, gaps in testing, sample description discrepancies or improper assumptions are noted, the vendor is contacted. In some instances, visits to the vendors shops by Equipment Qualification Engineers have been made to personally verify the information and inspect the tested equipment.      Additionally, comparison qualification (i-e., qualification by comparison to a similar tested component) is given a careful review to assure proper logic and basis.
Item 2, p. 5 of the Sandia report which is referenced in the contention was addressed  by the Staff in the "Discussion of Sandia Items" attached to the memorandum from William J. Dircks to the Commissioners, dated February 2, 1984. Item 2 is-discussed together with certain other items. There are several inspection reports listed with those items. A review of those reports shows that Item 2 is taken from Inspection Report No. 9990277/83-02, which documents the results of an inspection of The Rockbestos Company conducted on June 20-23 and August 16-17, 1983.
10                            (401PSA/ccc)
 
The Inspection Report (p. 10, ll, and 14) questions the use of the company 's qualification test report f/2806 to qualify their entire 100 series              line of cable, particularly in view of the fact that in the          same  test  used  to qualify RSS-6-104 type cables, four other type cables in the 100            series  line  failed the test.
The Rockbestos    cable company uses    their qualification test report //2806, which describes LOCA testing on R85-6-104 cable, to assert the qualification of their entire 100 series line. No mention is made of the RSS-6-100A, RSS-6-109, RSS-6-110, RSS-6-112 which were also a part of the qualification test used to generate QR2806 and failed.
Shearon Harris uses the RSB-6-104, RSS-6-105 and RSS-6-108 type cables.                  The RSS-6-104 was the model actually tested        and  did  pass  the test. RSS-6-105    and RSS-6-108 are used in the electrical      containment    penetrations    only. A review of the spec sheets for these two models and discussions with Rockbestos have shown that the two cable types are very well represented,            by comparison, to the RSS-6-104 alone. This comparison uses          cable  specifications    such as installation material and thickness, and jacket          material  and  thickness    as comparison variables. As can-be seen by the attached equipment              manufacturing catalog sheets, cable types RSS-6-104 and RSS-6-105 differ only in minor differences in the insulation material. Rockbestos has stated that the RSS-6-105 insulation is a higher quality insulation type than the RSS-6-104 which was successfully tested. The major differences between RSS-6-108 and the tested RSS-6-104 are that the 108 cable is a triaxial cable while the 104 cable is a coaxial cable, and the 108 cable contains the higher quality insulation similar to the      105 cable. Additionally, for the first jacket of the RSS-6-108 cable,    it  can be noted  that the insulation/shielding/jacketing subsequently has a second thick is greater than the RSS-6-104.        The RSS-6-108 shield  and second    jacket. Any comparisons done to    establish qualifications are documented in the equipment qualification documentation packages.
Therefore, the 2806 report can be used to qualify all three types of Rockbestos cable at Shearon Harris.
Shearon  Harris  does not use any of the type cables which        failed during the qualification    program used to generate QR2806.
11                                (401PSA/ccc)
 
      ~~ S C
~
M'\
 
~ O e          ee          ee  w ~e    ~ %~~&4      >@jan @LA AZ ~ ~
RSS-6-108/LE Date << 3/15/83 Tr faxfal Cable    - Low Noise                                    Adverse Servfce                                        Revision -  0
          .460 + .009                .400            .370              .315            .285 + enn7        .064        .n48 I
2nd  Jacket              2nd Shield    1st Jacket      1st Shield          2nd    Insulation  1st Insulation  Conductor Descrfptfon                                          Construction Details Conductor                        18 AtG  Tin  Coated Copper (7x26)    to  ASTH 833 5 B286 1st Insulation                    Roclbestos Polvmer      LE 2nd  Insulatf on                  Radiatior. Cross-Linked,      Low Noise  Treated, Hodf fied Polyoleffn 1st Shield                        33  Q4 Tin  '.ed      Copper  to ASllf 833, 9N      (mfnfnum) coverage 1st Jacket                        Radiation Cross-Linked Fla          Retardan      Non-Corrosive Modified Pol  oleffn 2nd Shield                        33 AV"= Tin Coated Copper to      ASTH 833, 90K (minimum) Coverage 2nd Jacket                        Radiation Cross-Linked, Flame Retardant, Non-Corrosive Modified Polydleffn Flectrtca~tPre erttee Impedance                              72 ohms (nomfnal)
Caoac f tance                            21.7  nf/ft. (nominal)                  For Fnnfneerfnn Velocity                                65". (nominal)                          oefnrence nnlv Dfelectr fc Constant                    2.3 (nomfnal)
              <<Corona Extinction                        10n0 volts (rms} (minimum)
              <<Insulatfon Sesfstance                    106 megohms for 1000      ft.  (mfnfnxim)
              <<Dielectric llftlstand                    5000 volts (rms) (mfnfnxnn) lqng volts (rms) (mfnfrmm) bellmen s~felds Physical Pro rties Me aht
                                  'l;                  140  lh/1000  ft.  (nominal)
Ilfnimum Bend Fa                        Ee5  inches  for  oermanent  installation Environmental Pronertfes Cold Bend                                -4"'C on a 4.75 inch mandrel Flamnabf1 f ty                          <<IorEA S-19-81, Sec. 6.19.6 (September 1977)
This cable      fs suitable for C'lass  1K  service fn nuclear generating stations and meets annlfcahle renufrements of  lEEE 383-1974.      Unless otherwfse  specified, printed legend will include "Rockbestos RSS-6-108/LE. 19XX."
Dimensions are fn inches and are nor'.nal unless othen!fse desfqnated.
Required tests to be run fn accordance        i ith  "ockbestns Test procedures.
    *Production Tests T'IXK ~DCWK3Ke I OR <OWXFWi~~
NEW HAVEN, CONNECTICUT 06504 USA                    TELEPHONE: (203) 772-2250            TELEX: 710-465-2149


