{{#Wiki_filter:April 30, 2018   Mr. Richard L. Anderson
{{#Wiki_filter:April 30, 2018
Site Vice President
Mr. Richard L. Anderson
Entergy Operations, Inc.
Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Arkansas Nuclear One
Russellville, AR 72802
1448 S.R. 333
  SUBJECT: ERRATA FOR ARKANSAS NUCLEAR ONE  
Russellville, AR 72802
- NRC INTEGRATED INSPECTION REPORT 05000
SUBJECT:         ERRATA FOR ARKANSAS NUCLEAR ONE - NRC INTEGRATED
313/2018001 AND 05000368/2018001 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07200013/2018001
                  INSPECTION REPORT 05000313/2018001 AND 05000368/2018001 AND
  Dear Mr. Anderson: It was identified that the inspection report sent to you dated April 25, 2018
                  INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION
(NRC's Agencywide Documents Access and Management System (ADAMS) Accession
                  REPORT 07200013/2018001
No. ML18115A417) improperly listed the Independent Spent Fuel Storage Installation Inspection Report number as "07200013/2018001" in the subject lines, enclosure bloc
Dear Mr. Anderson:
k , and page one of the enclosure of the original letter. The correct inspection report number should read "07200013/201
It was identified that the inspection report sent to you dated April 25, 2018 (NRCs Agencywide
7 001" in all areas. Please note none of the content of the inspection report has changed.
Documents Access and Management System (ADAMS) Accession No. ML18115A417)
  This letter, its enclosure, and your response (if any) will be made available for public inspection
improperly listed the Independent Spent Fuel Storage Installation Inspection Report number as
and copying at http://www.nrc.gov/reading
07200013/2018001 in the subject lines, enclosure block, and page one of the enclosure of the
-rm/adams.html
original letter. The correct inspection report number should read 07200013/2017001 in all
and at the NRC Public Document Room in accordance with 10
areas. Please note none of the content of the inspection report has changed.
CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection
Sincerely,     /RA/ Neil O'Keefe
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
, Chief Branch E Division of Reactor Projects
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
  Docket Nos. 50
Withholding.
-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:
                                                  Sincerely,
Inspection Report 05000313/2018001 and 05000368/2018001
                                                  /RA/
and 07200013/201
                                                  Neil OKeefe, Chief
7 001 w/ Attachment
                                                  Branch E
                                                  Division of Reactor Projects
April 30, 2018 Mr. Richard L. Anderson
Docket Nos. 50-313 and 50-368
Site Vice President
License Nos. DPR-51 and NPF-6
Entergy Operations, Inc.
Enclosure:
Arkansas Nuclear One
Inspection Report 05000313/2018001 and
1448 S.R. 333
05000368/2018001 and 07200013/2017001
Russellville, AR 72802
w/ Attachments
SUBJECT: ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT 05000313/2018001 AND 05000368/2018001 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07200013/201
 
7 001 D ear Mr. Anderson: O n March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One facility, Units 1 and 2. On April 5, 2018 , the NRC inspectors discussed the results of this inspection with Mr. John Kirkpatrick, General Manager of Plant Operations, and other members of your staff.
                                            April 30, 2018
On April 18, 2018, the NRC inspectors exited to modify the characterization of one finding
Mr. Richard L. Anderson
with Ms. Stephanie Pyle, Regulatory Assurance Manager. The results of this inspection are documented in the enclosed report.
Site Vice President
NRC inspectors document
Entergy Operations, Inc.
ed two findings of very low safety significance (Green) in this report. Both of these findings involved a violation
Arkansas Nuclear One
of NRC requirements.
1448 S.R. 333
  Additionally, NRC inspectors documented a licensee
Russellville, AR 72802
-identified violation, which was determined to be of very low safety significance (Green), in this report. The NRC is treating these violation s as non-cited violation
SUBJECT:       ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT
s (NCV s) consistent with Section
                05000313/2018001 AND 05000368/2018001 AND INDEPENDENT SPENT
2.3.2.a of the Enforcement Policy.
                FUEL STORAGE INSTALLATION INSPECTION REPORT 07200013/2017001
If you contest the violation
Dear Mr. Anderson:
s or significance of the NCV
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
s, you should provide a response within  
at your Arkansas Nuclear One facility, Units 1 and 2. On April 5, 2018, the NRC inspectors
30 days of the date of this inspection report, with the basis for your denial, to the U.S.
discussed the results of this inspection with Mr. John Kirkpatrick, General Manager of Plant
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC
Operations, and other members of your staff. On April 18, 2018, the NRC inspectors exited to
20555-0001; with copies to the Regional Administrator, Regio
modify the characterization of one finding with Ms. Stephanie Pyle, Regulatory Assurance
n IV; the Director, Office of Enforcement; and the NRC resident inspector at the Arkansas Nuclear One. If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30
Manager. The results of this inspection are documented in the enclosed report.
days of the date of this inspection report, with the basis for your disagreement, to the U.S.
NRC inspectors documented two findings of very low safety significance (Green) in this report.
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
Both of these findings involved a violation of NRC requirements. Additionally, NRC inspectors
-0001; with copies to the Regional Administrator, Region
documented a licensee-identified violation, which was determined to be of very low safety
IV; and the NRC resident inspector at the Arkansas Nuclear One.
significance (Green), in this report. The NRC is treating these violations as non-cited violations
R. Anderson
(NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
2 This letter, its enclosure, and your response (if any) will be made available for public inspection
If you contest the violations or significance of the NCVs, you should provide a response within
and copying at http://www.nrc.gov/reading
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
-rm/adams.html
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
and at the NRC Public Document Room in accordance with 10
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the
CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.
NRC resident inspector at the Arkansas Nuclear One.
Sincerely, /RA/   Neil O'Keefe
If you disagree with a cross-cutting aspect assignment or a finding not associated with a
, Chief Branch E Division of Reactor Projects
regulatory requirement in this report, you should provide a response within 30 days of the date
  Docket Nos. 50
of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory
-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:
Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the
Inspection Report 05000313/2018001 and 05000368/2018001
Regional Administrator, Region IV; and the NRC resident inspector at the Arkansas Nuclear
and 07200013/2017
One.
001 w/ Attachment
                                                                                        Enclosure
s:  1. Documents Reviewed
 
2. Occupational Radiation Safety Inspection
R. Anderson                                     2
Request for Information
This letter, its enclosure, and your response (if any) will be made available for public inspection
                           
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
  Enclosure U.S. NUCLEAR REGULATORY
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
COMMISSION
Withholding.
Inspection Report
                                                Sincerely,
  Docket Numbers: 05000313; 05000368; and 07200013
                                                /RA/
  License Numbers: DPR-51; NPF-6   Report Numbers: 05000313/2018001; 05000368/2018001; and 07200013/201
                                                Neil OKeefe, Chief
7 001  Enterprise Identifier:
                                                Branch E
I-2018-001-0005   Licensee: Entergy Operations, Inc.
                                                Division of Reactor Projects
  Facility: Arkansas Nuclear One, Units
Docket Nos. 50-313 and 50-368
1 and 2 , and Independent  
License Nos. DPR-51 and NPF-6
Spent Fuel Storage Installation
Enclosure:
  Location: Junction of Highway 64 West and Highway 333 South
Inspection Report 05000313/2018001 and
Russellville, Arkansas   Inspection Dates: January 1, 2018 to March 31, 2018   Inspectors:
05000368/2018001 and 07200013/2017001
C. Henderson, Senior Resident Inspector
w/ Attachments:
P. Smagacz, Acti
1. Documents Reviewed
ng Senior Resident Inspector
2. Occupational Radiation Safety Inspection
T. Sullivan, Resident Inspector
  Request for Information
M. Tobin, Resident Inspector
 
L. Brookhart, Senior Inspector
                          U.S. NUCLEAR REGULATORY COMMISSION
N. Greene, Ph.D., Senior Health Physicist
                                        Inspection Report
J. O'Donnell, CHP, Health
Docket Numbers:       05000313; 05000368; and 07200013
Physicist  Approved By:
License Numbers:       DPR-51; NPF-6
N. O'Keefe , Branch Chief
Report Numbers:       05000313/2018001; 05000368/2018001; and 07200013/2017001
   
Enterprise Identifier: I-2018-001-0005
  2  SUMMARY The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting an integrated inspection at Arkansas Nuclear One
Licensee:             Entergy Operations, Inc.
, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html
Facility:             Arkansas Nuclear One, Units 1 and 2, and Independent Spent Fuel
for more information.
                      Storage Installation
NRC-identified
Location:             Junction of Highway 64 West and Highway 333 South
and self-revealed findings and violations, and additional items are summarized in the table
                      Russellville, Arkansas
s below. A licensee-identified
Inspection Dates:     January 1, 2018 to March 31, 2018
, non-cited violation
Inspectors:           C. Henderson, Senior Resident Inspector
is documented in report  
                      P. Smagacz, Acting Senior Resident Inspector
S ection 71124.01. List of Findings and Violations
                      T. Sullivan, Resident Inspector
                      M. Tobin, Resident Inspector
                      L. Brookhart, Senior Inspector
                      N. Greene, Ph.D., Senior Health Physicist
                      J. ODonnell, CHP, Health Physicist
Approved By:           N. OKeefe, Branch Chief
                                                                            Enclosure
 
                                              SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in
accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs
program for overseeing the safe operation of commercial nuclear power reactors. Refer to
https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and
self-revealed findings and violations, and additional items are summarized in the tables below.
A licensee-identified, non-cited violation is documented in report Section 71124.01.
                                  List of Findings and Violations
  Failure to Establish Adequate Criteria for Flood Seal Testing
  Cornerstone          Significance                                Cross-cutting      Inspection
                                                                    Aspect              Procedure
  Mitigating            Green Finding                              [H.12] - Avoid      71111.01 -
  Systems              NCV 05000313/2018001-01 and                Complacency        External
                        05000368/2018001-01                                            Flooding
                        Closed
  The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical
  Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to
  establish the criteria for ensuring the necessary conditions existed for a successful test of
  hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches,
  Revision 1, did not contain adequate guidance to ensure that the auxiliary building was at a
  lower pressure than the turbine building such that puffing smoke on the turbine building side
  would allow a seal leak to be detectable.
  Failure to Preplan and Perform Service Water Pre-Screen Maintenance
  Cornerstone          Significance                                Cross-cutting      Inspection
                                                                    Aspect            Procedure
  Mitigating            Green Finding                              [H.12] - Avoid    71152 -
  Systems              NCV 05000368/2018001-02                    Complacency        Problem
                        Closed                                                        Identification
                                                                                      and
                                                                                      Resolution
  The inspectors reviewed a self-revealed, non-cited violation and associated finding of
  Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to
  properly preplan maintenance that can affect the performance of safety-related equipment.
  Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing
  the train B service water system to become inoperable.
                                    Additional Tracking Items
  Type      Issue number                Title                          Inspection      Status
                                                                        Procedure
  URI      7200013/2012001-02          Validation of the ANO data      60855.1        Closed
                                        collected during the thermal
                                        validation test and used in
                                        the Holtec analysis
                                                  2
 
Type Issue number        Title                          Inspection Status
                                                          Procedure
URI  7200013/2012001-03  Applicability of the ANO        60855.1    Closed
                          thermal validation test results
                          to other HI-STORM 100
                          overpack configurations
LER  05000313/2016-002-00 Tornado Missile Vulnerability  71153      Closed
                          Resulting in Condition
                          Prohibited By Technical
                          Specifications
                                3
 
PLANT STATUS
Unit 1 began the inspection period at full power. On March 24, 2018, the unit was shut down to
begin Refueling Outage 1R27.
Unit 2 began the inspection period at full power. On January 14, 2018, the unit reduced power
to 83 percent to perform planned condenser water box cleaning. The unit was returned to rated
thermal power on January 19, 2018.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed plant status activities described in
IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem
Identification and Resolution. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess licensee performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
    Seasonal Extreme Weather (1 Sample)
    The inspectors evaluated readiness for seasonal extreme weather conditions prior to the
    onset of seasonal cold temperatures.
        *  Unit 1 and Unit 2 diesel fuel oil vault on January 30, 2018
        *  Unit 2 emergency diesel generator 2 on January 30, 2018
        *  Alternate ac diesel generator on January 30, 2018
        *  Unit 1 and Unit 2 emergency cooling pond on January 30, 2018
    External Flooding (1 Sample)
    The inspectors evaluated readiness to cope with external flooding on March 16, 2018.
    A finding associated with this inspection is documented in the Inspection Results section
    below.
                                                    4
 
71111.04 - Equipment Alignment
  Partial Walkdown (4 Samples)
  The inspectors evaluated system configurations during partial walkdowns of the following
  systems/trains:
  (1) Unit 2 train A emergency feedwater system during planned maintenance of train B
        emergency feedwater system on February 7, 2018
  (2) Unit 2 swing service water pump B aligned to the emergency cooling pond during intake
        structure pre-screen cleaning and maintenance on February 22, 2018
  (3) Unit 2 emergency diesel generator 2 ventilation system on March 2, 2018
  (4) Unit 1 temporary reactor vessel level identification system on March 28, 2018
  Complete Walkdown (1 Sample)
  The inspectors evaluated system configurations during a complete walkdown of the Unit 2
  service water system on March 14, 2018.
71111.05 - Fire Protection Annual/Quarterly
  Quarterly Inspection (4 Samples)
  The inspectors evaluated fire protection program implementation in the following selected
  areas:
  (1) Unit 2 auxiliary building corridor 2109 temporary safety-related battery heating, Fire
        Area MM, Fire Zone 2103-V, on January 30, 2018
  (2) Unit 1 cable spreading room, Fire Area G, Fire Zone 97-R, on January 31, 2018
  (3) Unit 2 upper south piping penetration room, Fire Area EE-L , Fire Zone 2084-DD, on
        February 8, 2018
  (4) Unit 2 lower south piping penetration room, Fire Area EE-L, Fire Zone 2055-JJ, on
        February 8, 2018
  Annual Inspection (1 Sample)
  The inspectors evaluated fire brigade performance in the Unit 1 control room for a simulated
  fire emergency feedwater pump room and the Unit 2 turbine deck for a simulated fire in the
  turbine generator on January 4, 2018, and March 09, 2018.
                                            5
 
71111.06 - Flood Protection Measures
  Internal Flooding (1 Sample)
  The inspectors evaluated internal flooding mitigation protections in the Unit 2 emergency
  feedwater room floor drain system on March 16, 2018.
  Cables (1 Sample)
  The inspectors evaluated cable submergence protection in Manhole 8 on March 1, 2018.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
  Operator Requalification (2 Samples)
  (1) The inspectors observed and evaluated Unit 1 simulator training for operating crews on
        reactor shutdown and decay heat removal on February 22, 2018.
  (2) The inspectors observed and evaluated Unit 2 simulator training for operating crews on
        reactor coolant pump motor fire and security related events on February 22, 2018.
  Operator Performance (2 Samples)
  (1) The inspectors observed and evaluated Unit 2 return to near 100 percent power following
        condenser cleaning on January 18, 2018.
  (2) The inspectors observed and evaluated Unit 1 reactor shutdown for commencing Refuel
        Outage 1R27 on March 23, 2018.
71111.12 - Maintenance Effectiveness
  Routine Maintenance Effectiveness (3 Samples)
  The inspectors evaluated the effectiveness of routine maintenance activities associated
  with the following equipment and/or safety significant functions:
  (1) Unit 1 rod control system on January 31, 2018
  (2) Unit 2 service water system on March 6, 2018
  (3) Internal and external flood seals on March 16, 2018
  Quality Control (1 Sample)
  The inspectors evaluated maintenance and quality control activities associated with the
  following equipment performance issues:
  (1) Unit 2 control element assembly system on January 31, 2018
71111.13 - Maintenance Risk Assessments and Emergent Work Control (6 Samples)
  The inspectors evaluated the risk assessments for the following planned and emergent
  work activities:
  (1) Unit 2 planned work activities for control element assembly 5 repair on January 5, 2018
                                            6
 
  (2) Unit 2 emergent work activities for emergency diesel generator 2 on January 10, 2018
  (3) Unit 2 emergent work activities for service water pump A and C strainer cleaning
      following high differential pressure alarm during pre-screen cleaning on
      January 19, 2018
  (4) Unit 1 and Unit 2 planned work activities for startup transformer 1 and 3 outage for
      autotransformer insulator repair on February 2, 2018
  (5) Unit 2 planned work activities for service water bay pre-screen cleaning and
      maintenance on February 22, 2018
  (6) Unit 2 service water pre-screen cleaning on February 22, 2018
71111.15 - Operability Determinations and Functionality Assessments (6 Samples)
  The inspectors evaluated the following operability determinations and functionality
  assessments:
  (1) Unit 1 operability determination for auxiliary building tornado missile protection wall
      missing rebar on January 18, 2018
  (2) Unit 1 operability determination for emergency feedwater control valve, CV-2646, stroke
      time outside operability limits on January 22, 2018
  (3) Unit 2 operability determination for emergency diesel generator 2 relay failure and
      automatic start function for containment coolers on January 24, 2018
  (4) Unit 1 and Unit 2 operability determination for emergency cooling pond during cold
      weather impact of safety-related pumps operating oil temperature on January 31, 2018
  (5) Unit 1 and Unit 2 operability determination for 500 kV offsite circuit autotransformer
      damaged insulator on February 9, 2018
  (6) Unit 2 functional determination emergency feedwater system room floor drain system on
      March 16, 2018
71111.18 - Plant Modifications (2 Samples)
  The inspectors evaluated the following temporary or permanent modifications:
  (1) Unit 2 temporary modification for lifting leads for control element assembly 4 for
      degraded upper gripper coils on January 5, 2018
  (2) Unit 2 temporary battery room heating on January 30, 2018
71111.19 - Post Maintenance Testing (4 Samples)
  The inspectors evaluated the following post maintenance tests:
  (1) Unit 2 replacement of service water pump A and C strainers on January 20, 2018
                                              7
 
