SUBJECT:
ARKANSAS NUCLEAR ONE - INTEGRATED INSPECTION REPORT 05000313/2021003 AND 05000368/2021003
Dear Mr. Dinelli:
On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One. On October 14, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ami N. Agrawal, Acting Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000313 and 05000368
License Numbers:
Report Numbers:
05000313/2021003 and 05000368/2021003
Enterprise Identifier:
I-2021-003-0110
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear One
Location:
Russellville, AR
Inspection Dates:
July 1, 2021, to September 30, 2021
Inspectors:
D. Antonangeli, Health Physicist
N. Brown, Resident Inspector
R. Bywater, Senior Resident Inspector
K. Clayton, Senior Operations Engineer
T. DeBey, Resident Inspector
M. Doyle, Operations Engineer
S. Graves, Senior Reactor Inspector
M. Hayes, Operations Engineer
J. O'Donnell, Senior Health Physicist
Approved By:
Ami N. Agrawal, Acting Chief
Reactor Projects Branch D
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period at full power. On August 27, 2021, Unit 1 operators reduced power to 54 percent at the request of the grid operator to reduce station output. Operators returned the unit to full power on the same day.
Unit 2 began the inspection period at full power and began an end-of-operating cycle power coast down on August 20, 2021. On September 24, 2021, Unit 2 operators initiated a power reduction and took the unit offline to begin a planned refueling outage on September 25, 2021.
Unit 2 was in a refueling outage for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.
As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 turbine-driven emergency feedwater train during motor-driven emergency feedwater preventive maintenance on August 4, 2021
- (2) Unit 1 decay heat removal/low-pressure injection pump A during decay heat removal/low-pressure injection pump B preventive maintenance on August 9, 2021
- (3) Alternate ac emergency diesel generator during outage of Unit 1 red train emergency diesel generator on August 24, 2021
- (4) Unit 2 high pressure safety injection pump C on September 22, 2021
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 2 cable spreading room, Fire Zone 2098-L, on July 14, 2021
- (2) Unit 2 main steam isolation valve room, Fire Zone 2155-A, on August 3, 2021
- (3) Unit 2 emergency diesel generator room access corridor, Fire Zone 2109-U, on August 12, 2021
- (4) Unit 2 engineered safety features vault B, Fire Zone 2007-LL, on September 23, 2021
- (5) Unit 1 cable spreading room, Fire Zone 97-R, on September 24, 2021
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Unit 2 north diesel generator room 2094-Q on August 15, 2021
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (2 Samples)
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on July 23, 2021.
- (2) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered June 1 through July 30, 2021.
71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)
- (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on the week of June 22, 2021.
Annual Requalification Operating Tests The inspectors evaluated the adequacy of the licensees annual requalification operating test.
Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2), and that the licensee is effectively evaluating their licensed operators for mastery of training objectives.
Requalification Examination Security The inspectors evaluated the ability of the licensee to safeguard examination material, such that the examination is not compromised.
Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.
Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.
Control Room Simulator The inspectors evaluated the adequacy of the licensees control room simulator in modeling the actual plant and for meeting the requirements contained in 10 CFR 55.46.
Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during a Unit 1 emergent downpower to approximately 55 percent due to loss of the Mabelvale 500 kV line on August 27, 2021.