==Dear Mr.Denton:==
Carolina Power&Light Company hereby provides information in response to Eddleman Contention 9.This information is based on the Shearon Harris Environmental Qualification program.We w111 amend the Final Safety Analysis Report shortly to provide a complete description of our program.Should you have any questions with regard to this issue, please contact Mr.Sherwood R.Z1mmerman at (919)836-6242.Yours very truly, PS/cfr (408PSA)R.A.Watson-Vice President Harris Nuclear Project Cct Mr.B.C.Buckley (NRC)Mr.Bob Legrange (NRC-NRC/EQ)
Mr.Armand Masciantonio (NRC-NRR/EQ)
Mr.G.F.Maxwell (NRC-SHNPP)
Mr.J.P.O'Reilly (NRC-RII)Mr.Trav1s Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Br1ght (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)84OBOaOO i>5ooo40o pDR ADo pDR*411 Fayettevitte Street~P.O.Box 1551~Raleigh, N.C.27602
~~
SHEARON HARRIS NUCLEAR POWER PLANT ATOMIC SAFETY AND LICENSING BOARD EDDLEMAN CONTENTION NO.9 9A.The proposed resolution and vendor's modification for ITT-Barton transmitters has not been shown to be adequate.(Ref.IE Information Notices 81-29, 82-52, and 83-72).Res onse to Contention 9A: ITT Barton transmitters, model numbers 763 and 764, are supplied to the Shearon Harris project by Westinghouse.
Carolina Power&Light Company (CP&L)has addressed IE Information Notices 81-29, 82-59, and 83-72 as follows: Information Notice 81-29 dated September 24, 1981, Equipment Qualification Notice No.2-Test Summary Report No.1 indicated noisy output followed by erroneous output for two DP transmitters and noise followed by erroneous output for 40 minutes for one pressure transmitter (Model 763 and 764 ITT Barton).CP&L did not take any action at that time because the manufacturer was investigating the failures, concentrating on aging methodology, test set-up, and duplicating test conditions to establish what the failure mechanisms were.There were no corrective actions recommended at that time.Subsequently, as described in IE Notice 82-52, the causes of the problems were identified and corrected.
The transmitters have been successfully retested.2~Information Notice 82-52 dated December 21,.1982, Equipment Qualification Notice No.2-Test Summary Report No.2 indicated that the failure mechanisms had been determined to be bad connections in the connector assembly.Satisfactory resolution of the failures on Information Notice 81-29 also had been established.
The transmitter was successfully retested by Westinghouse.
CP&L sent all Barton Models 763 and 764 safety-related transmitters back to ITT Barton on November 11, 1982 after receipt of a change notice from Westinghouse for rework (i.e., resoldering connector assemblies).
They are still at the factory.3~Information Notice 83-72 dated October 28, 1983, Equipment Qualification Notice No.20-Test Summary Report No.1 indicated a negative shift in output during initial exposure to operating pressure for the Model 763 pressure transmitter.
The reported defect had a specific cause which was determined to be creep in the mechanical linkage and the material used to attach the link wire to the bourdon tube and strain-sensing beam.Since the Model 763 Barton transmitters had already been sent to the factory for rework per Information Notices 81-29 and 82-52, CP&L indicated that the 763 transmitters should remain at ITT Barton until all corrective hardware modifications could be implemented at the same (401PSA/ccc)
I time.Westinghouse has maintained a close follow on the Barton transmitter testing and will inform CP&L when qualification testing and developments have been thoroughly evaluated.
CP&L will perform an evaluation of the corrective actions to insure that this problem has been corrected, and the results of the evaluation will be documented in the EQ package.Suppressed zero transmitters are used to measure pressurizer pressure.The effect of this drift allowance on over-temperature delta T is minimal and can be absorbed.The effect on low trips and DNB calculations is conservative.
Credit is taken for the high trip on loss of load only and this transient is not limiting for DNB or overpressure protection.
Therefore, Westinghouse has established that the observed excessive negative drift is not a safety concern.4~Information Notice 83-72 dated October 28, 1983, Equipment Qualification Notice No.23-Test Summary Report No.1 indicated that the Models 763 and 764 transmitters had thermal nonrepeatability which caused results in performance outside Barton's specification.
The defect was determined to be leakage current through the shafts of the zero and span potentiometers to the mounting bracket.As stated before for the Model 763 transmitters, CP&L has indicated that the Model 764 transmitters which have already been sent to ITT Barton for rework per IN 81-29 and IN 82-52 should remain at the factory until all hardware modifications can be implemented at the same time.Westinghouse will maintain a close follow on the Barton transmitter testing and will keep CP&L informed of qualification testing and developments until they have been thoroughly evaluated.
CP&L will perform an evaluation of the corrective actions to insure that this problem has been corrected and the results of the evaluation will be included in the EQ package.CP&L believes that the above corrective actions are adequate to address the concerns expressed in Eddleman Contention 9A.(401PSA/ccc) 9B.There is not sufficient assurance that the concerns with Limitorque valve operators identified in IE Information Notice 83-72 (except for Items C2, C5, and C7)have been adequately resolved.Res onse to Contention 9B: The Information Notice 83-72 (IN 83-72)addressed several concerns with the Limitorque valve operators at the Midland Plant.These concerns were related to: 1.Terminal blocks-underrated, unqualified, unidentifiable (A, B, C9).2.Motor insulation material-ambient temperature rating (Cl).3.Orientation of the operators (C3)~4.Drain plug installation (C4).5.Installed equipment not in accordance with the purchase order and EQ program (C6).6.0-ring qualification uncertain (C8).Limitorque Corporation has been contacted on several occasions and has provided several written responses to CP&L concerning the above deficiencies.
Limitorque concluded that except for the nylon terminal blocks, the above deficiencies were related to lack of information at Midland and thus do not represent actual equipment qualification concerns applicable to Shearon Harris.However, it is CP&L's practice to perform an independent assessment of the applicability of IE Notices and Bulletins to Shearon Harris.To that end, the following assessment is offered: 1.Terminal blocks will be field verified on a sample basis using vendor supplied information.
The verifier will measure the dimensions of the power and nonpower lead terminal blocks, including the point-to-point distances of the terminal screws, using manufacturer catalog information provided by Limitorque.
This field verification will ensure that the terminal blocks provided are the same type that were qualified.
If any discrepancies are found,~remaining safety-related operators will be inspected.
2.Motor insulation material is presently being verified in the field as part of our equipment qualification effort.Verification consists of identification of motor insulation class from the motor nameplate data.For valve operators inside containment insulation class should be RH.If any operators are found not to have RH insulation, Limitorque will be contacted for resolution.
No discrepancies have been noted thus far in the verification process.3.Orientation of the operators is specified on design drawings and is independently verified by the on-site Quality Assurance (QA)organization.(See our response to Eddleman 9E of this submittal.)
(401PSA/ccc) 4.Drain plugs are required by the vendor for inside-containment operators.
Installation is inspected by site QA and verified on a sample basis by the site EQ group.5.Safety-related equipment is manufactured under the vendor's facility QA program.Prior to shipment, CP&L, Westinghouse, or Ebasco inspect (both'documentation and physical)the equipment and issue a"Quality Release".Upon arrival on site, CP&L QA personnel inspect the equipment prior to release to the field for installation.
Thus, the installed equipment is assured to be in accordance with the purchase order and EQ program.6.0-rings are designed for the specific application and are qualified as an integral part of the operator assembly.Limitorque EQ reports have been reviewed by Westinghouse, Ebasco, and CP&L and have been found to be qualified.
Except for the above mentioned verifications; no further action is deemed necessary at this time.(401PSA/ccc) 9C.It has not been demonstrated that the RTDs have been qualified in that the Arrhenius thermal aging methodology employed is not adequate to reflect the actual effects of exposures to temperatures of normal operation and accidents over the times the RTDs could be exposed to those temperatures.(Ref.NUREG/CR-1466, SAND-79-1561, Predicting Life Expectancy of Complex Equipment Using Accelerated Aging Techniques.)
Res onse to Contention 9C: Depending on the application of a piece of equipment, the environment it is exposed to can vary.The Shearon Harris Environmental Qualification Program includes Aging, which reflects the intended application.
The goal of the aging program is to simulate a certain age of the equipment (40 years)prior to testing under the severe environmental conditions representative of the postulated accident to which it must be qualified.
The aging program addresses the types of experiments discussed in Part II of NUREG/CR-1466 (SAND 79-1561)"Predicting Life Expectancy and Simulating Age of Complex Equipment Using Accelerated Aging Techniques", 1.Failure Mode Tests, 2.Capability Tests, and 3.Accelerated Aging Tests, as follows: 1.Failure Mode Tests-The purpose is to indicate where a change in material, components, or design may lead to enhanced reliability.
This is accomplished by exposing the equipment to environments that have higher than use stress levels.With respect to environmental qualification at Shearon Harris, the equipment is subjected to an aging temperature greater than the actual environment temperature it will be subjected to during its installation.
All components making up the equipment see this higher temperature, which places the equipment in a high stress condition for a specific period of time usually expressed in many hours, or days.2.Compatibility Tests-The purpose is to show whether the aging of a specified material is affected by the aging of other materials in the group.As stated in the Failure Mode Tests, all components making up the equipment are aged simultaneously under high stress conditions thus accounting for this condition.
3.Accelerated Aging Tests-This is the method employed to age the equipment.
Specifically, aging is primarily based on the Arrhenius methodology which is acceptable to the NRC (See NUREG 0588, Section 4-4).On the Shearon Harris RTDs, CP&L has reviewed the Westinghouse supplied test results and has done a detailed analysis of the results.This analysis included a review of the aging parameters used by Westinghouse with comparison to actual parameters values at Shearon Harris.Additional information about aging methodology used for the Harris RTDs is presented in WCAP-8587, which has been approved by the NRC.(401PSA/ccc)
As reported in WCAP 8687, Supplement 2-E-05A and E-06A, organic materials in the RTD assemblies are limited to epoxy potting at the cable/probe interface and silicon varnish on the cable lead.With the sealed armor protecting the RTD cable from the intrusion of moisture, the silicon varnish does not serve a critical function.Only the epoxy serves any physical function in providing some support for wires in the transition from cable to probe body..Like the varnish, the potting is not a primary seal against moisture in the event of a Design Basis Event.The other materials are inorganic and are not age-sensitive.
The accelerated aging parameters were chosen for an ambient temperature of 50'C with an elevated temperature in the area of the epoxy potting of 50'C above ambient.The elevation of temperature above ambient is the result of heat transfer from the reactor coolant pipe or reactor coolant bypass manifold.Because no age-sensitive material is exposed to the full reactor coolant temperature, there is no reason to perform accelerated aging simulation using that temperature over the intended qualified life.The accelerated thermal aging is described in the respective EQ test reports which have been approved by the NRC.(401PSA/ccc) 9D.The qualification of instrument cables did not include adequate consideration and analysis of leakage currents resulting from the radiation environment.
These leakage currents could cause degradation of signal quality and/or spurious signals in Harris instrument cables.Res onse to Contention 9D: In addressing to the claim that the qualification of instrument cables did not include adequate monitoring of leakage currents during and after tests, it merits noting that IEEE 383-1974, which forms the basis for the cable qualification program at Shearon Harris, does not required monitoring this parameter.
A review of the methods used in testing cable for Shearon Harris will, however, show that even though leakage current is not a standard measured parameter, other tests that are performed are equal or even haxsher than leakage current measurements.
One of these tests is the post thermal/radiation test which involves submergence of the aged cable and application of high voltages.After cables have been aged thermally and received an equivalent 40 year plus accident total integrated radiation dose, they are straightened and recoiled with an inside diameter if approximately 20 times the cable overall diameter and immersed in tap water at room temperature.
While still immersed these specimens should pass a voltage withstand test at voltages several times higher than required during normal operation.
If an insulation breakdown has occurred during the test, this would show up.Additionally, in the case of instrument cable where leakage current is a concern, insulation resistance, which can be used to indicate the values of , leakage current, is also frequently measured before, during, and after the environmental qualification.
A comparison of pre-test to post-test values of.insulation resistance is done during the test report reviews.All of the above tests results are reviewed by CP&L and this review is part of the test report review packages.(401PSA/ccc) t 9E.There is not sufficient assurance that the physical orientation of equipment in testing is the same as the physical orientation of equipment installed.