  (2) Unit 1 auxiliary building hatch HTC-492 smoke testing following resin transfer on
      February 14, 2018
  (3) Unit 2 motor driven emergency feedwater pump flow transmitter calibration due to the
      transmitter reading low out of range on February 20, 2018
  (4) Unit 1 temporary reactor vessel level indication due valve, RC-1, repair on
      March 28, 2018
71111.20 - Refueling and Other Outage Activities (Partial Sample)
  The inspectors evaluated Unit 1 Refueling Outage 1R27 activities from March 24, 2018, to
  March 31, 2018. The inspectors completed inspection procedure Sections 03.01.a and
  03.01.c.
71111.22 - Surveillance Testing
  The inspectors evaluated the following surveillance tests:
  Routine (3 Samples)
  (1) Unit 1 emergency feedwater solenoid operated control valve, CV-2646, establishment of
      stroke time reference value and acceptance criteria on January 25, 2018
  (2) Unit 1 and Unit 2 verified correct breaker alignment and indicated power availability for
      the 161 kV offsite circuited with the 500 kV offsite inoperable during autotransformer
      insulator repair on February 2, 2018
  (3) Unit 1 train A reactor protection system and rod control system ac breaker surveillance
      trip testing on February 27, 2018
  In-service (1 Sample)
  (1) Unit 2 service water motor operated valve, 2CV-1435-1, service water inlet to train A
      shutdown heat exchanger on March 15, 2018
  Reactor Coolant System Leak Detection (1 Sample)
  (1) Unit 1 small increase of unidentified leakage on March 2, 2018
RADIATION SAFETY
71124.01 - Radiological Hazard Assessment and Exposure Controls
  Radiological Hazard Assessment (1 Sample)
  The inspectors evaluated radiological hazards assessments and controls.
  Instructions to Workers (1 Sample)
  The inspectors evaluated worker instructions.
                                              8
 
  Contamination and Radioactive Material Control (1 Sample)
  The inspectors evaluated contamination and radioactive material controls.
  Radiological Hazards Control and Work Coverage (1 Sample)
  The inspectors evaluated radiological hazards control and work coverage.
  High Radiation Area and Very High Radiation Area Controls (1 Sample)
  The inspectors evaluated risk-significant high radiation area and very high radiation area
  controls.
  Radiation Worker Performance and Radiation Protection Technician Proficiency (1 Sample)
  The inspectors evaluated radiation worker performance and radiation protection technician
  proficiency.
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
  Implementation of ALARA and Radiological Work Controls (1 Sample)
  The inspectors reviewed ALARA practices and radiological work controls by reviewing the
  following activities and/or work packages:
  (1) 2017-1070, core bore National Fire Protection Association (NFPA) 805 project and
        support activities
  (2) 2018-1414, as low as reasonable achievable (ALARA) activities during 1R27
  (3) 2018-1420, scaffold installation/removal non-Locked High Radiation Areas - 1R27
  (4) 2018-1430, reactor disassembly, reassembly, and support activities
  (5) 2018-1900, emergent maintenance activities during 1R27
  Radiation Worker Performance (1 Sample)
  The inspectors evaluated radiation worker and radiation protection technician performance.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
  The inspectors verified licensee performance indicators submittals listed below:
  (8 Samples)
  (1)    IE01: Unplanned Scrams per 7000 Critical Hours Sample, Unit 1 and Unit 2,
          (January 1, 2017, through December 31, 2017)
  (2)    IE03: Unplanned Power Changes per 7000 Critical Hours Sample, Unit 1 and Unit 2,
          (January 1, 2017, through December 31, 2017)
                                            9
 
  (3)      IE04: Unplanned Scrams with Complications Sample, Unit 1 and Unit 2,
            (January 1, 2017, through December 31, 2017)
  (4)      OR01: Occupational Exposure Control Effectiveness Sample (April 1, 2017, through
            March 30, 2018)
  (5)      PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation
            Manual (RETS/ODCM) Radiological Effluent Occurrences Sample (April 1, 2017,
            through March 30, 2018)
71152 - Problem Identification and Resolution
  Annual Follow-up of Selected Issues (1 Sample)
  The inspectors reviewed the licensees implementation of its corrective action program
  related to the following issues:
  (1) Unit 2 train B service water inoperable due to strainer high differential pressure during
      pre-screen cleaning following winter shad run on March 27, 2018
  A finding associated with this inspection is documented in the Inspection Results section
  below.
71153 - Follow-up of Events and Notices of Enforcement Discretion
  Events (2 Samples)
  (1) The inspectors evaluated licensees response to Unit 2 entry into loss of service water
      abnormal operating procedure due to service water pump A and C strainer high
      differential pressure alarm during pre-screen cleaning on January 19, 2018.
  (2) The inspectors evaluated licensees response to Unit 1 and Unit 2 cyber security issues
      on the business network on February 6, 2018.
  Licensee Event Reports (LERs) (1 Sample)
  The inspectors evaluated the following licensee event reports which can be accessed at
  https://lersearch.inl.gov/LERSearchCriteria.aspx:
  (1) LER 05000313/2016-002-00, Tornado Missile Vulnerability Resulting in Condition
      Prohibited By Technical Specifications, on February 5, 2018
OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants
  The inspectors evaluated the licensees operation of the independent spent fuel storage
  installation (ISFSI) from October 30 to November 2, 2017, on-site at ANO, and conducted
  an in-office review of additional documentation related to licensees maintenance of their
  cask handling crane until January 2018.
                                            10
 
The ANO ISFSI consisted of four ISFSI pads. ANO had loaded 24 canisters of the Energy
Solutions ventilated storage cask (VSC) VSC-24 design (Certificate of Compliance
No. 1007) from 1996 to 2003. Since that time, ANO had been loading HI-STORM 100S
Version C overpacks. ANOs ISFSI contained a total of 57 HI-STORM overpacks with
32 MPC-24 canisters and 25 MPC-32 canisters, at the time of the routine inspection. ANO
was currently loading canisters to the Holtec Certificate of Compliance 1014, Amendment 5,
and Final Safety Analysis Report (FSAR), Revision 7.
The ISFSI activities specifically reviewed during the on-site inspection and the subsequent
in-office review included:
  (1) Evaluated and observed fuel selection and fuel loading operations.
  (2) Reviewed the licensee's loading, processing, and heavy load procedures associated
        with their current dry fuel storage campaign.
  (3) Reviewed licensees corrective action program implementation for ISFSI operations
        since the last routine ISFSI inspection which was completed in December 2015.
  (4) Reviewed quality assurance (QA) program implementation, including recent QA
        audits, surveillances, receipt inspection, and quality control activities.
  (5) Reviewed documentation related to technical specification (TS) required operational
        surveillance activities and Final Safety Analysis Report (FSAR) required annual
        maintenance activities.
  (6) Reviewed the licensees radiological monitoring data for the calendar years 2014,
        2015, and 2016.
  (7) Reviewed spent fuel documentation for the canisters loaded since the last routine
        ISFSI inspection (Holtec Canister 48-57) to confirm the fuel met all TS requirements
        for storage and transportation.
  (8) Reviewed annual maintenance activities for heavy lifting components which included
        special lifting devices and the sites cask handling crane (Auxiliary Building L-3
        crane).
  (9) Reviewed all 72.48 safety evaluations/screenings for changes made to the licensees
        ISFSI operations in accordance with Inspection Procedure 60857 since the last
        routine ISFSI inspection.
  (10) Reviewed all changes made to the licensees 72.212 Report (Revision 10) in
        accordance with Inspection Procedure 60856.1 since the last routine ISFSI
        inspection.
Additionally, inspectors closed two unresolved items (URIs) from a routine ISFSI inspection
conducted in 2012 (see Inspection Results).
                                            11
 
INSPECTION RESULTS
  Failure to Establish Adequate Criteria for Flood Seal Testing
  Failure to Establish Adequate Criteria for Flood Seal Testing
Cornerstone
Cornerstone            Significance                                Cross-cutting    Report
Significance
                                                                    Aspect            Section
Cross-cutting Aspect Inspection Procedure Mitigating Systems Green Finding NCV 05000313/2018001-01 and 05000368/2018001
Mitigating            Green                                      [H.1] -          71111.01 -
-01 Closed [H.1 2] - Avoid Complacency
Systems                NCV 05000313/2018001-01 and                Resources        External
71111.01 - External Flooding The inspectors identified a Green finding and associated non
                        05000368/2018001-01                                          Flooding
-cited violation of Unit
                        Closed
1 Technical Specification
The inspectors identified a Green finding and associated non-cited violation of Unit 1
5.4.1.a and Unit
Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees
2 Technical Specification
failure to establish the criteria for ensuring the necessary conditions existed for a successful
6.4.1.a for the licensee's failure to establish the criteria for ensuring the necessary conditions existed for a successful test of hatch flood seals.  Specifically, Procedure
test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight
OP 1402.240, "Inspection of
Hatches, Revision 01, did not contain adequate guidance to ensure that the auxiliary building
Watertight Hatches," Revision 1, did not contain adequate guidance to ensure that the auxiliary building was at a lower pressure than the turbine building such that puffing smoke on the turbine building
was at a lower pressure than the turbine building such that puffing smoke on the turbine
side would allow a seal leak to be detectable.
building side would allow a seal leak to be detectable.
  Failure to Preplan and Perform Service Water Pre
Description: As part of corrective actions to prevent recurrence for Yellow finding
-Screen Maintenance
05000313/2014009-01 and 05000368/2014009-01, the licensee improved the preventive
Cornerstone
maintenance for flood seals on hatches that prevented flood waters from external sources
Significance
from entering the auxiliary building, where safety-related accident mitigation equipment was
Cross-cutting Aspect Inspection Procedure Mitigating Systems Green Finding NCV 05000368/2018001
located. These actions included a new testing protocol which established a pressure
-02 Closed [H.12] - Avoid Complacency
differential across the seal, then puffed chemical smoke around the seal and observed for
71152 - Problem Identification
leaks. Known as a smoke test, this method requires that air pressure inside the auxiliary
and Resolution
building be lower than turbine building air pressure so that when smoke is puffed around the
The inspectors reviewed a self
outside of the seal, the smoke would be pulled into the lower pressure area on the other side,
-revealed, non-cited violation and associated finding of Arkansas Nuclear One
and leaks would be detectable.
, Unit 2 , Technical Specification
On November 29, 2017, as part of a Confirmatory Action Letter Inspection, NRC inspectors
6.4.1.a, for the licensee's failure to properly preplan maintenance that can affect the performance of safety
reviewed corrective actions and observed a smoke test of hatch 492. The inspector noted
-related equipment.  Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the train B service water system to become inoperable.
that test personnel had checked that the auxiliary building ventilation was in a normal
  Additional Tracking Item s Type Issue number
Title Inspection Procedure Status URI 7200013/20 12 00 1-0 2 Validation of the ANO data collected during the thermal validation test and used in the Holtec analysis
60855.1 Closed 
  3  Type Issue number
Title Inspection Procedure Status URI 7200013/2012001
-03 Applicability of the ANO thermal validation test results to other HI
-STORM 100 overpack configurations
60855.1 Closed LER 05000313/2016
-002-00 Tornado Missile Vulnerability Resulting in Condition Prohibited By Technical Specifications
71153 Closed 
  4  PLANT STATUS
Unit 1 began the inspection period at full power.  On March 24 , 2018, the unit was shut down to begin Refueling Outage 1R27.  Unit 2 began the inspection period at full power.  On January
14 , 2018, the unit reduced power to 83 percent to perform planned condenser water box cleaning.  The unit was returned to rated thermal power on January
19 , 2018.  INSPECTION SCOPE
S Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted.  Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
-rm/doc-collections/insp
-manual/inspection
-procedure/index.html.  Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter
(IMC) 2515, "Light
-Water Reactor Inspecti
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title Revision M-2204 Piping & Instrument Diagram, Emergency Feedwater, Sheet 4 72  Procedures
  Number           Title                                                       Revision/Date
Number Title Revision 2104.036 Emergency Diesel Generator Operations
                  Pre-Drill Brief - ASOTH-FP-FBDRLS                          9
94 2106.006 Emergency Feedwater System Operations
EC-52999          Justification for Additional Non-Q Battery Room Heating    00
97 2106.032 Unit Two Freeze Protection Guide
                                            A1-2
27 1402.240 Inspection of Watertight Hatches
 
2  Condition Reports (CR
-ANO-) C-2018-00050 1-2017-03673    71111.04 - Equipment Alignment
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title Revision CALC-91-E-0090-02 ANO-2 EDG Room Ventilation
  Number           Title                                                 Revision/Date
  2 CALC-91-R-2013-01 28 EC-24964 U-2 Emergency Diesel Generator Cycle 20 Heat Exchanger Thermal Performance Evaluation
ER-ANO-2002-     Justification for Temporary Non-Q Battery Room Heating January 30,
  EC-45962 2K-4A/B 2013 Emergency Diesel Heat Exchanger Thermal Performance Test
  0145-00                                                                2002
  EC-46332 U-2 Emergency Diesel Generator Thermal Performance Test Review 2011
FBDRL-2018-03    Fire Drill                                            March 9,
  EC-52442 2014 2K-4A/B Thermal Performance Evaluation
                                                                        2018
  EC-66265 U-2 SW Strainer D/P Spike Op Input
Procedures
  0 ER-ANO-2006-0248-000  GL-89-13 SW System Problems Affecting Safety-Related Equipment
Number          Title                                                  Revision
 
2106.032        Unit Two Freeze Protection Guide                      27
  A1-Miscellaneous Documents
71111.06 - Flood Protection Measures
Number Title Revision M-2204 Piping & Instrument Diagram, Emergency Feedwater, Sheet 4 72 M-2210 Piping & Instrument Diagram, Service Water, Sheet
  Drawings
1 - 4 83 STM-2-42 SW and ACW Systems
Number          Title                                                  Revision
38  Procedures
E-601            Electrical Plot Plan Outdoor Area, Sheet 1
Number Title Revision 1403.191 Motor Testing Using "MCE/EMAX"
1402.240        Inspection of Watertight Hatches                      2
11, 12 2104.029 Service Water System Operations
Work Orders
109 2104.036 Emergency Diesel Generator Operations
52747174
94 2104.044 Ventilation System Operations
71111.11 - Licensed Operator Requalification Program and Licensed Operator
44 2106.006 Emergency Feedwater System Operations
Performance
97  Condition Reports (CR
Procedures
-ANO-) 1-2013-03239 1-2016-05663 1-2016-05675 1-2016-05676 1-2017-00186 1-2018-00132 2-2012-00762 2-2015-02748 2-2015-02879 2-2015-05329 2-2016-00035 2-2016-00550 2-2016-02987 2-2016-03206 2-2016-03918 2-2016-04462 2-2017-05291 2-2017-05919 2-2018-00157 2-2018-00165 2-2018-00168 C-2013-03165 C-2016-05226 C-2016-05445 C-2017-04059 C-2017-04069 C-2017-04775 C-2018-00277 C-2018-00441    Work Orders
Number          Title                                                  Revision
  52537116 52728726 497922-01    71111.05 - Fire Protection
OP-2202.001      Standard Post Trip Actions                            16
OP-2202.002      Reactor Trip Recovery                                  11
OP-2203.009      Fire Protection System Annunciator Corrective Actions  32
OP-2203.025      RCP Emergencies                                        18
OP-2203.034      Fire or Explosion                                      21
71111.12 - Maintenance Effectiveness
Drawings
  Number          Title
234C7880F        Induction Motor
                                        A1-3
 
Miscellaneous Documents
Number           Title                                               Revision
117              Engineering Evaluation, SW Pumps                    6
2015              U-2 SW System Health Report Q1, Q2, Q3, Q4
2016              U-2 SW System Health Report Q1, Q2, Q4
2017              U-2 SW System Health Report Q2
EC-28463          SW System                                            0
N 1000.006-P      E-Doc, SW System Ops                                53
TDG080 1710      Triclad Vertical Induction Motors                    3
Procedures
Number           Title                                               Revision
1304.125          Unit 1 RPS-A/CRD Breaker Trip Test                  26
1309.013          Flow Rate Data
2104.029         SW System Ops                                        109
2203.022          Loss of SW Tech Guidelines                          14
2311.002          Flow Rate Data
2411.102          U-2 Slide Gate and SW Bay Cleaning/Inspection
EN-DC-204        Maintenance Rule Scope and Basis                    4
EN-DC-205        Maintenance Rule Monitoring                          6
EN-FAP-OM-012 Prompt Investigation and Notifications, Attn. 7.4        9
EN-LI-118        ANO Response to Cold Weather Shad Runs              25
1402.240          Inspection of Watertight Hatches                    2
Condition Reports (CR-ANO-)
1-2017-00965            2-2014-02814            2-2015-00083  2-2015-00129
2-2015-00268            2-2016-01808            2-2016-02351  2-2016-02611
2-2017-01162            2-2017-05280            2-2017-05281  2-2017-05329
2-2017-05759            2-2018-00044            2-2018-00045  2-2018-00157
2-2018-00300            2-2018-00445            2-2018-00797  C-2017-00287
C-2018-00299            C-2018-01623            1-2017-03673
                                          A1-4
 