- (2) The inspectors observed and evaluated a Unit 2 crew performing a plant cooldown to Mode 4 and transfer to the shutdown cooling system with low-temperature overpressure protection on September 25, 2021.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a Unit 1 licensed operator simulator training scenario on August 17, 2021.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Alignment of door seals for Unit 2 engineered safety feature rooms on the 317-foot level on September 20, 2021
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1 emergency feedwater pump B maintenance on August 4, 2021
- (2) Unit 2 core operating limits supervisory system maintenance on August 5, 2021
- (3) Unit 1 emergency diesel generator planned maintenance on August 25, 2021
- (4) Unit 2 planned entry into lowered reactor coolant system inventory on September 29, 2021
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Alternate ac diesel generator functionality on July 12, 2021
- (2) Emergency feedwater initiation and control channel C operability on August 11, 2021
- (3) Unit 2 emergency diesel generator access door functionality on August 12, 2021
- (4) Unit 2 engineered safety features vault access doors 203, 204, and 206 functionality on September 14, 2021
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following permanent modification:
- (1) Unit 2 turbine control system upgrades for main turbine digital electrohydraulic control on September 28, 2021
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) Common unit alternate ac diesel generator following maintenance on the mechanical governor on June 24, 2021
- (2) Unit 2 plant protection system following the replacement of a failed circuit card on July 2, 2021
- (3) Unit 1 high-pressure injection pump P-36A pressure switches following maintenance on July 8, 2021
- (4) Unit 2 boric acid makeup pump 2P-39B following maintenance on July 12, 2021
- (5) Unit 1 P-34A decay heat removal/low-pressure injection pump suction temperature instrument following maintenance on July 14, 2021
- (6) Unit 1 emergency diesel generator ventilation exhaust fans following maintenance on July 16, 2021
- (7) Unit 1 motor-driven emergency feedwater pump P-7B following maintenance on August 4, 2021
- (8) Unit 1 low pressure injection/decay heat removal pump P-34B following maintenance on August 9, 2021
- (9) Common feedwater pump P-805A following maintenance on September 10, 2021
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)
(1)
(Partial)
The inspectors evaluated Unit 2 Refueling Outage 2R28 activities from September 24, 2021, to September 30, 2021. The inspectors completed inspection procedure Sections 03.01.a, 03.01.b, and 03.01.c.1 through 10.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
- (1) Unit 1 emergency diesel generator A overspeed trip testing on August 27, 2021
- (2) Unit 1 containment flood instrumentation calibration on September 21, 2021
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Unit 1 emergency feedwater pump B valve stroke testing on September 30, 2021
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The licensee submitted a summary of emergency plan changes (Alert and Notification System Design Report, Revision 4, ADAMS Accession Nos. ML21127A160 and ML21127A166) to the NRC on April 28, 2021. The inspectors conducted a review of the changes from July 1 to July 15, 2021. This evaluation does not constitute NRC approval.
RADIATION SAFETY
71124.02 - Occupational ALARA Planning and Controls
Radiological Work Planning (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensees radiological work planning. The inspectors reviewed plans for the following activities:
- (1) Radiation Work Permit (RWP) No. 2020-2900, emergent minor maintenance activities during Refueling Outage 2R27
- (2) RWP No. 2020-2470, phased array ultrasonic testing inspections of Alloy 600 welds during Refueling Outage 2R27
- (3) RWP No. 2020-1413, Refueling Outage 1R29 reactor building coordinator activities
- (4) RWP No. 2019-1413, reactor building coordinator activities during Refueling Outage 1R28
- (5) RWP No. 2019-1501, Refueling Outage 1R28 replace service water piping VCC-2 C/D to include locations in both auxiliary and reactor buildings Verification of Dose Estimates and Exposure Tracking Systems (IP Section 03.02) (4 Samples)
The inspectors evaluated dose estimates and exposure tracking. The inspectors reviewed the following as low as reasonably achievable planning documents:
- (2) RWP No. 2019-1430, reactor disassembly, re-assembly, and support activities during Refueling Outage 1R28
- (3) RWP No. 2020-2420, scaffold installation / removal (non-locked high radiation areas)during Refueling Outage 2R27
- (4) RWP No. 2019-1900, emergent scope maintenance activities during Refueling Outage 1R28
71124.04 - Occupational Dose Assessment
Source Term Characterization (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.
External Dosimetry (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated licensee performance as it pertains to external dosimetry that is used to assign occupational dose.