Res onse to Contention 9E: The environmental qualification reports describe and in some cases even provide photographs of the listed equipment orientation/set-up during their testing.The test set-up is reviewed in detail by the design organization with particular attention paid to any limiting conditions.
The vendor may test in several orientations, test in the most limiting orientation, test in a single orientation and then analyze other orientations, or simply specify the exact tested orientation.
This is also carefully reviewed by the design organization.
The results of these reviews are then fed back into the installation drawings and form the basis for field installation.
Any orientation questions, discrepancies, or inconsistencies are resolved with the vendor.CP&L then assures that the equipment is installed per design drawings.Contractor personnel use only controlled engineering documents to install equipment.
A very large quality inspection organization as'sures installation per design through a comprehensive, independent field inspection program using these design documents.
Installation problems identified by the field installation personnel are resolved by design engineering personnel during the installation process.Documentation is maintained as part of plant records justifying the changes, thus allowing for future audit and verification.
Problems that are identified during the inspection process are also evaluated by design engineering personnel.
The non-conforming item is either reworked or justified by design engineering to be acceptable as-is.Thus, it is shown that this multi-faceted program involving the vendor, design engineering, construction installation personnel, and quality inspection organization ensures that qualified equipment is installed in an orientation consistent with the test program.It should also be noted that in addition to the above, there are various walkdown programs being developed (post installation, post inspection) which will provide an additional overlay of assurance on the installation process.(401PSA/ccc) 1 9F.The effects of radiation on lubricants and seals has not been adequately addressed in the environmental qualification program.Res onse to Contention 9F: The Shearon Harris harsh environment qualification program uses actual type tests to demonstrate qualification.
This includes irradiation of equipment as a whole, including the seals, lubricants, etc., used in the equipment.
As such, the effects of radiation on lubricants and seals are included in the qualification of the equipment using these elements.This is documented in the Equipment Qualification packages and is reviewed by CP&L and audited by NRC.In those cases where lubricants, seals, etc., are the limiting component, inspection and replacement requirements are specifically hi-lighted by the EQ program and transmitted to operations personnel for inclusion in the maintenance and surveillance program for the plant.(401PSA/ccc)
E$'c 90.There is inadequate assurance that failure to report all results of environmental qualification tests, including failures, has been brought to light in connection with electrical equipment installed in Harris.This includes past test failures of equipment which subsequently passes an EQ test and test failures of equipment which is said to be qualified by similarity.(Ref.Item 2, Page 5, L.D.Bustard et al., Annual Report: Equipment Qualification Inspection Program, Sandia National Laboratories, FY83.)Res onse to Contention 9G: Environmentally qualified Class 1E electrical components are purchased from vendors who have CP&L approved quality assurance programs.The Vendor Surveillance Unit verifies that the vendor QA program and implementation are acceptable before the vendors are awarded contracts.
The acceptance of the vendor's QA program is based on a review of the vendor's QA program manual/procedures and the performance of an on-site facility QA audit.For the SHNPP project, manual reviews and facility audits are performed by CP&L Vendor Surveillance Unit, Ebasco and/or Westinghouse personnel.
During a facility QA audit conducted by CP&L Vendor Surveillance Unit personnel, a prepared checklist is used which included questions concerning verification of design adequacy and design analysis.After a contract has been awarded, CP&L Vendor Surveillance Specialists perform shop inspections at the vendor's facilities to verify that the requirements of the specification for Class 1E electrical components are being met.During these surveillance visits, the Vendor Surveillance Specialists verify that a report is available for components that require environmental qualification.
The CP&L Vendor Surveillance Specialists verify that the report represents the equipment that is being purchased and that the report has been approved by authorized laboratory, vendor, and CP&L personnel.
Ebasco and Westinghouse surveillance
'representatives also perform shop inspections for contracts for which they are responsible.
These surveillance representatives verify that electrical component qualification reports are available and that the reports have been approved by authorized laboratory, vendor and Ebasco/Westinghouse personnel.
As part of the equipment qualification program, a review is done of the results of any testing.If, during this review, anomalies, gaps in testing, sample description discrepancies or improper assumptions are noted, the vendor is contacted.
In some instances, visits to the vendors shops by Equipment Qualification Engineers have been made to personally verify the information and inspect the tested equipment.
Additionally, comparison qualification (i-e., qualification by comparison to a similar tested component) is given a careful review to assure proper logic and basis.Item 2, p.5 of the Sandia report which is referenced in the contention was addressed by the Staff in the"Discussion of Sandia Items" attached to the memorandum from William J.Dircks to the Commissioners, dated February 2, 1984.Item 2 is-discussed together with certain other items.There are several inspection reports listed with those items.A review of those reports shows that Item 2 is taken from Inspection Report No.9990277/83-02, which documents the results of an inspection of The Rockbestos Company conducted on June 20-23 and August 16-17, 1983.-10-(401PSA/ccc)
The Inspection Report (p.10, ll, and 14)questions the use of the company's qualification test report f/2806 to qualify their entire 100 series line of cable, particularly in view of the fact that in the same test used to qualify RSS-6-104 type cables, four other type cables in the 100 series line failed the test.The Rockbestos cable company uses their qualification test report//2806, which describes LOCA testing on R85-6-104 cable, to assert the qualification of their entire 100 series line.No mention is made of the RSS-6-100A, RSS-6-109, RSS-6-110, RSS-6-112 which were also a part of the qualification test used to generate QR2806 and failed.Shearon Harris uses the RSB-6-104, RSS-6-105 and RSS-6-108 type cables.The RSS-6-104 was the model actually tested and did pass the test.RSS-6-105 and RSS-6-108 are used in the electrical containment penetrations only.A review of the spec sheets for these two models and discussions with Rockbestos have shown that the two cable types are very well represented, by comparison, to the RSS-6-104 alone.This comparison uses cable specifications such as installation material and thickness, and jacket material and thickness as comparison variables.
As can-be seen by the attached equipment manufacturing catalog sheets, cable types RSS-6-104 and RSS-6-105 differ only in minor differences in the insulation material.Rockbestos has stated that the RSS-6-105 insulation is a higher quality insulation type than the RSS-6-104 which was successfully tested.The major differences between RSS-6-108 and the tested RSS-6-104 are that the 108 cable is a triaxial cable while the 104 cable is a coaxial cable, and the 108 cable contains the higher quality insulation similar to the 105 cable.Additionally, for the first jacket of the RSS-6-108 cable, it can be noted that the insulation/shielding/jacketing thick is greater than the RSS-6-104.
The RSS-6-108 subsequently has a second shield and second jacket.Any comparisons done to establish qualifications are documented in the equipment qualification documentation packages.Therefore, the 2806 report can be used to qualify all three types of Rockbestos cable at Shearon Harris.Shearon Harris does not use any of the type cables which failed during the qualification program used to generate QR2806.-11-(401PSA/ccc)
~~S C~M'\
~O Tr faxfal Cable-Low Noise RSS-6-108/LE Date<<3/15/83 Revision-0 Adverse Servfce e ee~ee w~e~%~~&4>@jan@LA AZ~~.460+.009.400.370.315.285+enn7.064.n48 2nd Jacket I 2nd Shield 1st Jacket 1st Shield 2nd Insulation 1st Insulation Conductor Descrfptfon Conductor 1st Insulation 2nd Insulatf on 1st Shield 1st Jacket 2nd Shield 2nd Jacket Construction Details 18 AtG Tin Coated Copper (7x26)to ASTH 833 5 B286 Roclbestos Polvmer LE Radiatior.
Cross-Linked, Low Noise Treated, Hodf fied Polyoleffn 33 Q4 Tin'.ed Copper to ASllf 833, 9N (mfnfnum)coverage Radiation Cross-Linked Fla Retardan Non-Corrosive Modified Pol oleffn 33 AV"=Tin Coated Copper to ASTH 833, 90K (minimum)Coverage Radiation Cross-Linked, Flame Retardant, Non-Corrosive Modified Polydleffn Flectrtca~tPre erttee Impedance Caoac f tance Velocity Dfelectr fc Constant<<Corona Extinction
<<Insulatfon Sesfstance
<<Dielectric llftl stand Physical Pro rties Me aht Ilfnimum Bend Fa'l;Environmental Pronertfes Cold Bend Flamnabf1 f ty 72 ohms (nomfnal)21.7 nf/ft.(nominal)65".(nominal)2.3 (nomfnal)For Fnnfneerfnn oefnrence nnlv 10n0 volts (rms}(minimum)106 megohms for 1000 ft.(mfnfnxim) 5000 volts (rms)(mfnfnxnn) lqng volts (rms)(mfnfrmm)bellmen s~felds 140 lh/1000 ft.(nominal)Ee5 inches for oermanent installation
-4"'C on a 4.75 inch mandrel<<IorEA S-19-81, Sec.6.19.6 (September 1977)This cable fs suitable for C'lass 1K service fn nuclear generating stations and meets annlfcahle renufrements of lEEE 383-1974.Unless otherwfse specified, printed legend will include"Rockbestos RSS-6-108/LE.
19XX." Dimensions are fn inches and are nor'.nal unless othen!fse desfqnated.
Required tests to be run fn accordance i ith"ockbestns Test procedures.
*Production Tests T'I-XK~DCWK3Ke I OR<OWXFWi~~NEW HAVEN, CONNECTICUT 06504 USA TELEPHONE:
(203)772-2250 TELEX: 710-465-2149
~'
~'
Cassia!ra!1 e-Loe!!atae Adverse Service RSS-6'-105/L f Date-3/15/83 Revisfon 0.242+.004.173.146+.n04.048 e032 Jacket Shield 2nd Insulation 1st Insulation Conductor Description Conductor 1st Insulation 2nd Insulation Shield Jacket Construction Details 22"'".Tin Coated Copper (lgx34)to ASTi'33 A 8286 Rocgestos Polymer LE tladfatfon Cross-Linked, Low~tofse Treated, tiodfffed Polyoleffn 34 PiRG Tin Coated Conper to ASTli 833, 90"..(Nnfmum)Coverage P~diatfon Cross-Linked, Flame Retardant, Von-Corrosive
RSS-6'-105/L f Date - 3/15/83 Cassia! ra!1 e - Loe !!atae                                Adverse Service                                      Revisfon     0
'hdflfed Polyoleffn Electrical Pro ertfes Impedance Capacitance Velocity Dielectric Constant*Corona'Extinction
            .242 + .004                       .173                       .146 + .n04             .048           e032 Jacket                       Shield               2nd Insulation           1st Insulation Conductor Description                                 Construction Details Conductor                    22 "'". Tin Coated Copper (lgx34) to   ASTi'33   A 8286 1st Insulation                Rocgestos Polymer     LE 2nd Insulation                tladfatfon Cross-Linked, Low ~tofse Treated, tiodfffed Polyoleffn Shield                        34 PiRG Tin Coated Conper to ASTli 833, 90".. (Nnfmum) Coverage Jacket                        P~diatfon Cross-Linked, Flame Retardant, Von-Corrosive 'hdflfed Polyoleffn Electrical   Pro ertfes Impedance                         62 ohns   (nominal)
*Insulation Resistance
Capacitance                        ?5.7 pf/ft. nominal)           For Fnqineerfnn Velocity                          64   (nominal                     Reference denly Dielectric Constant                2.4 (nominal
<<Dielectric Mfthstand Oar~a!col pro erases 62 ohns (nominal)?5.7 pf/ft.nominal)64 (nominal 2.4 (nominal 23PO volts (rms)(mini 1C~megohms for lfi00 ft.(500" volts (rms)(mfnfmsm For Fnqineerfnn Reference denly minimum)Me(I ght ilfnfmum Bend Radius 36.6 lb/1000 ft.(nominal)3.0 inches for permanent installation Cold Bend-4n'C on a 2.5 fnch mandrel Flaiunabflfty
          *Corona'Extinction                  23PO volts (rms) (mini
<<IPCEP.5-10-8'I,.ec.E.l 8.6 (Seotemher 1977)This cable fs suitable~or rla~s lr service in nuclear neneratfno stations and meets annlfcahie rec.ufrements of 1EEE 383-1874.Unless otherwise specified, printed legend will include"Rockbestos RSS-6-105/Lfe lgXX" Dimensions are fn inches and are nominal unless otherwise desfonated.
          *Insulation Resistance              1C~ megohms   for lfi00 ft. ( minimum)
Reoufred Tests to be run ir a" or".ace rftii Rockbestos Test Procedures.
          <<Dielectric Mfthstand              500" volts (rms) (mfnfmsm Oar~a!col pro erases Me(I ght                           36.6 lb/1000   ft. (nominal) ilfnfmum Bend Radius              3.0 inches for permanent installation Cold Bend                         -4n'C on   a 2.5 fnch mandrel Flaiunabflfty                     <<IPCEP. 5-10-8'I, .ec. E.l 8.6 (Seotemher 1977)
<<Production Tests T'&K AOCIZHKB 1 OR C'OMX WN Y NEW HAVEN, CONNECTICUT06504 USA TELEPHONE:
This cable fs suitable ~or rla~s lr service in nuclear neneratfno stations and meets annlfcahie rec.ufrements" of 1EEE 383-1874. Unless otherwise specified, printed legend will include "Rockbestos RSS-6-105/Lfe lgXX Dimensions are fn inches and are nominal unless otherwise desfonated.
(203)772-2250 TELEX: 710465-2149 t~~y~Coaxial.Ci-bl e Adverse Servi 0 Page 13 RSS-6-104 Date-1/20/78 n n-.242+.004.173.146+.004.048.032 Jacket Shield 2nd Insulation 1st insulation Conductor Descrintion Corductor 1st Insulation 2nd Insulation Shield Jacket Constr c 22 A'iG Tin Coated Co oer lgx34 to AS'33 5 8286 Rockbestos Polymer LD Radiation Cross-Linked modified Pol 1efin 34 AMG Tin Coated Cooper to ASTH 833, 90.(!minimum)
Reoufred Tests to be run   ir a" or".ace rftii Rockbestos     Test Procedures.
Coveraoe Radiation Cross-Linked.
  <<Production Tests T'&K AOCIZHKB1 OR                                                         C'OMX WN Y NEW HAVEN, CONNECTICUT06504 USA                   TELEPHONE: (203) 772-2250         TELEX: 710465-2149
Flame Retardant.
 