Work Orders
  189034            435369            453805          468095          486027
489032            51803722          52652306        52711156        52713201
52715932          52728009          52766896        52784316
71111.13 - Maintenance Risk Assessments and Emergent Work Control
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title Revision/Date
  Number           Title                                                 Revision
  Pre-Drill Brief
  COPD-024          Risk Assessment Actions                                64
- ASOTH-FP-FBDRLS 9 EC-52999 Justification for Additional Non
-Q Battery Room Heating
00 
  A1-3  Miscellaneous Documents
Number Title Revision/Date
ER-ANO-2002-0145-00 Justification for Temporary Non
-Q Battery Room Heating
January 30, 2002 FBDRL-2018-03 Fire Drill
March 9, 2018  Procedures
Number Title Revision 2106.032 Unit Two Freeze Protection Guide
27  71111.06 - Flood Protection Measures
Drawings Number Title Revision E-601 Electrical Plot Plan Outdoor Area, Sheet
1  1402.240 Inspection of Watertight Hatches
2 Work Orders 52747174      71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
  Procedures
  Procedures
  Number Title Revision OP-2202.001 Standard Post Trip Actions
  Number           Title                                                 Revision
  16 OP-2202.002 Reactor Trip Recovery
1107.001         Electrical System Operations                          115
  11 OP-2203.009 Fire Protection System Annunciator Corrective Actions
  2104.029          Service Water System Operations                        109
  32 OP-2203.025 RCP Emergencies
  2203.003          CEA Malfunction                                        24
  18 OP-2203.034 Fire or Explosion
  EN-FAP-OM-021 Critical Decision Procedure                                5
  21  71111.12 - Maintenance Effectiveness
  EN-OP-119        Protected Equipment Postings                          9
Drawings Number Title  234C7880F Induction Motor
  EN-WM-104        On Line Risk Assessment                                16
   
  Condition Reports (CR-ANO-)
  A1-4  Miscellaneous Documents
C-2018-00474            C-2018-00475
  Number Title Revision 117 Engineering Evaluation, SW Pumps
  Work Orders
6 2015 U-2 SW System Health Report Q1, Q2, Q3, Q4
  490410
  2016 U-2 SW System Health Report Q1, Q2, Q4
71111.15 - Operability Determinations and Functionality Assessments
  2017 U-2 SW System Health Report Q2
  Drawings
  EC-28463 SW System 0 N 1000.006
  Number            Title
-P E-Doc, SW System Ops
  A2001S01          ANO 500/161KV SW STA Station One-Line In-Service
  53 TDG080 1710
                  Diagram
  Triclad Vertical Induction Motors
  E-2100            Schematic Diagram Diesel Generator 2K4A ACB 152-308
3  Procedures
  E-2276            Schematic Diagram Service Water Pump 2P4B
Number Title Revision 1304.125 Unit 1 RPS
  E-2361            Schematic Diagram Containment Cooling 2VSF1A
-A/CRD Breaker Trip Test
  E-2361            Schematic Diagram Containment Cooling 2VSF1B
  26 1309.013 Flow Rate Data
                                        A1-5
  2104.029 SW System Ops
 
  109 2203.022 Loss of SW Tech Guidelines
  14 2311.002 Flow Rate Data
  2411.102 U-2 Slide Gate
and SW Bay Cleaning/Inspection
  EN-DC-204 Maintenance Rule Scope and Basis
  4 EN-DC-205 Maintenance Rule Monitoring
  6 EN-FAP-OM-012 Prompt Investigation and Notifications, Attn.
  7.4 9 EN-LI-118  ANO Response to Cold Weather Shad Runs 25 1402.240 Inspection of Watertight Hatches
  2  Condition Reports (CR
-ANO-) 1-2017-00965 2-2014-02814 2-2015-00083 2-2015-00129 2-2015-00268 2-2016-01808 2-2016-02351 2-2016-02611 2-2017-01162 2-2017-05280 2-2017-05281 2-2017-05329 2-2017-05759 2-2018-00044 2-2018-00045 2-2018-00157 2-2018-00300 2-2018-00445 2-2018-00797 C-2017-00287 C-2018-00299 C-2018-01623 1-2017-03673   
  A1-5 Work Orders
189034 435369 453805 468095 486027 489032 51803722 52652306 52711156 52713201 52715932 52728009 52766896 52784316  71111.13 - Maintenance Risk Assessments and Emergent Work Control
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title Revision COPD-024 Risk Assessment Actions
  Number           Title                                                       Date
64  Procedures
  00-R-2011-01     Calculation
Number Title Revision 1107.001 Electrical System Operations
OPS-152A         SU1 Outage Checklist - Unit 1 - 72-Hour TC                 August 29,
115 2104.029 Service Water System Operations
                                                                              2013
109 2203.003 CEA Malfunction
OPS-152B         SU3 Outage Checklist - Unit 2 - 72-Hour TC                 August 29,
24 EN-FAP-OM-021 Critical Decision Procedure
                                                                              2013
5 EN-OP-119 Protected Equipment Postings
  Procedures
9 EN-WM-104 On Line Risk Assessment
  Number           Title                                                       Revision
16  Condition Reports (CR
1106.006         Emergency Feedwater Pump Operation                         100, 101, 102
-ANO-) C-2018-00474 C-2018-00475    Work Orders
Condition Reports (CR-ANO-)
490410      71111.15 - Operability Determinations and Functionality Assessments
1-2000-00068           1-2017-01820             1-2018-00086         2-2000-00074
  Drawings Number Title  A2001S01 ANO 500/161KV SW STA Station One
2-2018-00055           2-2018-00065             2-2018-00088         C-2018-00389
-Line In-Service Diagram  E-2100 Schematic Diagram Diesel Generator 2K4A ACB 152
C-2018-00474           C-2018-00475
-308  E-2276 Schematic Diagram Service Water Pump 2P4B
Work Orders
  E-2361 Schematic Diagram Containment Cooling 2VSF1A
  490410-16
  E-2361 Schematic Diagram Containment Cooling 2VSF1B
71111.18 - Plant Modifications
 
  A1-6  Miscellaneous Documents
Number Title Date 00-R-2011-01 Calculation
  OPS-152A SU1 Outage Checklist  
- Unit 1 - 72-Hour TC August 29, 2013 OPS-152B SU3 Outage Checklist  
- Unit 2 - 72-Hour TC August 29, 2013  Procedures
  Number Title Revision 1106.006 Emergency Feedwater Pump Operation
100, 101, 102
  Condition Reports (CR
-ANO-) 1-2000-00068 1-2017-01820 1-2018-00086 2-2000-00074 2-2018-00055 2-2018-00065 2-2018-00088 C-2018-00389 C-2018-00474 C-2018-00475   Work Orders
  490410-16     71111.18 - Plant Modifications
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title Revision/Date
  Number           Title                                                       Revision/Date
  CALC-86E-0020-01 1E Station Battery 2D11 Duty Cycle and Sizing Calculation
  CALC-86E-0020- 1E Station Battery 2D11 Duty Cycle and Sizing Calculation     18
  18 EC-52999 Justification for Additional Non
01
-Q Battery Room Heating
  EC-52999         Justification for Additional Non-Q Battery Room Heating     00
  00 ER-ANO-2002-0145-00 Justification for Temporary Non
  ER-ANO-2002-     Justification for Temporary Non-Q Battery Room Heating     January 30,
-Q Battery Room Heating
0145-00                                                                      2002
January 30, 2002 STM 2-32-5 125 VDC Electrical Distribution
STM 2-32-5       125 VDC Electrical Distribution                             25
25 Procedures
Number Title Revision 2106.032 Unit Two Freeze Protection Guide
27 
  A1-7  Condition Reports (CR
-ANO-) 2-2003-00041 2-2014-00345    Work Orders
490646      71111.19 - Post-Maintenance Testing
  Procedures
  Procedures
  Number Title Revision 2304.237 Post Maintenance Verification
  Number           Title                                                       Revision
16 Condition Reports (CR
2106.032          Unit Two Freeze Protection Guide                            27
-ANO-) 1-2018-01107 2-2018-00356   Work Orders
                                            A1-6
  494916     71111.22 - Surveillance Testing
 
Condition Reports (CR-ANO-)
2-2003-00041            2-2014-00345
Work Orders
490646
71111.19 - Post-Maintenance Testing
Procedures
Number            Title                                      Revision
2304.237         Post Maintenance Verification             16
  Condition Reports (CR-ANO-)
1-2018-01107           2-2018-00356
Work Orders
  494916
71111.22 - Surveillance Testing
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title Revision/Date CALC-95-R-0014-02-01   MWO50235000
  Number           Title                                     Revision/Date
  MWO 50235239  MWO 50235641  OPS-152A SU1 Outage Checklist  
CALC-95-R-
- Unit 1 - 72-Hour TC August 29, 2013 OPS-152B SU3 Outage Checklist  
0014-02-01
- Unit 2 - 72-Hour TC August 29, 2013 SEP-ANO-1-IST-1 ANO-1 Inservice Testing Basis Document
MWO50235000
  3 Procedures
MWO50235239
  Number Title Revision 1104.209 SW Pump Performance Curves
MWO50235641
 
OPS-152A         SU1 Outage Checklist - Unit 1 - 72-Hour TC August 29,
  A1-8 Procedures
                                                              2013
  Number Title Revision 1106.006 Emergency Feedwater Pump Operation
OPS-152B         SU3 Outage Checklist - Unit 2 - 72-Hour TC August 29,
100, 101, 102
                                                              2013
  1107.001A Unit 1 XFMR Outage Checklist
SEP-ANO-1-       ANO-1 Inservice Testing Basis Document     3
  115 1304.125 Unit 1 RPS
  IST-1
-A/CRD Breaker Trip Test
  Procedures
  26 2104.029 SW Pump Performance Curves
  Number           Title                                     Revision
  Condition Reports (CR
1104.209         SW Pump Performance Curves
-ANO-) 1-2009-01820 1-2017-00965 1-2018-00086 1-2018-00631 2-2017-05885 C-2018-00474   Work Orders
                                        A1-7
  52747144     71124.01 - Radiological Hazard Assessment and Exposure Controls
 
  Procedures
  Number           Title                                                   Revision
1106.006         Emergency Feedwater Pump Operation                     100, 101, 102
  1107.001A         Unit 1 XFMR Outage Checklist                           115
  1304.125         Unit 1 RPS-A/CRD Breaker Trip Test                     26
  2104.029         SW Pump Performance Curves
Condition Reports (CR-ANO-)
1-2009-01820           1-2017-00965         1-2018-00086         1-2018-00631
2-2017-05885           C-2018-00474
Work Orders
  52747144
71124.01 - Radiological Hazard Assessment and Exposure Controls
  Air Sample Surveys
  Air Sample Surveys
  Number Title Date AS-ANO-2018-04648 RAB 10 - P36 A Makeup Pump Tear Down
  Number           Title                                                   Date
March 2, 2018 AS-ANO-2018-04660 RAB 11 - AMS-4 Alarm March 7, 2018 AS-ANO-2018-04665 RAB 121 - Replace 2RE  
AS-ANO-2018-     RAB 10 - P36 A Makeup Pump Tear Down                   March 2,
- 8221-2 Blower Pump UNPR
04648                                                                    2018
March 9, 2018  Audits and Self
AS-ANO-2018-     RAB 11 - AMS-4 Alarm                                   March 7,
-Assessments
04660                                                                    2018
  Number Title Date LO-ALO-2017-00025 Self-Assessment: Radiation Safety  
AS-ANO-2018-     RAB 121 - Replace 2RE - 8221-2 Blower Pump UNPR         March 9,
- Hazard Assessment and Airborne Controls
04665                                                                    2018
  March 22, 2017 QA-14/15-2017-ANO-01 Combined Radiation Protection and Radwaste
  Audits and Self-Assessments
  November 6, 2017  Miscellaneous Documents
  Number           Title                                                   Date
  Number Title Date NSTS Annual Inventory Reconciliation Report
LO-ALO-2017-     Self-Assessment: Radiation Safety - Hazard Assessment   March 22,
January 11, 2018 ANO Alpha Hazard Evaluation
00025            and Airborne Controls                                   2017
May 3, 2017
  QA-14/15-2017-                                                           November 6,
 
                  Combined Radiation Protection and Radwaste
  A1-Miscellaneous Documents
  ANO-01                                                                    2017
Number Title Date ANO-2017-0067 Spent Fuel Pool Inventory  
  Miscellaneous Documents
- Non-Fuel Items
  Number           Title                                                   Date
August 22, 2017 ANO-2017-0093 2017 Radiation Energy Distribution Evaluation
                  NSTS Annual Inventory Reconciliation Report             January 11,
December 7, 2017 52742701 Annual Inventory of Non
                                                                          2018
-Installed Radioactive Sources
                  ANO Alpha Hazard Evaluation                             May 3, 2017
February 20, 2018 52745968 Semi Annual Leak Test of Sealed Sources
                                        A1-8
February 15, 2018 Procedures
 
Number Title Revision EN-RP-100 Radiation Worker Expectations
Miscellaneous Documents
12 EN-RP-101 Access Control for Radiologically Controlled Areas
Number           Title                                                 Date
14 EN-RP-102 Radiological Control
ANO-2017-0067     Spent Fuel Pool Inventory - Non-Fuel Items           August 22,
5 EN-RP-104 Personnel Contamination Events
                                                                        2017
10 EN-RP-105 Radiological Work Permits
ANO-2017-0093     2017 Radiation Energy Distribution Evaluation         December 7,
18 EN-RP-106 Radiological Survey Documentation
                                                                        2017
7 EN-RP-108 Radiation Protection Posting
52742701         Annual Inventory of Non-Installed Radioactive Sources February 20,
20 EN-RP-109 Hot Spot Program
                                                                        2018
5 EN-RP-121 Radioactive Material Control
52745968         Semi Annual Leak Test of Sealed Sources               February 15,
14 EN-RP-123 Radiological Controls for Highly Radioactive Objects
                                                                        2018
  1 EN-RP-143 Source Control
Procedures
13 EN-RP-152 Conduct of Radiation Protection
Number           Title                                                 Revision
Radiation Surveys
EN-RP-100         Radiation Worker Expectations                         12
Number Title Date 1609-0457 U1 AUX 335' EL  
EN-RP-101         Access Control for Radiologically Controlled Areas   14
- F3A/F3B Filter Rooms September 19, 2016 1703-0336 U1 AUX Bldg  
EN-RP-102         Radiological Control                                 5
- T-15 Tank Room
EN-RP-104         Personnel Contamination Events                       10
March 14, 2017 1801-0490 U1 AUX 335' EL F2 Seal Injection Filter Room
EN-RP-105         Radiological Work Permits                             18
January 31, 2018 1802-0204 Semi Annual Source Leak Test
EN-RP-106         Radiological Survey Documentation                     7
February 14, 2018
EN-RP-108         Radiation Protection Posting                         20
  A1-10  Radiation Work Permits
EN-RP-109         Hot Spot Program                                     5
  Number Title Revision 20181401 Radiation Protection Activities During 1R27
EN-RP-121         Radioactive Material Control                         14
  00 20181407 Decontamination Activities During !R27 (Bulk Work)
EN-RP-123         Radiological Controls for Highly Radioactive Objects  1
  00 20181412 1R27 Locked High Radiation Area Activities (Bulk Work)
EN-RP-143         Source Control                                       13
  01 20181425 RCP Motor Maintenance During 1R27
EN-RP-152         Conduct of Radiation Protection                       3
  00 20181430 Reactor Disassembly/Re
Radiation Surveys
-Assembly, and Support Activities
Number           Title                                                 Date
  00 20181432 De-Fuel & Re-Fuel the Reactor
1609-0457         U1 AUX 335 EL - F3A/F3B Filter Rooms                 September
  00 20182053 Spent Fuel Activities  
                                                                        19, 2016
- Unit 2 00  Condition Reports (CR
1703-0336         U1 AUX Bldg - T-15 Tank Room                         March 14,
-ANO-) 1-2018-00585 1-2018-00997 1-2018-01273 2-2017-01634 2-2017-04273 2-2017-04634 2-2017-05337 2-2017-06115 C-2017-00890 C-2017-00946 C-2017-01105 C-2017-03822 C-2017-03929 C-2018-01264   Fleet Condition Reports (CR
                                                                        2017
-HQN-) 2017-00179 2017-00848 2017-00974   71124.02 - Occupational ALARA Planning and Controls
1801-0490         U1 AUX 335 EL F2 Seal Injection Filter Room         January 31,
  ALARA Planning, In-Progress Reviews, and Post
                                                                        2018
-Job Reviews
1802-0204         Semi Annual Source Leak Test                         February 14,
  Number Title Date 20171070 Core Bore NFPA 805 Project and Support Activities
                                                                        2018
March 6, 2018 20181070 Core Bore NFPA 805 Project and Support Activities
                                        A1-9
March 5, 2018 20181430 Reactor Disassembly, Reassembly, and Support Activities
 