Internal Dosimetry (IP Section 03.03) (3 Samples)
The inspectors evaluated the internal dosimetry program implementation. The inspectors reviewed the following whole body counts for:
- (1) Follow-up from personnel contamination event 2019-011 on October 12, 2019
- (2) Follow-up from personnel contamination event 2020-021 on April 17, 2020
- (3) Follow-up from personnel contamination event 2020-017 on April 9, 2020
Special Dosimetric Situations (IP Section 03.04) (2 Samples)
Licensees implementation of requirements to manage:
- (1) Radiation protection of declared pregnant workers for three workers
- (2) Application of NRC-approved external dosimetry methods (i.e., effective dose from external sources) for three workers
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05)===
- (1) Unit 1 (July 1, 2020, through June 30, 2021)
- (2) Unit 2 (July 1, 2020, through June 30, 2021)
MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)
- (1) Unit 1 (July 1, 2020, through June 30, 2021)
- (2) Unit 2 (July 1, 2020, through June 30, 2021)
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
- (1) Unit 1 (July 1, 2020, through June 30, 2021)
- (2) Unit 2 (July 1, 2020, through June 30, 2021)
71152 - Problem Identification and Resolution
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for site activities for equipment that is obsolete and in short supply that might be indicative of a more significant safety issue.
Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Unit 1 decay heat removal suction temperature instrumentation unreliability on July 16, 2021
- (2) Evaluation of corrective action effectiveness for issues identified during and after the cyber security full implementation inspection completed on October 22, 2018 (documented in security-related report at ADAMS Accession No. ML18295A327).
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On July 15, 2021, the inspectors presented the emergency plan revision in-office review inspection results to Mr. J. Toben, Manager, Emergency Preparedness, and other members of the licensee staff.
On August 5, 2021, the inspectors presented the ANO Unit 1 biennial requalification inspection results to Mr. K. Ashander, Training Superintendent, and other members of the licensee staff.
On August 30, 2021, the inspectors presented the cyber security problem identification and resolution findings effectiveness evaluation inspection results to Mr. J. Stroud, IT-OT Manager, and other members of the licensee staff.
On September 2, 2021, the inspectors presented the occupational radiation safety inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.
On October 14, 2021, the inspectors presented the integrated inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-ANO-
2-2020-02266, 2-2021-00466, 2-2021-01255, 2-2021-01684,
2-2021-01686, 2-2021-01689
M-204, Sheet 3
Emergency Feedwater
M-2232, Sheet 1
Safety Injection System
2
Drawings
M-232, Sheet 1
Decay Heat Removal System
110
Miscellaneous
ULD-0-SYS-19
Alternate AC Generator System (AAC)
Protected Equipment Postings
OP-1104.000
Decay Heat Removal Operating Procedure
135
OP-1106.006
Emergency Feedwater Pump Operation
116
OP-2104.037
Alternate AC Diesel Generator Operations