!Ion-Corrosive tiodified Polyolefin Impedance Capacitance Velocity Dielectric Constant~Corona Extinction
  ~ ~   y ~                                                                                                   Page 13 0
<<Insulation Resistance
t RSS-6-104 Date - 1/20/78 Coaxial .Ci-bl e                                    Adverse Servi                                          n       n-
~Dielectric Mithstand)For Enqineer'inq Peference denly (nominal)25.7 nf/ft.nominal)64" (nominal 2.4 (nominal 23/0 volts (rms){nominal)10'eqohms for 1000 ft.(minimum)5000 volts (rms)(minimum Meight Minimum Bend Radius Environmental Pro erties 36.6 lb/1000 Ft.{nominal)3.0 inches for nermanent installation Cold Bend-40'C on a 2.5 inch mandrel Flaamability
                    .242 + .004               .173                       .146 + .004           .048           .032 Jacket                 Shield               2nd Insulation         1st insulation Conductor Descrintion                         Constr c Corductor                  22 A'iG Tin Coated   Co oer   lgx34   to AS'33 5 8286 1st Insulation              Rockbestos Polymer LD 2nd  Insulation            Radiation Cross-Linked modified Pol 1efin Shield                      34 AMG Tin Coated Cooper to ASTH 833, 90. (!minimum) Coveraoe Jacket                      Radiation Cross-Linked. Flame Retardant. !Ion-Corrosive tiodified Polyolefin Impedance                               (nominal )                 )
~IPCEA 5-19-81, Dec.6.19.6 (Septemher 1977)This cable is suitable for Class lE service in nuclear generating stations and meets annlicable reouirements of 1EEE 383-1974.The cable wi11 operate at temperatures up to 250'C for 1 hour, 171'C for 2 hours, and 150'C for 10 hours.Continuous service uo to 110'C;Dimensions are in inches and are nominal unless othentise desionated.
Capacitance                  25.7 nf/ft. nominal)                   For Enqineer'inq Velocity                      64" (nominal                           Peference denly Dielectric Constant          2.4 (nominal
Pequired tests to he run in accordance uith Rockbestos Test Procedures.
              ~ Corona Extinction            23/0 volts (rms) {nominal)
<<Production Tests 5 HE EC()VI<I)EH I (}H C()LIE~A>i'V NEW HAVEN, CONNECTICUT 06504 USA TELEPHONE:
              <<Insulation Resistance
(203)772-2250 TELEX: 710-465-2149 j'I 4 C 0 4 4}}
              ~ Dielectric Mithstand 10'eqohms for     1000   ft. (minimum) 5000 volts (rms)   (minimum Meight                       36.6 lb/1000 Ft. {nominal)
Minimum Bend Radius          3.0 inches for nermanent installation Environmental Pro erties Cold Bend                     -40'C on a 2.5 inch mandrel Flaamability                 ~ IPCEA 5-19-81, Dec. 6.19.6 (Septemher 1977)
This cable is suitable for Class lE service in nuclear generating stations and meets annlicable reouirements of 1EEE 383-1974. The cable wi11 operate at temperatures up to 250'C for 1 hour, 171'C for 2 hours, and 150'C for 10 hours. Continuous service uo to 110'C; Dimensions are in inches and are nominal unless othentise desionated.
Pequired tests to he run in accordance uith   Rockbestos Test Procedures.
      <<Production Tests 5   HE       EC()VI<I )EH I (}H C()LIE~A>i'V NEW HAVEN, CONNECTICUT 06504 USA               TELEPHONE: (203) 772-2250         TELEX: 710-465-2149
 