June 17, 2017  Audits and Self
Radiation Work Permits
-Assessments
  Number           Title                                                     Revision
  Number Title Date LO-ALO-2017-00023 Self-Assessment: Radiation Safety  
20181401         Radiation Protection Activities During 1R27               00
- ALARA & Dose Assessment
  20181407         Decontamination Activities During !R27 (Bulk Work)         00
  September 11, 2017 QA-14/15-2017-ANO-01 Quality Assurance Audit: Combined Radiation Protection and Radwaste
  20181412         1R27 Locked High Radiation Area Activities (Bulk Work)     01
November 6, 2017
  20181425         RCP Motor Maintenance During 1R27                         00
  A1-11  Miscellaneous Documents
  20181430         Reactor Disassembly/Re-Assembly, and Support Activities   00
Number Title Date Letdown Heat Exchanger (E
  20181432         De-Fuel & Re-Fuel the Reactor                             00
-29A/B) Flush Plan
  20182053         Spent Fuel Activities - Unit 2                             00
March 28, 2018 TSR 18-1-063 Letdown Heat Exchangers, E
  Condition Reports (CR-ANO-)
-29A and E-29B December 7, 2017 TSR 18-1-064 RBD-11A & RBD-12A / Makeup System
1-2018-00585           1-2018-00997             1-2018-01273         2-2017-01634
December 7, 2017 TSR 18-1-123 Letdown Cooler E
2-2017-04273           2-2017-04634             2-2017-05337         2-2017-06115
-29A&B Inlet/Outlet Isolation
C-2017-00890           C-2017-00946             C-2017-01105         C-2017-03822
December 7, 2017 Procedures
C-2017-03929           C-2018-01264
Number Title Revision EN-RP-105 Radiological Work Permits
Fleet Condition Reports (CR-HQN-)
18 EN-RP-110 ALARA Program
2017-00179             2017-00848               2017-00974
14 EN-RP-110-03 Collective Radiation Exposure Guidelines
71124.02 - Occupational ALARA Planning and Controls
4 EN-RP-110-04 Radiation Protection Risk Assessment Process
  ALARA Planning, In-Progress Reviews, and Post-Job Reviews
7 EN-RP-110-06 Outage Dose Estimating and Tracking
  Number           Title                                                     Date
Radiation Work Permits
20171070         Core Bore NFPA 805 Project and Support Activities         March 6,
Number Title Revision 20171070 Core Bore NFPA 805 Project and Support Activities
                                                                              2018
03 20181070 Core Bore NFPA 805 Project and Support Activities
20181070         Core Bore NFPA 805 Project and Support Activities         March 5,
03 20181401 Radiation Protection Activities During 1R27
                                                                              2018
00 20181414 ALARA Activities During 1R27
20181430         Reactor Disassembly, Reassembly, and Support Activities   June 17,
00 20181420 Scaffold Installation / Removal Non
                                                                              2017
-LHRAs - 1R27 00 20181430 Reactor Disassembly, Reassembly, and Support Activities
  Audits and Self-Assessments
  00 20181900 Emergent Maintenance Activities During 1R27
  Number           Title                                                     Date
00  Condition Reports (CR
LO-ALO-2017-     Self-Assessment: Radiation Safety - ALARA & Dose           September
-ANO-) 1-2018-00336 1-2018-00508 1-2018-00849 2-2017-05526 C-2017-04230 C-2017-04551 C-2017-04692 C-2018-00851  
  00023            Assessment                                                11, 2017
  A1-12 Fleet Condition Reports (CR
QA-14/15-2017-   Quality Assurance Audit: Combined Radiation Protection     November 6,
-HQN-) 2017-01791     71151 - Performance Indicator Verification
ANO-01            and Radwaste                                              2017
                                          A1-10
 
Miscellaneous Documents
Number           Title                                                   Date
                  Letdown Heat Exchanger (E-29A/B) Flush Plan             March 28,
                                                                          2018
TSR 18-1-063     Letdown Heat Exchangers, E-29A and E-29B                 December 7,
                                                                          2017
TSR 18-1-064     RBD-11A & RBD-12A / Makeup System                       December 7,
                                                                          2017
TSR 18-1-123     Letdown Cooler E-29A&B Inlet/Outlet Isolation           December 7,
                                                                          2017
Procedures
Number           Title                                                   Revision
EN-RP-105         Radiological Work Permits                               18
EN-RP-110         ALARA Program                                           14
EN-RP-110-03     Collective Radiation Exposure Guidelines                 4
EN-RP-110-04     Radiation Protection Risk Assessment Process             7
EN-RP-110-06     Outage Dose Estimating and Tracking                     1
Radiation Work Permits
Number           Title                                                   Revision
20171070         Core Bore NFPA 805 Project and Support Activities       03
20181070         Core Bore NFPA 805 Project and Support Activities       03
20181401         Radiation Protection Activities During 1R27             00
20181414         ALARA Activities During 1R27                             00
20181420         Scaffold Installation / Removal Non-LHRAs - 1R27         00
20181430         Reactor Disassembly, Reassembly, and Support Activities  00
20181900         Emergent Maintenance Activities During 1R27             00
Condition Reports (CR-ANO-)
1-2018-00336           1-2018-00508             1-2018-00849       2-2017-05526
C-2017-04230           C-2017-04551             C-2017-04692       C-2018-00851
                                          A1-11
 
  Fleet Condition Reports (CR-HQN-)
2017-01791
71151 - Performance Indicator Verification
  Procedures
  Procedures
  Number Title Revision EN-LI-114 Regulatory Performance Indicator Process
  Number           Title                                                       Revision
7, 8 71152 - Problem Identification and Resolution
EN-LI-114         Regulatory Performance Indicator Process                   7, 8
71152 - Problem Identification and Resolution
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title Revision EC-66265 U-2 SW Strainer D/P Spike Op Input
  Number           Title                                                       Revision
  0 ER-ANO-2006-0248-000   GL-89-13 SW System Problems Affecting Safety
EC-66265         U-2 SW Strainer D/P Spike Op Input                         0
-Related Equipment
  ER-ANO-2006-
  Condition Reports (CR
0248-000
-ANO-) 1-2013-03239 1-2016-05663 1-2016-05675 1-2016-05676 1-2017-00186 1-2018-00132 2-2012-00762 2-2015-02748 2-2015-02879 2-2015-05329 2-2016-00035 2-2016-00550 2-2016-02987 2-2016-03206 2-2016-03918 2-2016-04462 2-2017-05291 2-2017-05919 2-2018-00157 2-2018-00165 2-2018-00168 C-2013-03165 C-2016-05226 C-2016-05445 C-2017-04059 C-2017-04069 C-2017-04775 C-2018-00277 C-2018-00441 C-2018-0299   71153 - Follow-up of Events and Notices of Enforcement Discretion
GL-89-13         SW System Problems Affecting Safety-Related Equipment
Condition Reports (CR-ANO-)
1-2013-03239           1-2016-05663           1-2016-05675           1-2016-05676
1-2017-00186           1-2018-00132           2-2012-00762           2-2015-02748
2-2015-02879           2-2015-05329           2-2016-00035           2-2016-00550
2-2016-02987           2-2016-03206           2-2016-03918           2-2016-04462
2-2017-05291           2-2017-05919           2-2018-00157           2-2018-00165
2-2018-00168           C-2013-03165           C-2016-05226           C-2016-05445
C-2017-04059           C-2017-04069           C-2017-04775           C-2018-00277
C-2018-00441           C-2018-0299
71153 - Follow-up of Events and Notices of Enforcement Discretion
  Miscellaneous Documents
  Miscellaneous Documents
  Number Title  CALC-16-E-0017-01 Tornado Missile Shield for Door 77, Room 144
  Number           Title
  EC 67019 Door 77, room 144 Tornado Generated Missile Barrier
  CALC-16-E-       Tornado Missile Shield for Door 77, Room 144
  ECN 73255 Resolution of Rebar Interferences for DR
0017-01
-77 Missile Barrier
EC 67019         Door 77, room 144 Tornado Generated Missile Barrier
 
ECN 73255         Resolution of Rebar Interferences for DR-77 Missile Barrier
  A1-13  Miscellaneous Documents
                                        A1-12
Number Title LER 05000313/2016
 
-002-00 Tornado Missile Vulnerability Resulting in Condition Prohibited By Technical Specifications
Miscellaneous Documents
  Condition Reports (CR
Number           Title
-ANO-) 1-2016-01788     Other Activities
LER               Tornado Missile Vulnerability Resulting in Condition
Design Basis Documents
05000313/2016-    Prohibited By Technical Specifications
Number Title Revision/Date 72.212 72.212 Report for ANO ISFSI  
002-00
10 Area-TLD Report
Condition Reports (CR-ANO-)
Review of 2014 Area Monitoring Results (1
1-2016-01788
st/2 nd half) February 2015 Area-TLD Report
Other Activities
Review of 2015 Area Monitoring Results (1
Design Basis Documents
st/2 nd half) February 2016 Area-TLD Report
Number           Title                                               Revision/Date
Review of 2016 Area Monitoring Results (1
72.212           72.212 Report for ANO ISFSI                         10
st/2 nd half) February 2017 CoC 1014 CoC and Technical Specifications for HI
Area-TLD Report Review of 2014 Area Monitoring Results (1st/2nd half) February
-STORM 100  
                                                                      2015
Amendment 5
Area-TLD Report Review of 2015 Area Monitoring Results (1st/2nd half) February
ISFSI FSAR  
                                                                      2016
HI-STORM 100 ISFSI Final Safety Analysis Report
Area-TLD Report Review of 2016 Area Monitoring Results (1st/2nd half) February
7 LTR-PAR-17-081 Evaluation of XSAM Periodic Test ANO, Two Block
                                                                      2017
November 20 , 2017 WTHQN-2015-277 Surveillance Activity Report  
CoC 1014         CoC and Technical Specifications for HI-STORM 100   Amendment 5
April 15, 2015 WTHQN-2015-605 Surveillance Activity Report  
ISFSI FSAR       HI-STORM 100 ISFSI Final Safety Analysis Report     7
April 15 , 2015 WTHQN-2016-774 Surveillance Activity Report  
LTR-PAR-17-081 Evaluation of XSAM Periodic Test ANO, Two Block         November 20,
December 9 , 2016 Miscellaneous Documents
                                                                      2017
Number Title Date ANO-1708-0273 Survey of Dry Fuel Pad  
WTHQN-2015-       Surveillance Activity Report                         April 15, 2015
August 16, 2017 ANO-1708-0279 Survey of CTF Dry Fuel Storage Pad
277
August 16 , 2017
WTHQN-2015-       Surveillance Activity Report                         April 15, 2015
  A1-14  Miscellaneous Documents
605
Number Title Date WTHQN-2016-775 Surveillance Activity Report  
WTHQN-2016-       Surveillance Activity Report                         December 9,
December 9 , 2016 WTHQN-2016-776 Surveillance Activity Report  
774                                                                    2016
February 16, 2016 WTHQN-2016-777 Surveillance Activity Report  
Miscellaneous Documents
December 15 , 2016 WTHQN-2017-111 Surveillance Activity Report  
Number           Title                                               Date
January 25 , 2017 WTHQN-2017-372 Surveillance Activity Report  
ANO-1708-0273     Survey of Dry Fuel Pad                               August 16,
April 27, 2017 WTHQN-2017-453 Surveillance Activity Report  
                                                                      2017
June 9 , 2017 Procedures
ANO-1708-0279     Survey of CTF Dry Fuel Storage Pad                   August 16,
Number Title Revision 1015.003B Unit Two Operations Logs
                                                                      2017
80 EDR-1 Generic Licensing Topical Report for L
                                        A1-13
-3 Crane 3 EN-DC-215 Fuel Selection for Holtec Dry Cask Storage for Canisters 48 through 57
 
6 EN-LI-100 Process Applicability Determination
Miscellaneous Documents
20 EN-LI-101 10 CFR 50.59 Evaluations
Number           Title                                                       Date
15 EN-LI-112 10 CFR 72.48 Evaluations
WTHQN-2016-     Surveillance Activity Report                               December 9,
12 EN-LI-115 HI-STORM 100 ISFSI Licensing Document Preparation
775                                                                          2016
and Control 7 EN-RP-210 Area Monitoring Program  
WTHQN-2016-     Surveillance Activity Report                               February 16,
1 OP-3403.004 HI-STORM 100 System Equipment Preparation
776                                                                          2016
18 OP-3403.005 HI-STORM 100 System Loading Operations
WTHQN-2016-     Surveillance Activity Report                               December
40 OP-3403.008 HI-TRAC and MPC Preparations for Fuel Loading
777                                                                          15, 2016
1 OP-3403.009 MPC Receipt Inspections
WTHQN-2017-     Surveillance Activity Report                               January 25,
1 OP-3403.010 HI-STORM Overpack Receipt Inspections
111                                                                          2017
1 OP-3406.005 Hi-STORM and HI
WTHQN-2017-     Surveillance Activity Report                               April 27, 2017
-TRAC Transport Operations
372
14 OP-3406.006 Forced Helium Dehydration System Operations  
WTHQN-2017-     Surveillance Activity Report                               June 9, 2017
9 OP-3406.007 Supplemental Cooling System Operations
453
8  
Procedures
  A1-15  72.48 Evaluations
Number           Title                                                       Revision
Number Title Date DFS-15-001 72.48 Evaluation, Foreign Material
1015.003B       Unit Two Operations Logs                                   80
December 22 , 2015 DFS-16-001 72.48 Evaluation, Application of Concrete Sealant
EDR-1           Generic Licensing Topical Report for L-3 Crane             3
January 21 , 2016 Condition Reports (CR
EN-DC-215       Fuel Selection for Holtec Dry Cask Storage for Canisters 48 6
-ANO-) 1-2017-3441 1-2017-3445 1-2017-3447 1-2017-3448 1.2017-3449 1.2017-3450 1-2017-3451 1-2017-3538 1-2017-3540 1-2017-3541 1-2017-3555 1-2016-0403 2-2015-2420 2-2016-0359 2-2016-2071 C-2015-0849 C-2015-0918 C-2015-0969 C-2015-1185 C-2015-2297 C-2015-2765 C-2015-3387 C-2015-4664 C-2015-4693 C-2015-4905 C-2015-4971 C-2016-0038 C-2016-0834 C-2016-0848 C-2016-1344 C-2016-2844 C-2016-3647 C-2016-4458 C-2017-2506 C-2017-2850   Engineering Changes
                through 57
EC-15295 EC-37094 EC-42379 EC-45077 EC-48646 EC-48806 EC-52044 EC-52619 EC-54103 EC-59072 EC-63881 EC-73641     Work Orders
EN-LI-100       Process Applicability Determination                         20
00065585 00408695 00419603 00439666 00479654 00488244 00489244 52393253 52576506 52629825 52629826 52638961 52663017 52667631 52687172 52687173 52701892 52707684 52719037  
EN-LI-101       10 CFR 50.59 Evaluations                                   15
  Attachment 2
EN-LI-112       10 CFR 72.48 Evaluations                                   12
The following items are requested for the
EN-LI-115       HI-STORM 100 ISFSI Licensing Document Preparation and 7
Occupational Radiation Safety Inspection
                Control
Arkansas Nuclear One
EN-RP-210       Area Monitoring Program                                     1
March 26 thru 30, 2018
OP-3403.004     HI-STORM 100 System Equipment Preparation                   18
Integrated Report 2018001
OP-3403.005     HI-STORM 100 System Loading Operations                     40
  Inspection areas are listed in the attachments below.  
OP-3403.008     HI-TRAC and MPC Preparations for Fuel Loading               1
  Please provide the requested information on or before March 9, 2018
OP-3403.009     MPC Receipt Inspections                                     1
Please submit this information using the same lettering system as below. For example, all contacts and phone numbers for Inspection Procedure 71124.0
OP-3403.010     HI-STORM Overpack Receipt Inspections                       1
1 should be in a file/folder titled  
OP-3406.005     Hi-STORM and HI-TRAC Transport Operations                   14
"1- A," applicable organization charts in file/folder "
OP-3406.006     Forced Helium Dehydration System Operations                 9
1- B," etc. If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at least 30 days later than the on
OP-3406.007     Supplemental Cooling System Operations                     8
-site inspection dates, so the inspectors will have access to the information while writing the report.
                                        A1-14
  In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting. The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
 
  If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
72.48 Evaluations
  If you have any questions or comments, please contact Natasha Greene at (817) 200
Number           Title                                                   Date
-1154 or natasha.greene@nrc.gov.
DFS-15-001       72.48 Evaluation, Foreign Material                       December
      PAPERWORK REDUCTION ACT STATEMENT
                                                                          22, 2015
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
DFS-16-001       72.48 Evaluation, Application of Concrete Sealant       January 21,
-0011.
                                                                          2016
  A2-2 1. Radiological Hazard Assessment and Exposure Controls (71124.01) and Performance Indicator Verification (71151)
Condition Reports (CR-ANO-)
  Date of Last Inspection:
1-2017-3441             1-2017-3445             1-2017-3447         1-2017-3448
April 10, 2017
1.2017-3449             1.2017-3450             1-2017-3451         1-2017-3538
  A. List of contacts and telephone numbers for the Radiation Protection Organization Staff and Technicians
1-2017-3540             1-2017-3541             1-2017-3555         1-2016-0403
B. Applicable organization charts
2-2015-2420             2-2016-0359             2-2016-2071         C-2015-0849
C. Audits, self
C-2015-0918             C-2015-0969             C-2015-1185         C-2015-2297
-assessments, and LERs written since date of last inspection
C-2015-2765             C-2015-3387             C-2015-4664         C-2015-4693
, related to this inspection area
C-2015-4905             C-2015-4971             C-2016-0038         C-2016-0834
D. Procedure indexes for the radiation protection procedures
C-2016-0848             C-2016-1344             C-2016-2844         C-2016-3647
E. Please provide
C-2016-4458             C-2017-2506             C-2017-2850
specific procedures related to the following areas noted below. Additional Specific Procedures may be requested by number after the inspector reviews the procedure indexes.  
Engineering Changes
1. Radiation Protection Program Description
EC-15295           EC-37094         EC-42379           EC-45077       EC-48646
2. Radiation Protection Conduct of Operati
EC-48806           EC-52044         EC-52619           EC-54103       EC-59072
ons 3. Personnel Dosimetry Program
EC-63881           EC-73641
4. Posting of Radiological Areas
Work Orders
5. High Radiation Area Controls
00065585           00408695         00419603           00439666       00479654
6. RCA Access Controls and Radiation Worker Instructions
00488244           00489244         52393253           52576506       52629825
7. Conduct of Radiological Surveys
52629826           52638961         52663017           52667631       52687172
8. Radioactive Source Inventory and Control
52687173           52701892         52707684           52719037
9. Declared Pregnant Worker Program
                                      A1-15
F. List of corrective action documents (including corporate and sub
 