Procedures
OP-2104.039
HPSI System Operation
Work Orders
Corrective Action
Documents
CR-ANO-
2-2021-01192, 2-2021-01298
FP-2101, Sheet 1
Fire Zones Fuel Handling Floor Plan Elev. 404-0 and 422-
FP-2103, Sheet 1
Fires Zones Intermediate Floor Plan Elev. 368-0 and 372-
Drawings
FZ-2049, Sheet 1
Fire Zone Detail MCC and Corridor
FP-103, Sheet 1
Fire Zones Intermediate Floor Plan Elev. 368-0 and 372-0
FP-2106, Sheet 1
Fire Zone Plan Elev. 317-0
Unit 2 PreFire Plan
Fire Zone 2109-U Diesel Generator Room Access and Motor
Control Center
Unit 2 PreFire Plan
Fire Zone 2098-L Cable Spreading Room
Fire Plans
Unit 2 PreFire Plan
Fire Zone 2155-A Steam Pipe Area
Miscellaneous
Fire Hazards
Analysis
Fire Zone 2109-U (Corridor)
Procedures
OP-2307.012
Unit 2 Fire Detection Instrumentation Operability
Work Orders
CALC-83-E-0063-
North Diesel Generator Room Elev. 368 2094-Q Ponding
Evaluation
Calculations
CALC-ANOC-CS-
ANO Flood Protection Room Evaluations - Units 1 and 2
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
15-00012
Fire Plans
FP-2103, Sheet 1
Intermediate Floor Plan Elev. 368-0 and 372-0
Simulator Scenarios 1 & 2 for Week 5
21 Op
Test
Week 4 and Week 5 JPMs
21 Op test
Medical Files for Six Operators
21 BRQ
Miscellaneous
21 Requalification Written Exam Week 2 and 3
21 Written
Exam
DG-TRNA-015-
EXAMSEC
Simulator Exam Security Guidelines
Procedures
Simulator Configuration Control
Corrective Action
Documents
CR-ANO-
C-2021-02265
Miscellaneous
A1SPGLOPBO2201
Cycle 2201 Blackout
OP-1102.004
Power Operation
OP-1103.004
Soluble Poison Concentration Control
OP-1105.004
Integrated Control System
Procedures
OP-1203.045
Rapid Plant Shutdown
Corrective Action
Documents
CR-ANO-
2-2015-03444, 2-2020-01706, 2-2020-01743, 2-2020-01782,
2-2021-01492, 2-2021-01643, 2-2021-01929
Reduced Latching Requirements for Watertight Doors
2/20/2016
Engineering
Changes
Remove Any 5-minute HELB Door Allowances
11/24/2015
Miscellaneous
ER-ANO-2002-
1050-000
Shift Engineer Guidance for ESF Doors at Elevation 317 for
Units 1 and 2
09/16/2002
OP-1402.100
Watertight Door Maintenance
Procedures
OP-2306.025
Unit 2 Fire Door Inspection Procedure 71111.12
Work Orders
Corrective Action
Documents
CR-ANO-
1-2021-02017, 1-2021-02078, 1-2021-02659, 2-2021-01805,
C-2021-02137
1015.048
Shutdown Operations Protection Plan
2103.011
Draining the Reactor Coolant System
2105.013
COLSS Operations
Procedures
Shutdown RCS Makeup
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CFSG-005
Initial Assessment and FLEX Equipment Staging
Protected Equipment Postings
Online Risk Assessment
FDS-006
Unit 2 Lower Mode ELAP Guideline
CALC-15-E-0007-
Reduced Latching Requirements for Watertight Door
CALC-83-E-0063-
North Diesel Generator Room, Elev. 368 2094-Q Ponding
Evaluation
CALC-92-R-1023-
EFIC Qualification Report No. 3801-1310 Addendum No. AB
PC-1
Calculations
CALC-ANOC-CS-
15.00012
ANO Flood Protection Room Evaluations - Unit 1 & 2
Corrective Action
Documents
CR-ANO-
1-2021-02572, 2-2017-05766, 2-2020-02632, 2-2021-01343,
2-2021-01362, 2-2021-01481, 2-2021-01522, 2-2021-01524,
2-2021-01551, 2-2021-01572, 2-2021-01645, 2-2021-01805,
C-2013-00331, C-2021-01683
Drawings
FP-2103, Sheet 1
Fire Zones Intermediate Floor Plan El 368-0 and 372-0