  'I 4 j
C 0 4 4}}

Revision as of 04:21, 22 October 2019

Forwards Info in Response to Eddleman Contention 9 Re Environ Qualification Program.Fsar Will Be Amended to Provide Description of Program
ML18018B724
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/25/1984
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-84-343, NUDOCS 8408020012
Download: ML18018B724 (25)


Text

~~, -.r

~ . REGULATOR) INFORMATION DISTRIBUTION S TEM (RIDS)

ACCCSSION NBR;8408020042 DOC DATE: 84/07/05 NOTARIZED; NO 'DOCKET Harris Nuclear Power Planti Unit ii Carolina'5000400

~

Shearon 0'ACIL:50-,400 AUTH, NAME AUTHOR AFPILI )TION R

>JATSON g R ~ A ~ Carolina Power 8 Light Co.

REC IP ~ NAME RECIPIENT AFFILIATION DENTONgH ~ Rr Office of Nuclear Reactor Regulationi Director SUBJECT; Forwards info in response to Eddleman Contention 9 re environ qualification program,FSAR wil-l be amended to provide description of program.

DISTRIBUTION CODE: A048S COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR/Licensing Submittal: E'quipment Qualification NOTES:

'DRECIPIENT CODE/NAME COPIES LTTR ENCL RECIPIENT ID CODE/NAME COPIES LTTR ENCL NRR LB3 BC 12 '1 0 BUCKLEYiB 01 1 INTERNALS ADM~LFMB GC NRR KARSCHzR 13 1

1 0

1 1

IE FILE'9 ELD/HDS1 NRR/DE/EQB 12 07 1

1 2

1 1

2 NRR/DL DIR ie 1 1 0 AB 06 1 1 NRR/DS1/AEB 1 1 REG FIL 04 1 1 RGN2 1 1 EXTERNAL: ACRS 15 8 8 LPDR 03 NRC PDR 02 1 1 NSIC 05 NTIS 31 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 24

0 e

h K

C "I II 1

I 0

l ~ f I 'I M

II fl

CIPQ 0 Carolina Power & Light Company SERIAL: NLS-84-343 JUL R5 i9SC Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-400 ENVIRORlENTAL QUALIFICATION PROGRAM

Dear Mr. Denton:

Carolina Power & Light Company hereby provides information in response to Eddleman Contention 9. This information is based on the Shearon Harris Environmental Qualification program. We w111 amend the Final Safety Analysis Report shortly to provide a complete description of our program.

Should you have any questions with regard to this issue, please contact Mr. Sherwood R. Z1mmerman at (919) 836-6242.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project PS/cfr (408PSA)

Cct Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. Bob Legrange (NRC-NRC/EQ) Mr. John D. Runkle Mr. Armand Masciantonio (NRC-NRR/EQ) Dr. Richard D. Wilson Mr. G. F. Maxwell (NRC-SHNPP) Mr. G. 0. Br1ght (ASLB)

Mr. J. P. O'Reilly (NRC-RII) Dr. J. H. Carpenter (ASLB)

Mr. Trav1s Payne (KUDZU) Mr. J. L. Kelley (ASLB)

Mr. Daniel F. Read (CHANGE/ELP)

Chapel Hill Public Library Wake County Public Library 84OBOaOO > i 5ooo40o pDR ADo pDR

  • 411 Fayettevitte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602

~ ~

SHEARON HARRIS NUCLEAR POWER PLANT ATOMIC SAFETY AND LICENSING BOARD EDDLEMAN CONTENTION NO. 9 9A. The proposed resolution and vendor 's modification for ITT-Barton transmitters has not been shown to be adequate. (Ref. IE Information Notices 81-29, 82-52, and 83-72).

Res onse to Contention 9A:

ITT Barton transmitters, model numbers 763 and 764, are supplied to the Shearon Harris project by Westinghouse.

Carolina Power & Light Company (CP&L) has addressed IE Information Notices 81-29, 82-59, and 83-72 as follows:

Information Notice 81-29 dated September 24, 1981, Equipment Qualification Notice No. 2 Test Summary Report No. 1 indicated noisy output followed by erroneous output for two DP transmitters and noise followed by erroneous output for 40 minutes for one pressure transmitter (Model 763 and 764 ITT Barton). CP&L did not take any action at that time because the manufacturer was investigating the failures, concentrating on aging methodology, test set-up, and duplicating test conditions to establish what the failure mechanisms were. There were no corrective actions recommended at that time. Subsequently, as described in IE Notice 82-52, the causes of the problems were identified and corrected. The transmitters have been successfully retested.