-tiered systems) since date of last inspection
                            The following items are requested for the
a. Initiated by the radiation protection organization  
                            Occupational Radiation Safety Inspection
b. Assigned to the radiation protection organization  
                                      Arkansas Nuclear One
NOTE: The lists should indicate the significance level
                                      March 26 thru 30, 2018
of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
                                    Integrated Report 2018001
If not covered above, a summary of corrective action documents since date of last inspection
Inspection areas are listed in the attachments below.
involving unmonitored releases, unplanned releases, or releases in which any dose limit or administrative dose limit was exceeded (for Public Radiation Safety Performance Indicator verification in accordance with IP 71151)
Please provide the requested information on or before March 9, 2018.
G. List of radiologically significant work activities scheduled to be conducted during the inspection period (If the inspection is scheduled during an outage, please also include a list of work activities greater than 1 rem, scheduled during the outage with the dose estimate for the work activity.)
Please submit this information using the same lettering system as below. For example, all
H. List of active radiation work permits
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
   
1- A, applicable organization charts in file/folder 1- B, etc.
  A2-I. Radioactive source inventory list
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
a. All radioactive sources that are required to be leak tested
least 30 days later than the on-site inspection dates, so the inspectors will have access to the
b. All radioactive sources that meet the 10 CFR Part 20, Appendix E, Category 2 and above threshold. Please indicate the radioisotope, initial and current activity (w/assay date), and storage location for each applicable source.
information while writing the report.
J. The last two leak test results for the radioactive sources inventoried and required to be leak tested.
In addition to the corrective action document lists provided for each inspection procedure listed
  If applicable, specifically provide a list of all radioactive source(s) that have failed its leak test within the last two years
below, please provide updated lists of corrective action documents at the entrance meeting.
  K. A current listing of any non
The dates for these lists should range from the end dates of the original lists to the day of the
-fuel items stored within your pools, and if available, their appropriate dose rates (Contact / @ 30cm)
entrance meeting.
L. Computer printout of radiological controlled area entries greater than 100 millirem since the previous inspection to the current inspection entrance date. The printout should include the date of entry, some form of worker identification, the radiation
If more than one inspection procedure is to be conducted and the information requests appear
work permit used by the worker, dose accrued by the worker, and the electronic dosimeter dose alarm set-point used during the entry (for Occupational Radiation Safety Performance Indicator verification in accordance with IP 71151).
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
   
file the information can be found.
  A2-2. Occupational ALARA Planning and Controls (71124.02)  
If you have any questions or comments, please contact Natasha Greene at (817) 200-1154 or
  Date of Last Inspection:
natasha.greene@nrc.gov.
November 6, 2017
                        PAPERWORK REDUCTION ACT STATEMENT
  A. List of contacts and telephone numbers for ALARA program personnel
  This letter does not contain new or amended information collection requirements subject
B. Applicable organization charts
    to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
C. Copies of audits, self
      collection requirements were approved by the Office of Management and Budget,
-assessments, and LERs, written since date of last inspection
                                  control number 3150-0011.
, focusing on ALARA
                                                                              Attachment 2
D. Procedure index for ALARA Program
 
E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures may be requested by number
1. Radiological Hazard Assessment and Exposure Controls (71124.01) and
after the inspector reviews the procedure indexes. 1. ALARA Program
  Performance Indicator Verification (71151)
2. ALARA Committee
  Date of Last Inspection:         April 10, 2017
3. Radiation Work Permit Preparation
A. List of contacts and telephone numbers for the Radiation Protection Organization Staff
F. A summary list of corrective action documents (including corporate and sub
  and Technicians
-tiered systems) written since date of last inspection, related to the ALARA program. In addition to ALARA, the summary should also address Radiation Work Permit violations, Electronic Dosimeter Alarms, and RWP Dose Estimates
B. Applicable organization charts
NOTE: The lists should indicate the significance level
C. Audits, self-assessments, and LERs written since date of last inspection, related to this
of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
  inspection area
G. List of work activities greater than 1 rem, since date of last inspection, Include original dose estimate and actual dose.
D. Procedure indexes for the radiation protection procedures
H. Site dose totals and 3
E. Please provide specific procedures related to the following areas noted below.
-year rolling averages for the past 3 years (based on dose of record) I. Outline of source term reduction strategy
  Additional Specific Procedures may be requested by number after the inspector reviews
J. If available, provide a copy of the ALARA outage report for the most recently completed outages for each unit
  the procedure indexes.
K. Please provide your most recent Annual ALARA Report.
  1. Radiation Protection Program Description
   
  2. Radiation Protection Conduct of Operations
  3. Personnel Dosimetry Program
  4. Posting of Radiological Areas
  5. High Radiation Area Controls
  6. RCA Access Controls and Radiation Worker Instructions
  7. Conduct of Radiological Surveys
  8. Radioactive Source Inventory and Control
  9. Declared Pregnant Worker Program
F. List of corrective action documents (including corporate and sub-tiered systems) since
  date of last inspection
  a. Initiated by the radiation protection organization
  b. Assigned to the radiation protection organization
  NOTE: The lists should indicate the significance level of each issue and the search
            criteria used. Please provide in document formats which are searchable so that
            the inspector can perform word searches.
  If not covered above, a summary of corrective action documents since date of last
  inspection involving unmonitored releases, unplanned releases, or releases in which any
  dose limit or administrative dose limit was exceeded (for Public Radiation Safety
  Performance Indicator verification in accordance with IP 71151)
G. List of radiologically significant work activities scheduled to be conducted during the
  inspection period (If the inspection is scheduled during an outage, please also include a
  list of work activities greater than 1 rem, scheduled during the outage with the dose
  estimate for the work activity.)
H. List of active radiation work permits
                                            A2-2
 
I. Radioactive source inventory list
  a.       All radioactive sources that are required to be leak tested
  b.       All radioactive sources that meet the 10 CFR Part 20, Appendix E, Category 2
            and above threshold. Please indicate the radioisotope, initial and current activity
            (w/assay date), and storage location for each applicable source.
J. The last two leak test results for the radioactive sources inventoried and required to be
  leak tested. If applicable, specifically provide a list of all radioactive source(s) that have
  failed its leak test within the last two years
K. A current listing of any non-fuel items stored within your pools, and if available, their
  appropriate dose rates (Contact / @ 30cm)
L. Computer printout of radiological controlled area entries greater than 100 millirem since
  the previous inspection to the current inspection entrance date. The printout should
  include the date of entry, some form of worker identification, the radiation work permit
  used by the worker, dose accrued by the worker, and the electronic dosimeter dose
  alarm set-point used during the entry (for Occupational Radiation Safety Performance
  Indicator verification in accordance with IP 71151).
                                              A2-3
 
2. Occupational ALARA Planning and Controls (71124.02)
  Date of Last Inspection:         November 6, 2017
A. List of contacts and telephone numbers for ALARA program personnel
B. Applicable organization charts
C. Copies of audits, self-assessments, and LERs, written since date of last inspection,
  focusing on ALARA
D. Procedure index for ALARA Program
E. Please provide specific procedures related to the following areas noted below.
  Additional Specific Procedures may be requested by number after the inspector reviews
  the procedure indexes.
  1. ALARA Program
  2. ALARA Committee
  3. Radiation Work Permit Preparation
F. A summary list of corrective action documents (including corporate and sub-tiered
  systems) written since date of last inspection, related to the ALARA program. In addition
  to ALARA, the summary should also address Radiation Work Permit violations,
  Electronic Dosimeter Alarms, and RWP Dose Estimates
  NOTE: The lists should indicate the significance level of each issue and the search
            criteria used. Please provide in document formats which are searchable so that
            the inspector can perform word searches.
G. List of work activities greater than 1 rem, since date of last inspection,
  Include original dose estimate and actual dose.
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
  record)
I. Outline of source term reduction strategy
J. If available, provide a copy of the ALARA outage report for the most recently completed
  outages for each unit
K. Please provide your most recent Annual ALARA Report.
                                            A2-4


  ML18120A214
  SUNSI Review
By:  NFO/rdr  Non-Sensitive  Sensitive  Publicly Available
  Non-Publicly Available
Keyword: NRC-002 OFFICE SPE:DRP/E C:DRP/E    NAME JDixon NO'Keefe    SIGNATURE /RA/ /RA/    DATE 4/30/18 4/30/18     


ML18120A214
  SUNSI Review              Non-Sensitive              Publicly Available    Keyword:
By: NFO/rdr                  Sensitive                  Non-Publicly Available NRC-002
OFFICE        SPE:DRP/E        C:DRP/E
NAME            JDixon      NOKeefe
SIGNATURE        /RA/          /RA/
DATE            4/30/18        4/30/18
                                       


  ML18120A037
ML18120A037
   SUNSI Review
   SUNSI Review               Non-Sensitive              Publicly Available    Keyword:
  By: NFO/rdr Non-Sensitive Sensitive  Publicly Available
  By: NFO/rdr                 Sensitive                 Non-Publicly Available NRC-002
  Non-Publicly Available
OFFICE       SPE:DRP/E       BC:DRP/E       BC:DRP/E
Keyword: NRC-002 OFFICE SPE:DRP/E BC:DRP/E BC:DRP/E   NAME JDixon LBrookhart
NAME             JDixon       LBrookhart     NOKeefe
  NO'Keefe    SIGNATURE /RA/ /RA-E/ /RA/   DATE 4/30/18 4/27/18 4/30/18
  SIGNATURE         /RA/         /RA-E/         /RA/
DATE             4/30/18       4/27/18         4/30/18
}}
}}

Latest revision as of 07:21, 21 October 2019

Errata Arkansas Nuclear One - NRC Integrated Inspection Report 05000313/2018001 and 05000368/2018001 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2018001
ML18120A037
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/30/2018
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-E
To: Richard Anderson
Entergy Operations
O'Keefe C
References
ML18115A417 IR 2017001, IR 2018001
Download: ML18120A037 (44)


See also: IR 05000313/2018001

Text

April 30, 2018

Mr. Richard L. Anderson

Site Vice President

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S.R. 333

Russellville, AR 72802

SUBJECT: ERRATA FOR ARKANSAS NUCLEAR ONE - NRC INTEGRATED

INSPECTION REPORT 05000313/2018001 AND 05000368/2018001 AND

INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION

REPORT 07200013/2018001

Dear Mr. Anderson:

It was identified that the inspection report sent to you dated April 25, 2018 (NRCs Agencywide

Documents Access and Management System (ADAMS) Accession No. ML18115A417)

improperly listed the Independent Spent Fuel Storage Installation Inspection Report number as

07200013/2018001 in the subject lines, enclosure block, and page one of the enclosure of the

original letter. The correct inspection report number should read 07200013/2017001 in all

areas. Please note none of the content of the inspection report has changed.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Neil OKeefe, Chief

Branch E

Division of Reactor Projects

Docket Nos. 50-313 and 50-368

License Nos. DPR-51 and NPF-6

Enclosure:

Inspection Report 05000313/2018001 and

05000368/2018001 and 07200013/2017001

w/ Attachments

April 30, 2018

Mr. Richard L. Anderson

Site Vice President

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S.R. 333

Russellville, AR 72802

SUBJECT: ARKANSAS NUCLEAR ONE - NRC INTEGRATED INSPECTION REPORT

05000313/2018001 AND 05000368/2018001 AND INDEPENDENT SPENT

FUEL STORAGE INSTALLATION INSPECTION REPORT 07200013/2017001

Dear Mr. Anderson:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your Arkansas Nuclear One facility, Units 1 and 2. On April 5, 2018, the NRC inspectors

discussed the results of this inspection with Mr. John Kirkpatrick, General Manager of Plant

Operations, and other members of your staff. On April 18, 2018, the NRC inspectors exited to

modify the characterization of one finding with Ms. Stephanie Pyle, Regulatory Assurance

Manager. The results of this inspection are documented in the enclosed report.

NRC inspectors documented two findings of very low safety significance (Green) in this report.

Both of these findings involved a violation of NRC requirements. Additionally, NRC inspectors

documented a licensee-identified violation, which was determined to be of very low safety

significance (Green), in this report. The NRC is treating these violations as non-cited violations

(NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of the NCVs, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the

NRC resident inspector at the Arkansas Nuclear One.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a

regulatory requirement in this report, you should provide a response within 30 days of the date

of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the

Regional Administrator, Region IV; and the NRC resident inspector at the Arkansas Nuclear

One.

Enclosure

R. Anderson 2

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Neil OKeefe, Chief

Branch E

Division of Reactor Projects

Docket Nos. 50-313 and 50-368

License Nos. DPR-51 and NPF-6

Enclosure:

Inspection Report 05000313/2018001 and

05000368/2018001 and 07200013/2017001

w/ Attachments:

1. Documents Reviewed

2. Occupational Radiation Safety Inspection

Request for Information

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers: 05000313; 05000368; and 07200013

License Numbers: DPR-51; NPF-6

Report Numbers: 05000313/2018001; 05000368/2018001; and 07200013/2017001

Enterprise Identifier: I-2018-001-0005

Licensee: Entergy Operations, Inc.

Facility: Arkansas Nuclear One, Units 1 and 2, and Independent Spent Fuel

Storage Installation

Location: Junction of Highway 64 West and Highway 333 South

Russellville, Arkansas

Inspection Dates: January 1, 2018 to March 31, 2018

Inspectors: C. Henderson, Senior Resident Inspector

P. Smagacz, Acting Senior Resident Inspector

T. Sullivan, Resident Inspector

M. Tobin, Resident Inspector

L. Brookhart, Senior Inspector

N. Greene, Ph.D., Senior Health Physicist

J. ODonnell, CHP, Health Physicist

Approved By: N. OKeefe, Branch Chief

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Arkansas Nuclear One, Units 1 and 2, in

accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs

program for overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and

self-revealed findings and violations, and additional items are summarized in the tables below.

A licensee-identified, non-cited violation is documented in report Section 71124.01.

List of Findings and Violations

Failure to Establish Adequate Criteria for Flood Seal Testing

Cornerstone Significance Cross-cutting Inspection

Aspect Procedure

Mitigating Green Finding [H.12] - Avoid 71111.01 -

Systems NCV 05000313/2018001-01 and Complacency External

05000368/2018001-01 Flooding

Closed

The inspectors identified a Green finding and associated non-cited violation of Unit 1 Technical

Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees failure to

establish the criteria for ensuring the necessary conditions existed for a successful test of

hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight Hatches,

Revision 1, did not contain adequate guidance to ensure that the auxiliary building was at a

lower pressure than the turbine building such that puffing smoke on the turbine building side

would allow a seal leak to be detectable.

Failure to Preplan and Perform Service Water Pre-Screen Maintenance

Cornerstone Significance Cross-cutting Inspection

Aspect Procedure

Mitigating Green Finding [H.12] - Avoid 71152 -

Systems NCV 05000368/2018001-02 Complacency Problem

Closed Identification

and

Resolution

The inspectors reviewed a self-revealed, non-cited violation and associated finding of

Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to

properly preplan maintenance that can affect the performance of safety-related equipment.

Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing

the train B service water system to become inoperable.

Additional Tracking Items

Type Issue number Title Inspection Status

Procedure

URI 7200013/2012001-02 Validation of the ANO data 60855.1 Closed

collected during the thermal

validation test and used in

the Holtec analysis

2

Type Issue number Title Inspection Status

Procedure

URI 7200013/2012001-03 Applicability of the ANO 60855.1 Closed

thermal validation test results

to other HI-STORM 100

overpack configurations

LER 05000313/2016-002-00 Tornado Missile Vulnerability 71153 Closed

Resulting in Condition

Prohibited By Technical

Specifications

3

PLANT STATUS

Unit 1 began the inspection period at full power. On March 24, 2018, the unit was shut down to

begin Refueling Outage 1R27.

Unit 2 began the inspection period at full power. On January 14, 2018, the unit reduced power

to 83 percent to perform planned condenser water box cleaning. The unit was returned to rated

thermal power on January 19, 2018.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather (1 Sample)

The inspectors evaluated readiness for seasonal extreme weather conditions prior to the

onset of seasonal cold temperatures.

  • Unit 1 and Unit 2 diesel fuel oil vault on January 30, 2018
  • Alternate ac diesel generator on January 30, 2018
  • Unit 1 and Unit 2 emergency cooling pond on January 30, 2018

External Flooding (1 Sample)

The inspectors evaluated readiness to cope with external flooding on March 16, 2018.

A finding associated with this inspection is documented in the Inspection Results section

below.

4

71111.04 - Equipment Alignment

Partial Walkdown (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) Unit 2 train A emergency feedwater system during planned maintenance of train B

emergency feedwater system on February 7, 2018

(2) Unit 2 swing service water pump B aligned to the emergency cooling pond during intake

structure pre-screen cleaning and maintenance on February 22, 2018

(3) Unit 2 emergency diesel generator 2 ventilation system on March 2, 2018

(4) Unit 1 temporary reactor vessel level identification system on March 28, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the Unit 2

service water system on March 14, 2018.

71111.05 - Fire Protection Annual/Quarterly

Quarterly Inspection (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1) Unit 2 auxiliary building corridor 2109 temporary safety-related battery heating, Fire

Area MM, Fire Zone 2103-V, on January 30, 2018

(2) Unit 1 cable spreading room, Fire Area G, Fire Zone 97-R, on January 31, 2018

(3) Unit 2 upper south piping penetration room, Fire Area EE-L , Fire Zone 2084-DD, on

February 8, 2018

(4) Unit 2 lower south piping penetration room, Fire Area EE-L, Fire Zone 2055-JJ, on

February 8, 2018

Annual Inspection (1 Sample)

The inspectors evaluated fire brigade performance in the Unit 1 control room for a simulated

fire emergency feedwater pump room and the Unit 2 turbine deck for a simulated fire in the

turbine generator on January 4, 2018, and March 09, 2018.

5

71111.06 - Flood Protection Measures

Internal Flooding (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the Unit 2 emergency

feedwater room floor drain system on March 16, 2018.

Cables (1 Sample)

The inspectors evaluated cable submergence protection in Manhole 8 on March 1, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (2 Samples)

(1) The inspectors observed and evaluated Unit 1 simulator training for operating crews on

reactor shutdown and decay heat removal on February 22, 2018.