Reduced Latching Requirements for Watertight Doors
Remove Unit 2 Door 260
Engineering
Changes
AAC Functionality Input for Governor Control
06/28/2021
Unit 2 Safety Analysis Report
STM 1-66
Emergency Feedwater Initiation and Control
ULD-0-SYS-19
Alternate AC Generator System (AAC)
Miscellaneous
ULD-1-SYS-08
Emergency Feed Water Initiation and Control System
1402.100
Watertight Door Maintenance
Operability Determination Process
Procedures
OP-1105.005
Emergency Feedwater Initiation and Control
Work Orders
Engineering
Changes
Turbine Control System Upgrades for Main Turbine (MT) and
Feedwater Pump Turbine (FPT) Digital Electrohydraulic
Control (DEHC)
Miscellaneous
ANO-2 Technical Requirements Manual
Procedures
Process Applicability Determination
29, 30
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CFR 50.59 Evaluations
Corrective Action
Documents
CR-ANO-
1-2016-04501, 1-2017-02571, 1-2018-02540, 1-2018-02552,
1-2018-02816, 1-2020-01391, 1-2020-02000, 1-2021-00744,
1-2021-02567, 2-2021-01080, 2-2021-01082, 2-2021-01131,
2-2021-01683, 2-2021-01684, C-2013-00331, C-2013-
00332, C-2021-01565, C-2021-01635, C-2021-01687, C-
21-01688, C-2021-01689, C-2021-01690, C-2021-01749,
M-204, Sheet 3
Emergency Feedwater
Drawings
M-232, Sheet 1
Decay Heat Removal System
110
DCP 84-1045
Decay Heat Suction and CST Level Gauge
2/10/1986
TD B045.0500
Product Instructions Temperature Transmitter Type KT13
Miscellaneous
ULD-1-SYS-04
ANO Unit 1 Decay Heat Removal/Low Pressure Injection
System
OP-1102.010
Plant Shutdown and Cooldown
OP-1104.002
Makeup & Purification System Operation
OP-1104.004
Decay Heat Removal Operating Procedure
135
OP-1106.006
Emergency Feedwater Pump Operation
116
OP-1106.007
Common Feedwater Operation
OP-1203.012H
Annunciator K09 Corrective Action
OP-1203.028
Loss of Decay Heat Removal
OP-2104.003
Chemical Addition
OP-2104.037
Alternate AC Diesel Generator Operations
36, 37
Procedures
OP-2304.040
Unit 2 Plant Protection System Channel D Test
Work Orders
WO 467228, 560604, 564880, 52868953, 52901649, 52928746,
2938556, 52945824
Miscellaneous
2R28 Outage Risk Assessment Team Report
09/08/2021
OP-1010.048
Shutdown Operations Protection Plan
OP-2102.004
Power Operation
OP-2102.010
Plant Cooldown
Procedures
OP-2103.011
Draining the Reactor Coolant System
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-ANO-
1-2018-02099, 1-2018-04543
Miscellaneous
TD G050.0100
Installation, Operation and Maintenance Manual for GEMS
Tank Level Indicating Systems
01/18/1988
CPG-001
ANO Procedure Writers Guide
Human Performance Traps and Tool
Procedure and Work Instruction Use and Adherence
OP-1104.036
Emergency Diesel Generator Operation
OP-1106.006
Emergency Feedwater Pump Operation
116
Procedures
OP-1304.199
Unit 1 Containment Flood Level Calibration
Work Orders
WO 2918837, 52919720, 52946973
Corrective Action
Documents
CR-ANO-
C-2019-03621, C-2021-01170
Corrective Action
Documents
Resulting from
Inspection
CR-ANO-
C-2021-01855
Arkansas Nuclear One Emergency Plan
Design Report Update, Upgraded Public Alert and
Notification System (ANS), Arkansas Nuclear One (ANO)
05/01/2018
Design Report Update, Upgraded Alert and Notification
System (ANS), Arkansas Nuclear One (ANO), Supplement 1