2~ Information Notice 82-52 dated December 21,. 1982, Equipment Qualification Notice No. 2 Test Summary Report No. 2 indicated that the failure mechanisms had been determined to be bad connections in the connector assembly. Satisfactory resolution of the failures on Information Notice 81-29 also had been established. The transmitter was successfully retested by Westinghouse.

CP&L sent all Barton Models 763 and 764 safety-related transmitters back to ITT Barton on November 11, 1982 after receipt of a change notice from Westinghouse for rework (i.e., resoldering connector assemblies). They are still at the factory.

3~ Information Notice 83-72 dated October 28, 1983, Equipment Qualification Notice No. 20 Test Summary Report No. 1 indicated a negative shift in output during initial exposure to operating pressure for the Model 763 pressure transmitter.

The reported defect had a specific cause which was determined to be creep in the mechanical linkage and the material used to attach the link wire to the bourdon tube and strain-sensing beam.

Since the Model 763 Barton transmitters had already been sent to the factory for rework per Information Notices 81-29 and 82-52, CP&L indicated that the 763 transmitters should remain at ITT Barton until all corrective hardware modifications could be implemented at the same (401PSA/ccc)

I time. Westinghouse has maintained a close follow on the Barton transmitter testing and will inform CP&L when qualification testing and developments have been thoroughly evaluated. CP&L will perform an evaluation of the corrective actions to insure that this problem has been corrected, and the results of the evaluation will be documented in the EQ package.

Suppressed zero transmitters are used to measure pressurizer pressure.

The effect of this drift allowance on over-temperature delta T is minimal and can be absorbed. The effect on low trips and DNB calculations is conservative. Credit is taken for the high trip on loss of load only and this transient is not limiting for DNB or overpressure protection.

Therefore, Westinghouse has established that the observed excessive negative drift is not a safety concern.

4~ Information Notice 83-72 dated October 28, 1983, Equipment Qualification Notice No. 23 Test Summary Report No. 1 indicated that the Models 763 and 764 transmitters had thermal nonrepeatability which caused results in performance outside Barton's specification.

The defect was determined to be leakage current through the shafts of the zero and span potentiometers to the mounting bracket.

As stated before for the Model 763 transmitters, CP&L has indicated that the Model 764 transmitters which have already been sent to ITT Barton for rework per IN 81-29 and IN 82-52 should remain at the factory until all hardware modifications can be implemented at the same time. Westinghouse will maintain a close follow on the Barton transmitter testing and will keep CP&L informed of qualification testing and developments until they have been thoroughly evaluated. CP&L will perform an evaluation of the corrective actions to insure that this problem has been corrected and the results of the evaluation will be included in the EQ package.

CP&L believes that the above corrective actions are adequate to address the concerns expressed in Eddleman Contention 9A.

(401PSA/ccc)

9B. There is not sufficient assurance that the concerns with Limitorque valve operators identified in IE Information Notice 83-72 (except for Items C2, C5, and C7) have been adequately resolved.

Res onse to Contention 9B:

The Information Notice 83-72 (IN 83-72) addressed several concerns with the Limitorque valve operators at the Midland Plant. These concerns were related to:

1. Terminal blocks underrated, unqualified, unidentifiable (A, B, C9).
2. Motor insulation material ambient temperature rating (Cl).
3. Orientation of the operators (C3) ~
4. Drain plug installation (C4).
5. Installed equipment not in accordance with the purchase order and EQ program (C6).
6. 0-ring qualification uncertain (C8).

Limitorque Corporation has been contacted on several occasions and has provided several written responses to CP&L concerning the above deficiencies. Limitorque concluded that except for the nylon terminal blocks, the above deficiencies were related to lack of information at Midland and thus do not represent actual equipment qualification concerns applicable to Shearon Harris.

However, it is CP&L's practice to perform an independent assessment of the applicability of IE Notices and Bulletins to Shearon Harris. To that end, the following assessment is offered:

1. Terminal blocks will be field verified on a sample basis using vendor supplied information. The verifier will measure the dimensions of the power and nonpower lead terminal blocks, including the point-to-point distances of the terminal screws, using manufacturer catalog information provided by Limitorque. This field verification will ensure that the terminal blocks provided are the same type that were qualified. If any discrepancies are found, inspected.

~ remaining safety-related operators will be

2. Motor insulation material is presently being verified in the field as part of our equipment qualification effort. Verification consists of identification of motor insulation class from the motor nameplate data.

For valve operators inside containment insulation class should be RH. If any operators are found not to have RH insulation, Limitorque will be contacted for resolution. No discrepancies have been noted thus far in the verification process.

3. Orientation of the operators is specified on design drawings and is independently verified by the on-site Quality Assurance (QA) organization. (See our response to Eddleman 9E of this submittal.)

(401PSA/ccc)

4. Drain plugs are required by the vendor for inside-containment operators. Installation is inspected by site QA and verified on a sample basis by the site EQ group.
5. Safety-related equipment is manufactured under the vendor's facility QA program. Prior to shipment, CP&L, Westinghouse, or Ebasco inspect (both

'documentation and physical) the equipment and issue a "Quality Release". Upon arrival on site, CP&L QA personnel inspect the equipment prior to release to the field for installation. Thus, the installed equipment is assured to be in accordance with the purchase order and EQ program.

6. 0-rings are designed for the specific application and are qualified as an integral part of the operator assembly.

Limitorque EQ reports have been reviewed by Westinghouse, Ebasco, and CP&L and have been found to be qualified. Except for the above mentioned verifications; no further action is deemed necessary at this time.

(401PSA/ccc)

9C. It has not been demonstrated that the RTDs have been qualified in that the Arrhenius thermal aging methodology employed is not adequate to reflect the actual effects of exposures to temperatures of normal operation and accidents over the times the RTDs could be exposed to those temperatures. (Ref. NUREG/CR-1466, SAND-79-1561, Predicting Life Expectancy of Complex Equipment Using Accelerated Aging Techniques.)

Res onse to Contention 9C:

Depending on the application of a piece of equipment, the environment it is exposed to can vary. The Shearon Harris Environmental Qualification Program includes Aging, which reflects the intended application. The goal of the aging program is to simulate a certain age of the equipment (40 years) prior to testing under the severe environmental conditions representative of the postulated accident to which it must be qualified.

The aging program addresses the types of experiments discussed in Part II of NUREG/CR-1466 (SAND 79-1561) "Predicting Life Expectancy and Simulating Age of Complex Equipment Using Accelerated Aging Techniques",

1. Failure Mode Tests,
2. Capability Tests, and
3. Accelerated Aging Tests, as follows:
1. Failure Mode Tests The purpose is to indicate where a change in material, components, or design may lead to enhanced reliability. This is accomplished by exposing the equipment to environments that have higher than use stress levels. With respect to environmental qualification at Shearon Harris, the equipment is subjected to an aging temperature greater than the actual environment temperature it will be subjected to during its installation. All components making up the equipment see this higher temperature, which places the equipment in a high stress condition for a specific period of time usually expressed in many hours, or days.
2. Compatibility Tests The purpose is to show whether the aging of a specified material is affected by the aging of other materials in the group. As stated in the Failure Mode Tests, all components making up the equipment are aged simultaneously under high stress conditions thus accounting for this condition.
3. Accelerated Aging Tests This is the method employed to age the equipment. Specifically, aging is primarily based on the Arrhenius methodology which is acceptable to the NRC (See NUREG 0588, Section 4-4).

On the Shearon Harris RTDs, CP&L has reviewed the Westinghouse supplied test results and has done a detailed analysis of the results. This analysis included a review of the aging parameters used by Westinghouse with comparison to actual parameters values at Shearon Harris.

Additional information about aging methodology used for the Harris RTDs is presented in WCAP-8587, which has been approved by the NRC.