(2) The inspectors observed and evaluated Unit 2 simulator training for operating crews on

reactor coolant pump motor fire and security related events on February 22, 2018.

Operator Performance (2 Samples)

(1) The inspectors observed and evaluated Unit 2 return to near 100 percent power following

condenser cleaning on January 18, 2018.

(2) The inspectors observed and evaluated Unit 1 reactor shutdown for commencing Refuel

Outage 1R27 on March 23, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (3 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Unit 1 rod control system on January 31, 2018

(2) Unit 2 service water system on March 6, 2018

(3) Internal and external flood seals on March 16, 2018

Quality Control (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the

following equipment performance issues:

(1) Unit 2 control element assembly system on January 31, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control (6 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Unit 2 planned work activities for control element assembly 5 repair on January 5, 2018

6

(2) Unit 2 emergent work activities for emergency diesel generator 2 on January 10, 2018

(3) Unit 2 emergent work activities for service water pump A and C strainer cleaning

following high differential pressure alarm during pre-screen cleaning on

January 19, 2018

(4) Unit 1 and Unit 2 planned work activities for startup transformer 1 and 3 outage for

autotransformer insulator repair on February 2, 2018

(5) Unit 2 planned work activities for service water bay pre-screen cleaning and

maintenance on February 22, 2018

(6) Unit 2 service water pre-screen cleaning on February 22, 2018

71111.15 - Operability Determinations and Functionality Assessments (6 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) Unit 1 operability determination for auxiliary building tornado missile protection wall

missing rebar on January 18, 2018

(2) Unit 1 operability determination for emergency feedwater control valve, CV-2646, stroke

time outside operability limits on January 22, 2018

(3) Unit 2 operability determination for emergency diesel generator 2 relay failure and

automatic start function for containment coolers on January 24, 2018

(4) Unit 1 and Unit 2 operability determination for emergency cooling pond during cold

weather impact of safety-related pumps operating oil temperature on January 31, 2018

(5) Unit 1 and Unit 2 operability determination for 500 kV offsite circuit autotransformer

damaged insulator on February 9, 2018

(6) Unit 2 functional determination emergency feedwater system room floor drain system on

March 16, 2018

71111.18 - Plant Modifications (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2 temporary modification for lifting leads for control element assembly 4 for

degraded upper gripper coils on January 5, 2018

(2) Unit 2 temporary battery room heating on January 30, 2018

71111.19 - Post Maintenance Testing (4 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Unit 2 replacement of service water pump A and C strainers on January 20, 2018

7

(2) Unit 1 auxiliary building hatch HTC-492 smoke testing following resin transfer on

February 14, 2018

(3) Unit 2 motor driven emergency feedwater pump flow transmitter calibration due to the

transmitter reading low out of range on February 20, 2018

(4) Unit 1 temporary reactor vessel level indication due valve, RC-1, repair on

March 28, 2018

71111.20 - Refueling and Other Outage Activities (Partial Sample)

The inspectors evaluated Unit 1 Refueling Outage 1R27 activities from March 24, 2018, to

March 31, 2018. The inspectors completed inspection procedure Sections 03.01.a and

03.01.c.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (3 Samples)

(1) Unit 1 emergency feedwater solenoid operated control valve, CV-2646, establishment of

stroke time reference value and acceptance criteria on January 25, 2018

(2) Unit 1 and Unit 2 verified correct breaker alignment and indicated power availability for

the 161 kV offsite circuited with the 500 kV offsite inoperable during autotransformer

insulator repair on February 2, 2018

(3) Unit 1 train A reactor protection system and rod control system ac breaker surveillance

trip testing on February 27, 2018

In-service (1 Sample)

(1) Unit 2 service water motor operated valve, 2CV-1435-1, service water inlet to train A

shutdown heat exchanger on March 15, 2018

Reactor Coolant System Leak Detection (1 Sample)

(1) Unit 1 small increase of unidentified leakage on March 2, 2018

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (1 Sample)

The inspectors evaluated radiological hazards assessments and controls.

Instructions to Workers (1 Sample)

The inspectors evaluated worker instructions.

8

Contamination and Radioactive Material Control (1 Sample)

The inspectors evaluated contamination and radioactive material controls.

Radiological Hazards Control and Work Coverage (1 Sample)

The inspectors evaluated radiological hazards control and work coverage.

High Radiation Area and Very High Radiation Area Controls (1 Sample)

The inspectors evaluated risk-significant high radiation area and very high radiation area

controls.

Radiation Worker Performance and Radiation Protection Technician Proficiency (1 Sample)

The inspectors evaluated radiation worker performance and radiation protection technician

proficiency.

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Implementation of ALARA and Radiological Work Controls (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the

following activities and/or work packages:

(1) 2017-1070, core bore National Fire Protection Association (NFPA) 805 project and

support activities

(2) 2018-1414, as low as reasonable achievable (ALARA) activities during 1R27

(3) 2018-1420, scaffold installation/removal non-Locked High Radiation Areas - 1R27

(4) 2018-1430, reactor disassembly, reassembly, and support activities

(5) 2018-1900, emergent maintenance activities during 1R27

Radiation Worker Performance (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(8 Samples)

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample, Unit 1 and Unit 2,

(January 1, 2017, through December 31, 2017)

(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample, Unit 1 and Unit 2,

(January 1, 2017, through December 31, 2017)

9

(3) IE04: Unplanned Scrams with Complications Sample, Unit 1 and Unit 2,

(January 1, 2017, through December 31, 2017)

(4) OR01: Occupational Exposure Control Effectiveness Sample (April 1, 2017, through

March 30, 2018)

(5) PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation

Manual (RETS/ODCM) Radiological Effluent Occurrences Sample (April 1, 2017,

through March 30, 2018)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1) Unit 2 train B service water inoperable due to strainer high differential pressure during

pre-screen cleaning following winter shad run on March 27, 2018

A finding associated with this inspection is documented in the Inspection Results section

below.

71153 - Follow-up of Events and Notices of Enforcement Discretion

Events (2 Samples)

(1) The inspectors evaluated licensees response to Unit 2 entry into loss of service water

abnormal operating procedure due to service water pump A and C strainer high

differential pressure alarm during pre-screen cleaning on January 19, 2018.

(2) The inspectors evaluated licensees response to Unit 1 and Unit 2 cyber security issues

on the business network on February 6, 2018.

Licensee Event Reports (LERs) (1 Sample)

The inspectors evaluated the following licensee event reports which can be accessed at

https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) LER 05000313/2016-002-00, Tornado Missile Vulnerability Resulting in Condition

Prohibited By Technical Specifications, on February 5, 2018

OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants

The inspectors evaluated the licensees operation of the independent spent fuel storage

installation (ISFSI) from October 30 to November 2, 2017, on-site at ANO, and conducted

an in-office review of additional documentation related to licensees maintenance of their

cask handling crane until January 2018.

10

The ANO ISFSI consisted of four ISFSI pads. ANO had loaded 24 canisters of the Energy

Solutions ventilated storage cask (VSC) VSC-24 design (Certificate of Compliance

No. 1007) from 1996 to 2003. Since that time, ANO had been loading HI-STORM 100S

Version C overpacks. ANOs ISFSI contained a total of 57 HI-STORM overpacks with

32 MPC-24 canisters and 25 MPC-32 canisters, at the time of the routine inspection. ANO

was currently loading canisters to the Holtec Certificate of Compliance 1014, Amendment 5,

and Final Safety Analysis Report (FSAR), Revision 7.

The ISFSI activities specifically reviewed during the on-site inspection and the subsequent

in-office review included:

(1) Evaluated and observed fuel selection and fuel loading operations.

(2) Reviewed the licensee's loading, processing, and heavy load procedures associated

with their current dry fuel storage campaign.

(3) Reviewed licensees corrective action program implementation for ISFSI operations

since the last routine ISFSI inspection which was completed in December 2015.

(4) Reviewed quality assurance (QA) program implementation, including recent QA

audits, surveillances, receipt inspection, and quality control activities.

(5) Reviewed documentation related to technical specification (TS) required operational

surveillance activities and Final Safety Analysis Report (FSAR) required annual

maintenance activities.

(6) Reviewed the licensees radiological monitoring data for the calendar years 2014,

2015, and 2016.

(7) Reviewed spent fuel documentation for the canisters loaded since the last routine

ISFSI inspection (Holtec Canister 48-57) to confirm the fuel met all TS requirements

for storage and transportation.

(8) Reviewed annual maintenance activities for heavy lifting components which included

special lifting devices and the sites cask handling crane (Auxiliary Building L-3

crane).

(9) Reviewed all 72.48 safety evaluations/screenings for changes made to the licensees

ISFSI operations in accordance with Inspection Procedure 60857 since the last

routine ISFSI inspection.

(10) Reviewed all changes made to the licensees 72.212 Report (Revision 10) in

accordance with Inspection Procedure 60856.1 since the last routine ISFSI

inspection.

Additionally, inspectors closed two unresolved items (URIs) from a routine ISFSI inspection

conducted in 2012 (see Inspection Results).

11

INSPECTION RESULTS

Failure to Establish Adequate Criteria for Flood Seal Testing

Cornerstone Significance Cross-cutting Report

Aspect Section

Mitigating Green [H.1] - 71111.01 -

Systems NCV 05000313/2018001-01 and Resources External

05000368/2018001-01 Flooding

Closed

The inspectors identified a Green finding and associated non-cited violation of Unit 1

Technical Specification 5.4.1.a and Unit 2 Technical Specification 6.4.1.a for the licensees

failure to establish the criteria for ensuring the necessary conditions existed for a successful

test of hatch flood seals. Specifically, Procedure OP 1402.240, Inspection of Watertight

Hatches, Revision 01, did not contain adequate guidance to ensure that the auxiliary building

was at a lower pressure than the turbine building such that puffing smoke on the turbine

building side would allow a seal leak to be detectable.

Description: As part of corrective actions to prevent recurrence for Yellow finding 05000313/2014009-01 and 05000368/2014009-01, the licensee improved the preventive

maintenance for flood seals on hatches that prevented flood waters from external sources

from entering the auxiliary building, where safety-related accident mitigation equipment was

located. These actions included a new testing protocol which established a pressure

differential across the seal, then puffed chemical smoke around the seal and observed for

leaks. Known as a smoke test, this method requires that air pressure inside the auxiliary

building be lower than turbine building air pressure so that when smoke is puffed around the

outside of the seal, the smoke would be pulled into the lower pressure area on the other side,

and leaks would be detectable.

On November 29, 2017, as part of a Confirmatory Action Letter Inspection, NRC inspectors

reviewed corrective actions and observed a smoke test of hatch 492. The inspector noted

that test personnel had checked that the auxiliary building ventilation was in a normal

alignment, but had assumed that this meant that pressure was lower on the auxiliary building

side of the hatch. When the licensee agreed to measure the pressure on each side of the

hatch, pressure was actually higher on the auxiliary building side such that leakage would not

have been detectable.

Procedure OP 1402.240, Inspection of Watertight Hatches, Revision 01, directed personnel

to ensure negative ventilation in the auxiliary building prior to start. However, the procedure

did not state how much pressure differential was needed or how this was to be measured.

The inspector determined that all six hatches that serve as flood barriers were previously

tested using the inadequate procedure. Upon discovery, the licensee took action to ensure

that a negative ventilation in the auxiliary building would be established and verified as part of

the procedure. When re-tested, all hatches passed the smoke test.

Corrective Action(s): The corrective action was to make changes to the procedure to

establish appropriate ventilation lineup and re-perform the smoke tests at all locations.

Corrective Action Reference(s): Condition Report CR-ANO-C-2017-04759

12

Performance Assessment:

Performance Deficiency: The licensees failure to establish adequate prerequisite criteria for

smoke testing flood seals on hatches is a performance deficiency.

Screening: The performance deficiency is more than minor because, if left uncorrected, it has

the potential to become a more significant safety concern. Specifically, because

Procedure OP 1402.240 did not have adequate instructions to ensure the appropriate

ventilation lineup, hatch flood seals would always pass the test regardless of whether the seal

would allow water to pass or not. Therefore, any flooding or pipe rupture could lead to water

ingress into the Unit 1 and Unit 2 auxiliary buildings affecting the availability of mitigating

equipment needed to respond to flooding. This finding affects the Mitigating Systems

Cornerstone.

Significance: The inspectors assessed the significance of the finding using Inspection

Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for

Findings At-Power, dated June 19, 2012. The inspectors determined that the finding had

very low safety significance (Green) because the equipment or safety function was not

completely failed or unavailable, and because the finding does not involve the total loss of

any safety function, identified by the licensee through a probabilistic risk assessment (PRA),

individual plant examination of external events (IPEEE), or similar analysis, that contributes to

external event initiated core damage accident sequences. Specifically, since the hatches

were confirmed to be leak tight after re-testing, no actual loss of function occurred.

Cross-cutting Aspect: This finding has a cross-cutting aspect in the area of human

performance associated with avoiding complacency, because the individuals failed to verify

that procedure prerequisites were met rather than assume they are met based on general

plant conditions.

Enforcement:

Violation: Technical Specification 5.4.1.a for Unit 1 and Technical Specification 6.4.1.a for

Unit 2 requires, in part, that written procedures be established, implemented, and maintained

covering the applicable procedures recommended in Appendix A to Regulatory Guide 1.33,

Quality Assurance Program Requirements, Revision 2, February 1978. Regulatory

Guide 1.33, Appendix A, Section 9.a, states that maintenance that can affect the performance

of safety-related equipment should be properly preplanned and performed in accordance with

written procedures, documented instructions, or drawings appropriate to the circumstances.

Contrary to the above, on November 29, 2017, the licensee failed to properly preplan and

perform maintenance that can affect the performance of safety-related equipment in

accordance with written procedures, document instructions, or drawings appropriate to the

circumstances. Specifically, Procedure 1402.240, Inspection of Watertight Hatches,

Revision 01, failed to include adequate details needed to not verify that the auxiliary building

was at a lower pressure than the turbine building prior to performing a smoke test of the flood

seal of hatch 492. Under the existing conditions, the test would have passed even with a

degraded seal. This condition had the potential to affect the performance of safety-related

mitigating equipment needed to respond to a flooding event.

13

Disposition: This violation is being treated as a non-cited violation, consistent with

Section 2.3.2.a of the Enforcement Policy, because it was very low safety significance

(Green) and was entered into the licensees corrective action program as Condition Report

CR-ANO-C-2017-04759.

Failure to Preplan and Perform Service Water Pre-Screen Maintenance

Cornerstone Significance Cross-cutting Report

Aspect Section

Mitigating Green [H.12] - Avoid 71152 -

Systems NCV 05000368/2018001-02 Complacency Annual

Closed Follow-up of

Selected

Issues

The inspectors reviewed a self-revealed, non-cited violation and associated finding of

Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to

properly preplan maintenance that can affect the performance of safety-related equipment.

Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing

the train B service water system to become inoperable.

Description: On January 19, 2018, ANO Unit 2 was operating in Mode 1 and making

preparations to clean the intake structure service water pre-screens in accordance with

Operating Procedure (OP) 2104.029, Service Water System Operations, Change 109. Two

operable trains of service water are required per Unit 2 Technical Specification 3.7.3.1,

Service Water System while in Mode 1.

The ANO Unit 2 service water system has stationary pre-screens between the traveling

screens and the pumps that must be manually hoisted out of the flow stream to be cleaned.

The configuration is such that debris can be knocked loose and fall back into the flow stream

during cleaning and enter both running pumps. The pre-screens are intended to catch small

debris that was not removed by the traveling screen so that the strainer baskets located

downstream of each pump do not get clogged. The discharge strainer basket design does

not have a self-cleaning feature.

Between January 16, 2018, through dayshift January 18, 2018, the licensee was aware that

they were experiencing a shad (fish) run in the intake canal. The pre-screen differential

pressure (D/P) had been exhibiting a rising trend due to debris buildup. During this

timeframe, the pre-screen and traveling screen D/P went from 3.00 inches of water to

6.75 inches of water. At 8:52 pm on January 18, 2018, the licensee received the service

water high differential pressure alarm and pre-screen D/P was 9.5 inches of water, with a

procedural requirement to initiate action to clean the pre-screens at 8 inches of water. Prior

to the licensee cleaning the pre-screens, D/P reached 18 inches of water. This rate of debris

buildup was unusual considering most D/P effects on the screen are witnessed on ANO

Unit 1 screens and not ANO Unit 2 screens. Based on past experience of slow build-up of

debris, the licensee delayed pre-screen cleaning until 4:14 a.m. on January 19, 2018, to avoid

having maintenance personnel exceed fatigue management limits.

During the lifting and removal of the first pre-screen for cleaning, fish were observed to be

falling off and entering the suction of the A (SW-P-A) and C (SW-P-C) service water pumps.

As a result, the Unit 2 control room received SW-P-A and SW-P-C discharge strainer high

differential pressure (D/P) annunciators. The SW-P-A discharge strainer D/P peaked at

12.8 psid, and the SW-P-C discharge strainer D/P peaked at 24.1 psid. The licensee entered

14

abnormal Operating Procedure 2203.022, Loss of Service Water, Revision 14, and

assessed the operability of train A and B service water systems. The swing pump suction

was aligned to the emergency cooling pond and the pump started so that a second train of

service water could be made available if needed.

Following an engineering evaluation, train B service water system was declared inoperable

due to exceeding the 20 psid operability limit for the SW-P-C strainer; train A service water

system remained operable throughout the event. Over the course of the rest of the day, the

licensee manipulated the service water system to clean the rest of the pre-screens and the

service water pump discharge strainers and reestablish train B service water system

operability. The train B service water system was declared operable at 10:10 p.m. on

January 19, 2018, at which time the Loss of Service Water procedure was exited. The

licensees short term corrective action was to implement a standing order for service water

pre-screens and traveling screens that required operations personnel to log both pre-screen

and traveling screen D/P and clean traveling screens at least weekly and pre-screens weekly.