2/01/2017
0CAN042104
Emergency Plan and Alert and Notification System (ANS)
Design Report, Arkansas Nuclear One, Units 1 and 2; NRC
Docket Nos. 50-313, 50-368, and 72-13; Renewed Facility
Operating License Nos. DPR-51 and NPF-6
04/28/2021
Miscellaneous
CFR 50.54(q)(3)
Screening Form
Alert and Notification System (ANS) Design Report,
Revision 4
04/22/2021
Procedures
Emergency Planning 10 CFR 50.54(q) Review Program
Arkansas Nuclear One Full 5-Year Exposure Reduction Plan
20-2024
2/03/2019
ALARA Plans
Arkansas Nuclear One Full 5-Year Exposure Reduction Plan
21-2025
2/18/2020
Corrective Action
CR-ANO-
1-2019-02955, 1-2019-03804, 1-2019-03867, 1-2020-01369,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
1-2020-00682, 1-2020-00818, 1-2021-01946, 2-2019-02316,
2-2020-03260, 2-2021-01035, C-2019-03958, C-2020-
03095, C-2020-00971, C-2020-00978, C-2021-01244
EN-FAP-RP-005
Radiation Protection Five-Year Exposure Reduction
Planning
EN-FAP-RP-012
Temporary Shielding
Radiological Work Permits
ALARA Program
EN-RP-110-01
ALARA Initiative Deferrals
EN-RP-110-03
Collective Radiation Exposure (CRE) Reduction Guidelines
EN-RP-110-04
Radiation Protection Risk Assessment Process
EN-RP-110-06
Outage Dose Estimating and Tracking
Procedures
Job Coverage
RWP 2019-1413
Reactor Building Coordinator Activities during 1R28
RWP 2019-1430
Reactor Disassembly, Re-assembly, and Support Activities
during 1R28
RWP 2019-1501
Replace Service Water Piping VCC-2 C/D to Include
Locations in both Auxiliary and Reactor Building
RWP 2019-1900
Emergent Scope Maintenance Activities during 1R28
RWP 2020-1413
1R29 Reactor Building Coordinator Activities
RWP 2020-2420
Scaffold Installation/Removal non-LHRAs during 2R27
RWP 2020-2430
2R27 Reactor Disassembly/Reassembly (includes support
activities)
RWP 2020-2470
Phased Array U.T. (PAUT) Inspections of Alloy 600 welds
during 2R27
RWP 2020-2900
Emergent Minor Maintenance Activities during 2R27
Radiation Work
Permits (RWPs)
RWP 2021-1054
Unit 2 Transfer Spent Resin to T-13 or 2T-13 Spent Resin
Storage Tanks
1R29 Post Outage Report
1R28 Post Outage ALARA Report
2R27 ALARA Report
Self-Assessments
LO-ALO-2021-
00002
Radiation Safety - ALARA & Dose Assessment
05/24/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
NQ-2019-028
Quality Assurance Audit Report QA-14/15-2019-ANO-1-
Radiation Protection/Radwaste
21 FastScan 1
Calibration of the "FastScan 1" Whole Body Counting
System at the Entergy Arkansas Nuclear One Station
05/04/2021
Calibration
Records
21 FastScan 2
Calibration of the "FastScan 2" Whole Body Counting
System at the Entergy Arkansas Nuclear One Station
05/05/2021
Corrective Action
Documents
CR-ANO-
1-2019-02553, 1-2019-02975, 1-2019-03317, 1-2021-01954,
C-2019-01745, C-2019-03941, C-2019-04003, C-2019-
04173, C-2020-00467, C-2020-00516, C-2020-00520, C-
20-00761, C-2020-00762, C-2020-01357, C-2020-01365,
C-2020-01463, C-2020-01811, C-2020-02006, C-2020-
2142, C-2020-02313, C-2020-02314, C-2020-03095, C-
20-03274, C-2020-03326, C-2021-01139, C-2021-01732
Evaluation of the Canberra GEM-5 for use as a
Passive Monitor at Arkansas Nuclear One
07/26/2011
100518-0
National Voluntary Laboratory Accreditation Program
Certificate for Landauer, Inc.