(401PSA/ccc)

As reported in WCAP 8687, Supplement 2 E-05A and E-06A, organic materials in the RTD assemblies are limited to epoxy potting at the cable/probe interface and silicon varnish on the cable lead. With the sealed armor protecting the RTD cable from the intrusion of moisture, the silicon varnish does not serve a critical function. Only the epoxy serves any physical function in providing some support for wires in the transition from cable to probe body.. Like the varnish, the potting is not a primary seal against moisture in the event of a Design Basis Event. The other materials are inorganic and are not age-sensitive.

The accelerated aging parameters were chosen for an ambient temperature of 50'C with an elevated temperature in the area of the epoxy potting of 50'C above ambient. The elevation of temperature above ambient is the result of heat transfer from the reactor coolant pipe or reactor coolant bypass manifold. Because no age-sensitive material is exposed to the full reactor coolant temperature, there is no reason to perform accelerated aging simulation using that temperature over the intended qualified life. The accelerated thermal aging is described in the respective EQ test reports which have been approved by the NRC.

(401PSA/ccc)

9D. The qualification of instrument cables did not include adequate consideration and analysis of leakage currents resulting from the radiation environment. These leakage currents could cause degradation of signal quality and/or spurious signals in Harris instrument cables.

Res onse to Contention 9D:

In addressing to the claim that the qualification of instrument cables did not include adequate monitoring of leakage currents during and after tests, it merits noting that IEEE 383-1974, which forms the basis for the cable qualification program at Shearon Harris, does not required monitoring this parameter.

A review of the methods used in testing cable for Shearon Harris will, however, show that even though leakage current is not a standard measured parameter, other tests that are performed are equal or even haxsher than leakage current measurements. One of these tests is the post thermal/radiation test which involves submergence of the aged cable and application of high voltages. After cables have been aged thermally and received an equivalent 40 year plus accident total integrated radiation dose, they are straightened and recoiled with an inside diameter if approximately 20 times the cable overall diameter and immersed in tap water at room temperature. While still immersed these specimens should pass a voltage withstand test at voltages several times higher than required during normal operation. If an insulation breakdown has occurred during the test, this would show up.

Additionally, in the case of instrument cable where leakage current is a concern, insulation resistance, which can be used to indicate the values of

, leakage current, is also frequently measured before, during, and after the environmental qualification. A comparison of pre-test to post-test values of

.insulation resistance is done during the test report reviews.

All of the above tests results are reviewed by CP&L and this review is part of the test report review packages.

(401PSA/ccc)

t 9E. There is not sufficient assurance that the physical orientation of equipment in testing is the same as the physical orientation of equipment installed.

Res onse to Contention 9E:

The environmental qualification reports describe and in some cases even provide photographs of the listed equipment orientation/set-up during their testing. The test set-up is reviewed in detail by the design organization with particular attention paid to any limiting conditions. The vendor may test in several orientations, test in the most limiting orientation, test in a single orientation and then analyze other orientations, or simply specify the exact tested orientation. This is also carefully reviewed by the design organization. The results of these reviews are then fed back into the installation drawings and form the basis for field installation. Any orientation questions, discrepancies, or inconsistencies are resolved with the vendor.

CP&L then assures that the equipment is installed per design drawings.

Contractor personnel use only controlled engineering documents to install equipment. A very large quality inspection organization as'sures installation per design through a comprehensive, independent field inspection program using these design documents. Installation problems identified by the field installation personnel are resolved by design engineering personnel during the installation process. Documentation is maintained as part of plant records justifying the changes, thus allowing for future audit and verification.

Problems that are identified during the inspection process are also evaluated by design engineering personnel. The non-conforming item is either reworked or justified by design engineering to be acceptable as-is.

Thus, it is shown that this multi-faceted program involving the vendor, design engineering, construction installation personnel, and quality inspection organization ensures that qualified equipment is installed in an orientation consistent with the test program. It should also be noted that in addition to the above, there are various walkdown programs being developed (post installation, post inspection) which will provide an additional overlay of assurance on the installation process.

(401PSA/ccc)

1 9F. The effects of radiation on lubricants and seals has not been adequately addressed in the environmental qualification program.

Res onse to Contention 9F:

The Shearon Harris harsh environment qualification program uses actual type tests to demonstrate qualification. This includes irradiation of equipment as a whole, including the seals, lubricants, etc., used in the equipment. As such, the effects of radiation on lubricants and seals are included in the qualification of the equipment using these elements. This is documented in the Equipment Qualification packages and is reviewed by CP&L and audited by NRC. In those cases where lubricants, seals, etc., are the limiting component, inspection and replacement requirements are specifically hi-lighted by the EQ program and transmitted to operations personnel for inclusion in the maintenance and surveillance program for the plant.

(401PSA/ccc)

E

'c

$

90. There is inadequate assurance that failure to report all results of environmental qualification tests, including failures, has been brought to light in connection with electrical equipment installed in Harris.

This includes past test failures of equipment which subsequently passes an EQ test and test failures of equipment which is said to be qualified by similarity. (Ref. Item 2, Page 5, L. D. Bustard et al., Annual Report: Equipment Qualification Inspection Program, Sandia National Laboratories, FY83.)

Res onse to Contention 9G:

Environmentally qualified Class 1E electrical components are purchased from vendors who have CP&L approved quality assurance programs. The Vendor Surveillance Unit verifies that the vendor QA program and implementation are acceptable before the vendors are awarded contracts. The acceptance of the vendor's QA program is based on a review of the vendor's QA program manual/procedures and the performance of an on-site facility QA audit. For the SHNPP project, manual reviews and facility audits are performed by CP&L Vendor Surveillance Unit, Ebasco and/or Westinghouse personnel. During a facility QA audit conducted by CP&L Vendor Surveillance Unit personnel, a prepared checklist is used which included questions concerning verification of design adequacy and design analysis.

After a contract has been awarded, CP&L Vendor Surveillance Specialists perform shop inspections at the vendor's facilities to verify that the requirements of the specification for Class 1E electrical components are being met. During these surveillance visits, the Vendor Surveillance Specialists verify that a report is available for components that require environmental qualification. The CP&L Vendor Surveillance Specialists verify that the report represents the equipment that is being purchased and that the report has been approved by authorized laboratory, vendor, and CP&L personnel.

Ebasco and Westinghouse surveillance 'representatives also perform shop inspections for contracts for which they are responsible. These surveillance representatives verify that electrical component qualification reports are available and that the reports have been approved by authorized laboratory, vendor and Ebasco/Westinghouse personnel.

As part of the equipment qualification program, a review is done of the results of any testing. If, during this review, anomalies, gaps in testing, sample description discrepancies or improper assumptions are noted, the vendor is contacted. In some instances, visits to the vendors shops by Equipment Qualification Engineers have been made to personally verify the information and inspect the tested equipment. Additionally, comparison qualification (i-e., qualification by comparison to a similar tested component) is given a careful review to assure proper logic and basis.

Item 2, p. 5 of the Sandia report which is referenced in the contention was addressed by the Staff in the "Discussion of Sandia Items" attached to the memorandum from William J. Dircks to the Commissioners, dated February 2, 1984. Item 2 is-discussed together with certain other items. There are several inspection reports listed with those items. A review of those reports shows that Item 2 is taken from Inspection Report No. 9990277/83-02, which documents the results of an inspection of The Rockbestos Company conducted on June 20-23 and August 16-17, 1983.

10 (401PSA/ccc)

The Inspection Report (p. 10, ll, and 14) questions the use of the company 's qualification test report f/2806 to qualify their entire 100 series line of cable, particularly in view of the fact that in the same test used to qualify RSS-6-104 type cables, four other type cables in the 100 series line failed the test.

The Rockbestos cable company uses their qualification test report //2806, which describes LOCA testing on R85-6-104 cable, to assert the qualification of their entire 100 series line. No mention is made of the RSS-6-100A, RSS-6-109, RSS-6-110, RSS-6-112 which were also a part of the qualification test used to generate QR2806 and failed.