The licensee documented this issue in Condition Report CR-ANO-C-2018-00299.

The inspectors noted that a similar event occurred on August 19, 2016. The D/P on the

train B service water pump strainer continued to rise until it reached the threshold at which

the performance of an engineering evaluation was required to determine the operability of the

B train of service water. This high D/P was attributed to fouling of the strainer caused by pre-

screen cleaning activities and delaying the start of the cleaning. Despite this event, the same

basic chain of events recurred on January 19, 2018. The inspectors pointed out that the pre-

screen design created an inherent risk of spilling debris into the open hole created by lifting

the pre-screens. With both trains in a normal alignment, most of the debris would enter both

pumps and begin to clog the discharge strainer. The inspectors questioned why this risk was

not avoided by proactively aligning one or both trains to the emergency cooling pond. The

licensee agreed to study this alternative as a possible corrective action.

Corrective Action(s): The immediate corrective action was to restore operability of the train B

service water system and institute a weekly pre-screen cleaning regiment.

Corrective Action Reference(s): Condition Report CR-ANO-C-2018-00299

Performance Assessment:

Performance Deficiency: The licensees failure to properly preplan pre-screen cleaning

maintenance that can affect the performance of safety-related equipment is a performance

deficiency. As a result, the performance of both trains of the safety-related service water

system were challenged, and train B was rendered inoperable.

Screening: The performance deficiency was more than minor because it adversely affected

the human performance attribute of the Mitigating Systems Cornerstone and the cornerstone

objective of ensuring the availability, reliability, and capability of systems that respond to

initiating events to prevent undesirable consequences. Specifically, the licensees failure to

properly preplan pre-screen cleaning maintenance resulted in the train B service water

system being rendered inoperable.

Significance: Using NRC Inspection Manual Chapter 0609, Appendix A, The Significance

Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2,

Mitigating Systems Screening Questions, the inspectors determined that the finding had

very low safety significance (Green) because it: was not a design deficiency; did not

15

represent a loss of system and/or function; did not represent an actual loss of function of at

least a single train for longer than its technical specification allowed outage time; and did not

result in the loss of a high safety-significant, nontechnical specification train.

Cross-cutting Aspect: The finding had a cross-cutting aspect in the area of human

performance associated with avoid complacency because the licensee did not plan for the

inherent risk with cleaning the pre-screens although cleaning of debris has previously

challenged the service water system. Specifically, the licensee did not effectively plan pre-

screen cleaning maintenance to avoid system impacts, and did not consider the rate of

increase in pre-screen differential pressure due to the winter fish runs in deciding when to

start the cleaning.

Enforcement:

Violation: Technical Specification 6.4.1.a requires, in part, that written procedures be

established, implemented, and maintained covering the applicable procedures recommended

in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Section 9.a of

Regulatory Guide 1.33, Appendix A, states that maintenance that can affect the performance

of safety-related equipment should be properly preplanned and performed in accordance with

written procedures, documented instructions, or drawings appropriate to the circumstances.

Contrary to the above, on January 19, 2018, the licensee failed to properly preplan and

perform maintenance as prescribed in Regulatory Guide 1.33. Specifically, the licensee failed

to preplan the cleaning of Unit 2 service water pre-screens prior to high debris loading of the

screens, and failed to place the service water system into an alignment that would have

avoided impacting the operability of this safety-related system.

Disposition: This violation is being treated as a non-cited violation, consistent with

Section 2.3.2.a of the Enforcement Policy, because it was very low safety significance

(Green) and was entered into the licensees corrective action program as Condition Report

CR-ANO-C-2018-00299.

Licensee Identified Non-Cited Violation 71124.01 -

Radiological Hazard

Assessment and

Exposure Controls

This violation of very low safety significant (Green) was identified by the licensee and has

been entered into the licensee corrective action program and is being treated as a non-cited

violation, consistent with Section 2.3.2.a of the Enforcement Policy.

Violation: Title 10 CFR 20.1501(a) requires that each licensee make or cause to be made

surveys that may be necessary for the licensee to comply with the regulations in

10 CFR Part 20, and that are reasonable under the circumstances to evaluate the magnitude

and extent of radiation levels, concentrations, or quantities of radioactive materials, and the

potential radiological hazards that could be present.

Contrary to the above, on August 7, 2017, the licensee failed to make necessary surveys of

the Unit 2, 2T-15 tank room, that were reasonable to evaluate the magnitude and extent of

radiation levels that could be present. Consequently, workers were allowed access to an

area with dose rates up to 1000 millirem per hour at 30 cm without a proper briefing or

oversight.

16

Significance: Using NRC Manual Chapter 0609, Appendix C, Occupational Radiation Safety

Significance Determination Process, the inspectors determined the finding to be of very low

safety significance (Green) because: (1) it was not associated with as low as is reasonably

achievable (ALARA) planning or work controls; (2) there was no overexposure; (3) there was

no substantial potential for an overexposure; and (4) the ability to assess dose was not

compromised.

Corrective Action Reference(s): CR-ANO-2-2017-04634 and CR-ANO-2-2017-05337

Unresolved Item Validation of the ANO data collected during the thermal 60855.1

(Closed) validation test and used in the Holtec analysis.

URI 7200013/2012001-02

Description: During the routine ISFSI inspection conducted on October 29 - November 1,

2012, an unresolved item (URI) was identified and documented in the routine ISFSI NRC

Inspection Report 05000313/20120008, 05000368/2012008, and 07200013/2012001

(ADAMS Accession No. ML13057A986).

The Holtec International HI-STORM 100 Certificate of Compliance (CoC) No. 1014,

Condition 9, required the performance of a one-time thermal validation test on the first cask

that exceeded 20 kW to validate the analytical methods and thermal performance predicted by

the licensing basis thermal model as described in Chapter 4 of the Holtec HI-STORM 100

FSAR. ANO was the first general licensee to load a canister exceeding 20 kW and, as such,

was required to perform the thermal validation test in accordance with License Condition 9.

During the NRC inspection in 2012, the inspectors identified that ANO had completed the test

using instrumentation that had not been controlled or calibrated in accordance with ANOs

quality assurance program. The NRC identified this failure to follow the ANOs quality

assurance program for the thermal validation test instrumentation as a non-cited violation of

10 CFR 72.164 (NCV 07200013/2012001-01) consistent with Section 2.3.2 of the NRC

Enforcement Policy. The validation of the data collected by the instrumentation used during

the test was considered indeterminate until the licensee was able to demonstrate that the

equipment was properly calibrated by a qualified vender on the licensees approved vendor

list. The resolution of this issue was tracked as an unresolved item

(URI 07200013/2012001-02).

ANO took corrective actions to verify that the data from the measuring instruments was

acceptable by sending the equipment to a qualified lab to verify the equipment was properly

calibrated. ANO was able to verify the calibration of the resistance temperature detectors

used in the test. The other equipment used in the test were DANTEC LVFA wind

tunnel 435-1010 anemometer probes which measured air velocities at very low rates of

speed. ANO sent these anemometers to multiple labs including Exelon Labs and National

Aeronautics and Space Administration (NASA) for calibration. Unfortunately, none of the labs

were able to successfully test the equipment to verify they were properly calibrated, and upon

return to ANO, the anemometers were broken in transit. ANO was unable to verify the validity

of the data collected during their thermal validation test.

Corrective Action Reference(s): CR-ANO-C-2013-00374, CR-ANO-C-2013-0575, and

CR-ANO-C-2013-00576

Closure Basis: Since the ANO staff were unable to validate the data collected for the thermal

validation test, as required by CoC License Condition 9, the required test will still need to be

17

performed. However, the NRC has concluded that the wording from CoC License Condition 9

(Amendments 5-9) was not suitable to provide adequate test data to confirm the Holtec

thermal analysis as described in the FSAR. The License Condition 9 required measuring air

velocity within the annulus area between the canister and the overpack. The data provided in

the ANO test was inconsistent and the test requirements listed in the CoC Amendments 5

through 9, License Condition 9, needed to be revised to provide more consistent data that

could be utilized by the vendor and the NRC to verify the analytical models from the FSAR.

On May 31, 2016, NRC issued CoC 1014, License Amendment 10, (ADAMS Accession

No. ML17237B994) which modified the License Condition 9 thermal validation test to measure

air velocity at the inlet vents and not the annulus area between the canister and the overpack.

The first general licensee to load a canister that exceeds 20 kW, under CoC 1014 License

Amendment 10, is required to perform the thermal validation test using the new method as

described in the license condition. This test will provide sufficient data for the vendor to

perform the required analysis and allow the NRC more stable results to review and conclude

on the validation of the thermal model as described in the FSAR. A licensee in another region

has described their intention of performing the required thermal validation test in the 2018

timeframe.

Unresolved Item Applicability of the ANO thermal validation test results to 60855.1

(Closed) other HI-STORM 100 overpack configurations.

URI 07200013/2012001-03

Description: On February 3, 2012, Entergy submitted a letter to the NRC informing the

agency of the completion of the thermal validation test (discussed above) and the completion

of the Holtec analysis (ADAMS Accession No. ML12038A177). On September 14, 2012,

Holtec also informed the NRC of the completion of the ANO thermal validation test and

provided a copy of Holtec Report HI-2114925 (ADAMS Accession No. ML12264A541) which

evaluated the test data. The Holtec report indicated that the thermal model utilized in the

licensing-based analysis methodology had predicted an air mass flow rate lower than the

values measured in the ANO thermal test and, as such, demonstrated an overall

conservatism of the licensing-based methodology, thereby confirming the suitability of the

methodology for demonstrating the thermal-hydraulics safety of the HI-STORM 100 cask

system and satisfying the requirement of Condition 9.

Holtec issued a statement to the other HI-STORM 100 general licensee users concerning the

ANO test on a HI-STORM 100S, Version C, overpack and whether the results could be

applied to other cask models of the 100 series. Holtec Licensing Position Paper HL-2011-01

was distributed to Holtec cask users dated August 5, 2011. Holtec concluded that the ANO

test data demonstrated the validity of the thermal models, and as such, the results of the ANO

test could be applied to any of the HI-STORM 100 overpack configurations. During a meeting

on December 18, 2012, between the NRC, ANO, and Holtec, the applicability of the ANO test

to the other HI-STORM overpacks was discussed extensively. A number of questions

remained as to the sensitivity of the test results to the various configurations of the overpack

dimensions and vent sizes. As such, the NRC needed to perform an independent evaluation

to confirm Holtecs position. The independent review performed by the NRC was tracked as

an unresolved item (URI 07200013/2012001-03).

Corrective Action Reference(s): CR-ANO-C-2013-00374, CR-ANO-C-2013-0575, and CR-

ANO-C-2013-00576

18

Closure Basis: As described above in URI 07200013/2012001-01, the NRC concluded that

the wording from CoC License Condition 9 (Amendments 5-9) was not suitable to provide

adequate test data to confirm Holtecs thermal methodology. On May 31, 2016, NRC issued

CoC 1014 License Amendment 10 (ADAMS Accession No. ML17237B994), which modified

the License Condition 9 thermal validation test to measure air velocity at the inlets and not the

annulus area between the canister and the overpack. The first general licensee to load a

canister that exceeds 20 kW under CoC 1014 License Amendment 10, is required to perform

the thermal validation test using the new method as described in the License Condition. Once

the new data is collected and analyzed by the general licensee and the vendor, the

information will be submitted to the NRC for an independent review.

A general licensee in another region has described their intention of performing the required

thermal validation test in the 2018 timeframe.

19

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 18, 2018, the inspector presented the results from the routine ISFSI inspection to

Ms. S. Pyle, Licensing Manager, and other members of the licensee staff.

On March 30, 2018, the inspector presented the radiation protection inspection results to

Mr. R. Anderson, Site Vice President, and other members of the licensee staff.

On April 4, 2018, the inspector presented the quarterly resident inspector inspection results to

Mr. J. Kirkpatrick, General Manager of Plant Operations, and other members of the licensee

staff.

On April 18, 2018, the inspectors presented the re-exit of the quarterly resident inspector

inspection results to Ms. S. Pyle, Regulatory Assurance Manager, and other members of the

licensee staff.

20

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Miscellaneous Documents

Number Title Revision

M-2204 Piping & Instrument Diagram, Emergency Feedwater, 72

Sheet 4

Procedures

Number Title Revision

2104.036 Emergency Diesel Generator Operations 94

2106.006 Emergency Feedwater System Operations 97

2106.032 Unit Two Freeze Protection Guide 27

1402.240 Inspection of Watertight Hatches 2

Condition Reports (CR-ANO-)

C-2018-00050 1-2017-03673

71111.04 - Equipment Alignment

Miscellaneous Documents

Number Title Revision

CALC-91-E- ANO-2 EDG Room Ventilation 2

0090-02

CALC-91-R- 28

2013-01

EC-24964 U-2 Emergency Diesel Generator Cycle 20 Heat Exchanger

Thermal Performance Evaluation

EC-45962 2K-4A/B 2013 Emergency Diesel Heat Exchanger Thermal

Performance Test

EC-46332 U-2 Emergency Diesel Generator Thermal Performance

Test Review 2011

EC-52442 2014 2K-4A/B Thermal Performance Evaluation

EC-66265 U-2 SW Strainer D/P Spike Op Input 0

ER-ANO-2006-

0248-000

GL-89-13 SW System Problems Affecting Safety-Related Equipment

Attachment 1

Miscellaneous Documents

Number Title Revision

M-2204 Piping & Instrument Diagram, Emergency Feedwater, 72

Sheet 4

M-2210 Piping & Instrument Diagram, Service Water, Sheet 1 - 4 83

STM-2-42 SW and ACW Systems 38

Procedures

Number Title Revision

1403.191 Motor Testing Using MCE/EMAX 11, 12

2104.029 Service Water System Operations 109

2104.036 Emergency Diesel Generator Operations 94

2104.044 Ventilation System Operations 44

2106.006 Emergency Feedwater System Operations 97

Condition Reports (CR-ANO-)

1-2013-03239 1-2016-05663 1-2016-05675 1-2016-05676

1-2017-00186 1-2018-00132 2-2012-00762 2-2015-02748

2-2015-02879 2-2015-05329 2-2016-00035 2-2016-00550

2-2016-02987 2-2016-03206 2-2016-03918 2-2016-04462

2-2017-05291 2-2017-05919 2-2018-00157 2-2018-00165

2-2018-00168 C-2013-03165 C-2016-05226 C-2016-05445

C-2017-04059 C-2017-04069 C-2017-04775 C-2018-00277

C-2018-00441

Work Orders

52537116 52728726 497922-01

71111.05 - Fire Protection

Miscellaneous Documents

Number Title Revision/Date

Pre-Drill Brief - ASOTH-FP-FBDRLS 9

EC-52999 Justification for Additional Non-Q Battery Room Heating 00

A1-2

Miscellaneous Documents

Number Title Revision/Date

ER-ANO-2002- Justification for Temporary Non-Q Battery Room Heating January 30,

0145-00 2002

FBDRL-2018-03 Fire Drill March 9,

2018

Procedures

Number Title Revision

2106.032 Unit Two Freeze Protection Guide 27

71111.06 - Flood Protection Measures

Drawings

Number Title Revision

E-601 Electrical Plot Plan Outdoor Area, Sheet 1

1402.240 Inspection of Watertight Hatches 2

Work Orders

52747174

71111.11 - Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number Title Revision

OP-2202.001 Standard Post Trip Actions 16

OP-2202.002 Reactor Trip Recovery 11

OP-2203.009 Fire Protection System Annunciator Corrective Actions 32

OP-2203.025 RCP Emergencies 18

OP-2203.034 Fire or Explosion 21

71111.12 - Maintenance Effectiveness

Drawings

Number Title

234C7880F Induction Motor

A1-3

Miscellaneous Documents

Number Title Revision

117 Engineering Evaluation, SW Pumps 6

2015 U-2 SW System Health Report Q1, Q2, Q3, Q4

2016 U-2 SW System Health Report Q1, Q2, Q4

2017 U-2 SW System Health Report Q2

EC-28463 SW System 0

N 1000.006-P E-Doc, SW System Ops 53

TDG080 1710 Triclad Vertical Induction Motors 3

Procedures

Number Title Revision

1304.125 Unit 1 RPS-A/CRD Breaker Trip Test 26

1309.013 Flow Rate Data

2104.029 SW System Ops 109

2203.022 Loss of SW Tech Guidelines 14

2311.002 Flow Rate Data

2411.102 U-2 Slide Gate and SW Bay Cleaning/Inspection

EN-DC-204 Maintenance Rule Scope and Basis 4

EN-DC-205 Maintenance Rule Monitoring 6

EN-FAP-OM-012 Prompt Investigation and Notifications, Attn. 7.4 9

EN-LI-118 ANO Response to Cold Weather Shad Runs 25

1402.240 Inspection of Watertight Hatches 2

Condition Reports (CR-ANO-)

1-2017-00965 2-2014-02814 2-2015-00083 2-2015-00129

2-2015-00268 2-2016-01808 2-2016-02351 2-2016-02611

2-2017-01162 2-2017-05280 2-2017-05281 2-2017-05329

2-2017-05759 2-2018-00044 2-2018-00045 2-2018-00157

2-2018-00300 2-2018-00445 2-2018-00797 C-2017-00287

C-2018-00299 C-2018-01623 1-2017-03673

A1-4

Work Orders

189034 435369 453805 468095 486027

489032 51803722 52652306 52711156 52713201

52715932 52728009 52766896 52784316

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Miscellaneous Documents

Number Title Revision

COPD-024 Risk Assessment Actions 64

Procedures

Number Title Revision

1107.001 Electrical System Operations 115

2104.029 Service Water System Operations 109

2203.003 CEA Malfunction 24

EN-FAP-OM-021 Critical Decision Procedure 5

EN-OP-119 Protected Equipment Postings 9

EN-WM-104 On Line Risk Assessment 16

Condition Reports (CR-ANO-)