Shearon Harris uses the RSB-6-104, RSS-6-105 and RSS-6-108 type cables. The RSS-6-104 was the model actually tested and did pass the test. RSS-6-105 and RSS-6-108 are used in the electrical containment penetrations only. A review of the spec sheets for these two models and discussions with Rockbestos have shown that the two cable types are very well represented, by comparison, to the RSS-6-104 alone. This comparison uses cable specifications such as installation material and thickness, and jacket material and thickness as comparison variables. As can-be seen by the attached equipment manufacturing catalog sheets, cable types RSS-6-104 and RSS-6-105 differ only in minor differences in the insulation material. Rockbestos has stated that the RSS-6-105 insulation is a higher quality insulation type than the RSS-6-104 which was successfully tested. The major differences between RSS-6-108 and the tested RSS-6-104 are that the 108 cable is a triaxial cable while the 104 cable is a coaxial cable, and the 108 cable contains the higher quality insulation similar to the 105 cable. Additionally, for the first jacket of the RSS-6-108 cable, it can be noted that the insulation/shielding/jacketing subsequently has a second thick is greater than the RSS-6-104. The RSS-6-108 shield and second jacket. Any comparisons done to establish qualifications are documented in the equipment qualification documentation packages.

Therefore, the 2806 report can be used to qualify all three types of Rockbestos cable at Shearon Harris.

Shearon Harris does not use any of the type cables which failed during the qualification program used to generate QR2806.

11 (401PSA/ccc)

~~ S C

~

M'\

~ O e ee ee w ~e ~ %~~&4 >@jan @LA AZ ~ ~

RSS-6-108/LE Date << 3/15/83 Tr faxfal Cable - Low Noise Adverse Servfce Revision - 0

.460 + .009 .400 .370 .315 .285 + enn7 .064 .n48 I

2nd Jacket 2nd Shield 1st Jacket 1st Shield 2nd Insulation 1st Insulation Conductor Descrfptfon Construction Details Conductor 18 AtG Tin Coated Copper (7x26) to ASTH 833 5 B286 1st Insulation Roclbestos Polvmer LE 2nd Insulatf on Radiatior. Cross-Linked, Low Noise Treated, Hodf fied Polyoleffn 1st Shield 33 Q4 Tin '.ed Copper to ASllf 833, 9N (mfnfnum) coverage 1st Jacket Radiation Cross-Linked Fla Retardan Non-Corrosive Modified Pol oleffn 2nd Shield 33 AV"= Tin Coated Copper to ASTH 833, 90K (minimum) Coverage 2nd Jacket Radiation Cross-Linked, Flame Retardant, Non-Corrosive Modified Polydleffn Flectrtca~tPre erttee Impedance 72 ohms (nomfnal)

Caoac f tance 21.7 nf/ft. (nominal) For Fnnfneerfnn Velocity 65". (nominal) oefnrence nnlv Dfelectr fc Constant 2.3 (nomfnal)

<<Corona Extinction 10n0 volts (rms} (minimum)

<<Insulatfon Sesfstance 106 megohms for 1000 ft. (mfnfnxim)

<<Dielectric llftlstand 5000 volts (rms) (mfnfnxnn) lqng volts (rms) (mfnfrmm) bellmen s~felds Physical Pro rties Me aht

'l; 140 lh/1000 ft. (nominal)

Ilfnimum Bend Fa Ee5 inches for oermanent installation Environmental Pronertfes Cold Bend -4"'C on a 4.75 inch mandrel Flamnabf1 f ty <<IorEA S-19-81, Sec. 6.19.6 (September 1977)

This cable fs suitable for C'lass 1K service fn nuclear generating stations and meets annlfcahle renufrements of lEEE 383-1974. Unless otherwfse specified, printed legend will include "Rockbestos RSS-6-108/LE. 19XX."

Dimensions are fn inches and are nor'.nal unless othen!fse desfqnated.

Required tests to be run fn accordance i ith "ockbestns Test procedures.

  • Production Tests T'IXK ~DCWK3Ke I OR <OWXFWi~~

NEW HAVEN, CONNECTICUT 06504 USA TELEPHONE: (203) 772-2250 TELEX: 710-465-2149

~'

RSS-6'-105/L f Date - 3/15/83 Cassia! ra!1 e - Loe !!atae Adverse Service Revisfon 0

.242 + .004 .173 .146 + .n04 .048 e032 Jacket Shield 2nd Insulation 1st Insulation Conductor Description Construction Details Conductor 22 "'". Tin Coated Copper (lgx34) to ASTi'33 A 8286 1st Insulation Rocgestos Polymer LE 2nd Insulation tladfatfon Cross-Linked, Low ~tofse Treated, tiodfffed Polyoleffn Shield 34 PiRG Tin Coated Conper to ASTli 833, 90".. (Nnfmum) Coverage Jacket P~diatfon Cross-Linked, Flame Retardant, Von-Corrosive 'hdflfed Polyoleffn Electrical Pro ertfes Impedance 62 ohns (nominal)

Capacitance ?5.7 pf/ft. nominal) For Fnqineerfnn Velocity 64 (nominal Reference denly Dielectric Constant 2.4 (nominal

  • Corona'Extinction 23PO volts (rms) (mini
  • Insulation Resistance 1C~ megohms for lfi00 ft. ( minimum)

<<Dielectric Mfthstand 500" volts (rms) (mfnfmsm Oar~a!col pro erases Me(I ght 36.6 lb/1000 ft. (nominal) ilfnfmum Bend Radius 3.0 inches for permanent installation Cold Bend -4n'C on a 2.5 fnch mandrel Flaiunabflfty <<IPCEP. 5-10-8'I, .ec. E.l 8.6 (Seotemher 1977)

This cable fs suitable ~or rla~s lr service in nuclear neneratfno stations and meets annlfcahie rec.ufrements" of 1EEE 383-1874. Unless otherwise specified, printed legend will include "Rockbestos RSS-6-105/Lfe lgXX Dimensions are fn inches and are nominal unless otherwise desfonated.

Reoufred Tests to be run ir a" or".ace rftii Rockbestos Test Procedures.

<<Production Tests T'&K AOCIZHKB1 OR C'OMX WN Y NEW HAVEN, CONNECTICUT06504 USA TELEPHONE: (203) 772-2250 TELEX: 710465-2149

~ ~ y ~ Page 13 0

t RSS-6-104 Date - 1/20/78 Coaxial .Ci-bl e Adverse Servi n n-

.242 + .004 .173 .146 + .004 .048 .032 Jacket Shield 2nd Insulation 1st insulation Conductor Descrintion Constr c Corductor 22 A'iG Tin Coated Co oer lgx34 to AS'33 5 8286 1st Insulation Rockbestos Polymer LD 2nd Insulation Radiation Cross-Linked modified Pol 1efin Shield 34 AMG Tin Coated Cooper to ASTH 833, 90. (!minimum) Coveraoe Jacket Radiation Cross-Linked. Flame Retardant. !Ion-Corrosive tiodified Polyolefin Impedance (nominal ) )

Capacitance 25.7 nf/ft. nominal) For Enqineer'inq Velocity 64" (nominal Peference denly Dielectric Constant 2.4 (nominal

~ Corona Extinction 23/0 volts (rms) {nominal)

<<Insulation Resistance

~ Dielectric Mithstand 10'eqohms for 1000 ft. (minimum) 5000 volts (rms) (minimum Meight 36.6 lb/1000 Ft. {nominal)

Minimum Bend Radius 3.0 inches for nermanent installation Environmental Pro erties Cold Bend -40'C on a 2.5 inch mandrel Flaamability ~ IPCEA 5-19-81, Dec. 6.19.6 (Septemher 1977)

This cable is suitable for Class lE service in nuclear generating stations and meets annlicable reouirements of 1EEE 383-1974. The cable wi11 operate at temperatures up to 250'C for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, 171'C for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and 150'C for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />. Continuous service uo to 110'C; Dimensions are in inches and are nominal unless othentise desionated.

Pequired tests to he run in accordance uith Rockbestos Test Procedures.

<<Production Tests 5 HE EC()VIi'V NEW HAVEN, CONNECTICUT 06504 USA TELEPHONE: (203) 772-2250 TELEX: 710-465-2149

'I 4 j

C 0 4 4