C-2018-00474 C-2018-00475

Work Orders

490410

71111.15 - Operability Determinations and Functionality Assessments

Drawings

Number Title

A2001S01 ANO 500/161KV SW STA Station One-Line In-Service

Diagram

E-2100 Schematic Diagram Diesel Generator 2K4A ACB 152-308

E-2276 Schematic Diagram Service Water Pump 2P4B

E-2361 Schematic Diagram Containment Cooling 2VSF1A

E-2361 Schematic Diagram Containment Cooling 2VSF1B

A1-5

Miscellaneous Documents

Number Title Date

00-R-2011-01 Calculation

OPS-152A SU1 Outage Checklist - Unit 1 - 72-Hour TC August 29,

2013

OPS-152B SU3 Outage Checklist - Unit 2 - 72-Hour TC August 29,

2013

Procedures

Number Title Revision

1106.006 Emergency Feedwater Pump Operation 100, 101, 102

Condition Reports (CR-ANO-)

1-2000-00068 1-2017-01820 1-2018-00086 2-2000-00074

2-2018-00055 2-2018-00065 2-2018-00088 C-2018-00389

C-2018-00474 C-2018-00475

Work Orders

490410-16

71111.18 - Plant Modifications

Miscellaneous Documents

Number Title Revision/Date

CALC-86E-0020- 1E Station Battery 2D11 Duty Cycle and Sizing Calculation 18

01

EC-52999 Justification for Additional Non-Q Battery Room Heating 00

ER-ANO-2002- Justification for Temporary Non-Q Battery Room Heating January 30,

0145-00 2002

STM 2-32-5 125 VDC Electrical Distribution 25

Procedures

Number Title Revision

2106.032 Unit Two Freeze Protection Guide 27

A1-6

Condition Reports (CR-ANO-)

2-2003-00041 2-2014-00345

Work Orders

490646

71111.19 - Post-Maintenance Testing

Procedures

Number Title Revision

2304.237 Post Maintenance Verification 16

Condition Reports (CR-ANO-)

1-2018-01107 2-2018-00356

Work Orders

494916

71111.22 - Surveillance Testing

Miscellaneous Documents

Number Title Revision/Date

CALC-95-R-

0014-02-01

MWO50235000

MWO50235239

MWO50235641

OPS-152A SU1 Outage Checklist - Unit 1 - 72-Hour TC August 29,

2013

OPS-152B SU3 Outage Checklist - Unit 2 - 72-Hour TC August 29,

2013

SEP-ANO-1- ANO-1 Inservice Testing Basis Document 3

IST-1

Procedures

Number Title Revision

1104.209 SW Pump Performance Curves

A1-7

Procedures

Number Title Revision

1106.006 Emergency Feedwater Pump Operation 100, 101, 102

1107.001A Unit 1 XFMR Outage Checklist 115

1304.125 Unit 1 RPS-A/CRD Breaker Trip Test 26

2104.029 SW Pump Performance Curves

Condition Reports (CR-ANO-)

1-2009-01820 1-2017-00965 1-2018-00086 1-2018-00631

2-2017-05885 C-2018-00474

Work Orders

52747144

71124.01 - Radiological Hazard Assessment and Exposure Controls

Air Sample Surveys

Number Title Date

AS-ANO-2018- RAB 10 - P36 A Makeup Pump Tear Down March 2,

04648 2018

AS-ANO-2018- RAB 11 - AMS-4 Alarm March 7,

04660 2018

AS-ANO-2018- RAB 121 - Replace 2RE - 8221-2 Blower Pump UNPR March 9,

04665 2018

Audits and Self-Assessments

Number Title Date

LO-ALO-2017- Self-Assessment: Radiation Safety - Hazard Assessment March 22,

00025 and Airborne Controls 2017

QA-14/15-2017- November 6,

Combined Radiation Protection and Radwaste

ANO-01 2017

Miscellaneous Documents

Number Title Date

NSTS Annual Inventory Reconciliation Report January 11,

2018

ANO Alpha Hazard Evaluation May 3, 2017

A1-8

Miscellaneous Documents

Number Title Date

ANO-2017-0067 Spent Fuel Pool Inventory - Non-Fuel Items August 22,

2017

ANO-2017-0093 2017 Radiation Energy Distribution Evaluation December 7,

2017

52742701 Annual Inventory of Non-Installed Radioactive Sources February 20,

2018

52745968 Semi Annual Leak Test of Sealed Sources February 15,

2018

Procedures

Number Title Revision

EN-RP-100 Radiation Worker Expectations 12

EN-RP-101 Access Control for Radiologically Controlled Areas 14

EN-RP-102 Radiological Control 5

EN-RP-104 Personnel Contamination Events 10

EN-RP-105 Radiological Work Permits 18

EN-RP-106 Radiological Survey Documentation 7

EN-RP-108 Radiation Protection Posting 20

EN-RP-109 Hot Spot Program 5

EN-RP-121 Radioactive Material Control 14

EN-RP-123 Radiological Controls for Highly Radioactive Objects 1

EN-RP-143 Source Control 13

EN-RP-152 Conduct of Radiation Protection 3

Radiation Surveys

Number Title Date

1609-0457 U1 AUX 335 EL - F3A/F3B Filter Rooms September

19, 2016

1703-0336 U1 AUX Bldg - T-15 Tank Room March 14,

2017

1801-0490 U1 AUX 335 EL F2 Seal Injection Filter Room January 31,

2018

1802-0204 Semi Annual Source Leak Test February 14,

2018

A1-9

Radiation Work Permits

Number Title Revision

20181401 Radiation Protection Activities During 1R27 00

20181407 Decontamination Activities During !R27 (Bulk Work) 00

20181412 1R27 Locked High Radiation Area Activities (Bulk Work) 01

20181425 RCP Motor Maintenance During 1R27 00

20181430 Reactor Disassembly/Re-Assembly, and Support Activities 00

20181432 De-Fuel & Re-Fuel the Reactor 00

20182053 Spent Fuel Activities - Unit 2 00

Condition Reports (CR-ANO-)

1-2018-00585 1-2018-00997 1-2018-01273 2-2017-01634

2-2017-04273 2-2017-04634 2-2017-05337 2-2017-06115

C-2017-00890 C-2017-00946 C-2017-01105 C-2017-03822

C-2017-03929 C-2018-01264

Fleet Condition Reports (CR-HQN-)

2017-00179 2017-00848 2017-00974

71124.02 - Occupational ALARA Planning and Controls

ALARA Planning, In-Progress Reviews, and Post-Job Reviews

Number Title Date

20171070 Core Bore NFPA 805 Project and Support Activities March 6,

2018

20181070 Core Bore NFPA 805 Project and Support Activities March 5,

2018

20181430 Reactor Disassembly, Reassembly, and Support Activities June 17,

2017

Audits and Self-Assessments

Number Title Date

LO-ALO-2017- Self-Assessment: Radiation Safety - ALARA & Dose September

00023 Assessment 11, 2017

QA-14/15-2017- Quality Assurance Audit: Combined Radiation Protection November 6,

ANO-01 and Radwaste 2017

A1-10

Miscellaneous Documents

Number Title Date

Letdown Heat Exchanger (E-29A/B) Flush Plan March 28,

2018

TSR 18-1-063 Letdown Heat Exchangers, E-29A and E-29B December 7,

2017

TSR 18-1-064 RBD-11A & RBD-12A / Makeup System December 7,

2017

TSR 18-1-123 Letdown Cooler E-29A&B Inlet/Outlet Isolation December 7,

2017

Procedures

Number Title Revision

EN-RP-105 Radiological Work Permits 18

EN-RP-110 ALARA Program 14

EN-RP-110-03 Collective Radiation Exposure Guidelines 4

EN-RP-110-04 Radiation Protection Risk Assessment Process 7

EN-RP-110-06 Outage Dose Estimating and Tracking 1

Radiation Work Permits

Number Title Revision

20171070 Core Bore NFPA 805 Project and Support Activities 03

20181070 Core Bore NFPA 805 Project and Support Activities 03

20181401 Radiation Protection Activities During 1R27 00

20181414 ALARA Activities During 1R27 00

20181420 Scaffold Installation / Removal Non-LHRAs - 1R27 00

20181430 Reactor Disassembly, Reassembly, and Support Activities 00

20181900 Emergent Maintenance Activities During 1R27 00

Condition Reports (CR-ANO-)

1-2018-00336 1-2018-00508 1-2018-00849 2-2017-05526

C-2017-04230 C-2017-04551 C-2017-04692 C-2018-00851

A1-11

Fleet Condition Reports (CR-HQN-)

2017-01791

71151 - Performance Indicator Verification

Procedures

Number Title Revision

EN-LI-114 Regulatory Performance Indicator Process 7, 8

71152 - Problem Identification and Resolution

Miscellaneous Documents

Number Title Revision

EC-66265 U-2 SW Strainer D/P Spike Op Input 0

ER-ANO-2006-

0248-000

GL-89-13 SW System Problems Affecting Safety-Related Equipment

Condition Reports (CR-ANO-)

1-2013-03239 1-2016-05663 1-2016-05675 1-2016-05676

1-2017-00186 1-2018-00132 2-2012-00762 2-2015-02748

2-2015-02879 2-2015-05329 2-2016-00035 2-2016-00550

2-2016-02987 2-2016-03206 2-2016-03918 2-2016-04462

2-2017-05291 2-2017-05919 2-2018-00157 2-2018-00165

2-2018-00168 C-2013-03165 C-2016-05226 C-2016-05445

C-2017-04059 C-2017-04069 C-2017-04775 C-2018-00277

C-2018-00441 C-2018-0299

71153 - Follow-up of Events and Notices of Enforcement Discretion

Miscellaneous Documents

Number Title

CALC-16-E- Tornado Missile Shield for Door 77, Room 144

0017-01

EC 67019 Door 77, room 144 Tornado Generated Missile Barrier

ECN 73255 Resolution of Rebar Interferences for DR-77 Missile Barrier

A1-12

Miscellaneous Documents

Number Title

LER Tornado Missile Vulnerability Resulting in Condition

05000313/2016- Prohibited By Technical Specifications

002-00

Condition Reports (CR-ANO-)

1-2016-01788

Other Activities

Design Basis Documents

Number Title Revision/Date

72.212 72.212 Report for ANO ISFSI 10

Area-TLD Report Review of 2014 Area Monitoring Results (1st/2nd half) February

2015

Area-TLD Report Review of 2015 Area Monitoring Results (1st/2nd half) February

2016

Area-TLD Report Review of 2016 Area Monitoring Results (1st/2nd half) February

2017

CoC 1014 CoC and Technical Specifications for HI-STORM 100 Amendment 5

ISFSI FSAR HI-STORM 100 ISFSI Final Safety Analysis Report 7

LTR-PAR-17-081 Evaluation of XSAM Periodic Test ANO, Two Block November 20,

2017

WTHQN-2015- Surveillance Activity Report April 15, 2015

277

WTHQN-2015- Surveillance Activity Report April 15, 2015

605

WTHQN-2016- Surveillance Activity Report December 9,

774 2016

Miscellaneous Documents

Number Title Date

ANO-1708-0273 Survey of Dry Fuel Pad August 16,

2017

ANO-1708-0279 Survey of CTF Dry Fuel Storage Pad August 16,

2017

A1-13

Miscellaneous Documents

Number Title Date

WTHQN-2016- Surveillance Activity Report December 9,

775 2016

WTHQN-2016- Surveillance Activity Report February 16,

776 2016

WTHQN-2016- Surveillance Activity Report December

777 15, 2016

WTHQN-2017- Surveillance Activity Report January 25,

111 2017

WTHQN-2017- Surveillance Activity Report April 27, 2017

372

WTHQN-2017- Surveillance Activity Report June 9, 2017

453

Procedures

Number Title Revision

1015.003B Unit Two Operations Logs 80

EDR-1 Generic Licensing Topical Report for L-3 Crane 3

EN-DC-215 Fuel Selection for Holtec Dry Cask Storage for Canisters 48 6

through 57

EN-LI-100 Process Applicability Determination 20

EN-LI-101 10 CFR 50.59 Evaluations 15

EN-LI-112 10 CFR 72.48 Evaluations 12

EN-LI-115 HI-STORM 100 ISFSI Licensing Document Preparation and 7

Control

EN-RP-210 Area Monitoring Program 1

OP-3403.004 HI-STORM 100 System Equipment Preparation 18

OP-3403.005 HI-STORM 100 System Loading Operations 40

OP-3403.008 HI-TRAC and MPC Preparations for Fuel Loading 1

OP-3403.009 MPC Receipt Inspections 1

OP-3403.010 HI-STORM Overpack Receipt Inspections 1

OP-3406.005 Hi-STORM and HI-TRAC Transport Operations 14

OP-3406.006 Forced Helium Dehydration System Operations 9

OP-3406.007 Supplemental Cooling System Operations 8

A1-14

72.48 Evaluations

Number Title Date

DFS-15-001 72.48 Evaluation, Foreign Material December

22, 2015

DFS-16-001 72.48 Evaluation, Application of Concrete Sealant January 21,

2016

Condition Reports (CR-ANO-)

1-2017-3441 1-2017-3445 1-2017-3447 1-2017-3448

1.2017-3449 1.2017-3450 1-2017-3451 1-2017-3538

1-2017-3540 1-2017-3541 1-2017-3555 1-2016-0403

2-2015-2420 2-2016-0359 2-2016-2071 C-2015-0849

C-2015-0918 C-2015-0969 C-2015-1185 C-2015-2297

C-2015-2765 C-2015-3387 C-2015-4664 C-2015-4693

C-2015-4905 C-2015-4971 C-2016-0038 C-2016-0834

C-2016-0848 C-2016-1344 C-2016-2844 C-2016-3647

C-2016-4458 C-2017-2506 C-2017-2850

Engineering Changes

EC-15295 EC-37094 EC-42379 EC-45077 EC-48646

EC-48806 EC-52044 EC-52619 EC-54103 EC-59072

EC-63881 EC-73641

Work Orders

00065585 00408695 00419603 00439666 00479654

00488244 00489244 52393253 52576506 52629825

52629826 52638961 52663017 52667631 52687172

52687173 52701892 52707684 52719037

A1-15

The following items are requested for the

Occupational Radiation Safety Inspection

Arkansas Nuclear One

March 26 thru 30, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before March 9, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the on-site inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at (817) 200-1154 or

natasha.greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

Attachment 2

1. Radiological Hazard Assessment and Exposure Controls (71124.01) and

Performance Indicator Verification (71151)

Date of Last Inspection: April 10, 2017

A. List of contacts and telephone numbers for the Radiation Protection Organization Staff

and Technicians

B. Applicable organization charts

C. Audits, self-assessments, and LERs written since date of last inspection, related to this

inspection area

D. Procedure indexes for the radiation protection procedures

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program Description

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Posting of Radiological Areas

5. High Radiation Area Controls

6. RCA Access Controls and Radiation Worker Instructions

7. Conduct of Radiological Surveys

8. Radioactive Source Inventory and Control

9. Declared Pregnant Worker Program

F. List of corrective action documents (including corporate and sub-tiered systems) since

date of last inspection

a. Initiated by the radiation protection organization

b. Assigned to the radiation protection organization

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

If not covered above, a summary of corrective action documents since date of last

inspection involving unmonitored releases, unplanned releases, or releases in which any

dose limit or administrative dose limit was exceeded (for Public Radiation Safety

Performance Indicator verification in accordance with IP 71151)

G. List of radiologically significant work activities scheduled to be conducted during the

inspection period (If the inspection is scheduled during an outage, please also include a

list of work activities greater than 1 rem, scheduled during the outage with the dose

estimate for the work activity.)

H. List of active radiation work permits

A2-2

I. Radioactive source inventory list

a. All radioactive sources that are required to be leak tested

b. All radioactive sources that meet the 10 CFR Part 20, Appendix E, Category 2

and above threshold. Please indicate the radioisotope, initial and current activity

(w/assay date), and storage location for each applicable source.

J. The last two leak test results for the radioactive sources inventoried and required to be

leak tested. If applicable, specifically provide a list of all radioactive source(s) that have

failed its leak test within the last two years

K. A current listing of any non-fuel items stored within your pools, and if available, their

appropriate dose rates (Contact / @ 30cm)

L. Computer printout of radiological controlled area entries greater than 100 millirem since

the previous inspection to the current inspection entrance date. The printout should

include the date of entry, some form of worker identification, the radiation work permit

used by the worker, dose accrued by the worker, and the electronic dosimeter dose

alarm set-point used during the entry (for Occupational Radiation Safety Performance

Indicator verification in accordance with IP 71151).

A2-3

2. Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: November 6, 2017

A. List of contacts and telephone numbers for ALARA program personnel

B. Applicable organization charts

C. Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D. Procedure index for ALARA Program

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I. Outline of source term reduction strategy

J. If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K. Please provide your most recent Annual ALARA Report.

A2-4

ML18120A214

SUNSI Review Non-Sensitive Publicly Available Keyword:

By: NFO/rdr Sensitive Non-Publicly Available NRC-002

OFFICE SPE:DRP/E C:DRP/E

NAME JDixon NOKeefe

SIGNATURE /RA/ /RA/

DATE 4/30/18 4/30/18

ML18120A037

SUNSI Review Non-Sensitive Publicly Available Keyword:

By: NFO/rdr Sensitive Non-Publicly Available NRC-002

OFFICE SPE:DRP/E BC:DRP/E BC:DRP/E

NAME JDixon LBrookhart NOKeefe

SIGNATURE /RA/ /RA-E/ /RA/

DATE 4/30/18 4/27/18 4/30/18