01/01/2021
2015 Report
Arkansas Nuclear One:
Neutron Radiation Assessment Report
04/11/2016
20 DAW
CFR Part 61 Waste Stream Analysis
04/04/2020
3.23 Dosimeter of
Legal Record (DLR)
Generic Radiation Worker Training Lesson Plan
20 INPO
2018 Neutron Dose Assignment Protocol
2/19/2018
2018 Radiation Energy Distribution Evaluation
2/12/2018
2019 Neutron Dose Assignment Protocol
11/12/2019
20 Power Entry Neutron Dose Assessment Guidance
2/19/2020
ANO-RPT-21-001
R0
Arkansas Nuclear One Alpha / Plant Characterization Data
05/25/2021
DLR: 200325
Dosimetry Investigation Report for DLR/SRD Difference
08/20/2020
DLR: 201093
Dosimetry Investigation Report for DLR/SRD Difference
08/20/2020
DLR: 212668
Dosimetry Investigation Report for DLR/SRD Difference
06/30/2021
DLR: 212962
Dosimetry Investigation Report for DLR/SRD Difference
06/30/2021
DLR: 213466
Dosimetry Investigation Report for DLR/SRD Difference
06/30/2021
Miscellaneous
LO-ALO-2020-
Industry Benchmark on Source Term Reduction Strategies
2/15/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
00067
for Like Reactors
Radiation Worker Expectations
Radiological Diving
Dosimetry Administration
Personnel Monitoring
Dose Assessment
Special Monitoring Requirements
EN-RP-204-01
Effective Dose Equivalent (EDEX) Monitoring
Prenatal Monitoring
Whole Body Counting / In-Vitro Bioassay
Procedures
Passive Monitor Sensitivity Testing
RCS Miscellaneous Dose Rates for Units 1 and 2
08/31/2021
2019-0521-1
Personnel Contamination Events Log
Event No. 2019-001 through 2019-029
04/20/2020
20-0408
Personnel Contamination Events Log
Event No. 2020-001 through 2020-015
04/08/2020
20-0408-1
Personnel Contamination Events Log
Event No. 2020-016 through 2020-020
04/20/2020
20-0417
Personnel Contamination Events Log
Event No. 2020-021 through 2020-025
04/09/2021
21-0302
Personnel Contamination Events Log
Event No. 2021-001 through 2020-005
04/19/2021
21-02026
ANO Beta and Tritium Report - Unit 1 Spent Fuel Pool
Tritium Analysis
03/14/2021
21-02277
ANO Beta and Tritium Report - Unit 1 Spent Fuel Pool
Tritium Analysis
03/21/2021
Central Support Building 1st Floor
09/14/2019
Radiation
Surveys
ANO-20-09-00360
Central Support Building 1st Floor
09/22/2020
RWP 20211003
Unit-1 Chemistry Activities
Radiation Work
Permits (RWPs)
RWP 20212003
Unit-2 Chemistry Activities
EN-RPT-20-005 R0
Annual Review of Dosimetry Results in the Entergy Fleet
Based on 2019 Dosimetry Results
11/04/2020
Self-Assessments
LO-ALO-2021-
Radiation Safety - ALARA & Dose Assessment
05/24/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
00002
NQ-2019-028
QA Audit Report QA-14/15-2019-ANO-1, 2019 QA Audit of
Radiation
Protection/Radwaste at Arkansas Nuclear One (ANO)
10/24/2019
Corrective Action
Documents
CR-ANO-
C-2021-00788
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency AC Power
Q1-2021
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency AC Power
Q2-2021
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - High Pressure Safety Injection
Q3-2020
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - High Pressure Safety Injection
Q4-2020
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - High Pressure Safety Injection
Q1-2021
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - High Pressure Safety Injection
Q2-2021
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency Feedwater
Q3-2020
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency Feedwater
Q4-2020
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency Feedwater
Q1-2021
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency Feedwater
Q2-2021
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency AC Power
Q3-2020
Miscellaneous
ANO-1 and ANO-2 NRC Performance Indicator
Technique/Data Sheets - Emergency AC Power
Q4-2020
Emergency Diesel Generator Reliability Program
71151
Procedures
Regulatory Performance Indicator Process
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CR-ANO-
1-2018-02540, 1-2018-02552, 1-2018-02816, 1-2020-02000,
1-2021-0744, C-2015-02278
CR-ANO-
2-2018-01508, 2-2020-03712, C-2018-03066, C-2018-
03070, C-2018-04348, C-2020-03306, C-2021-00218,
Corrective Action
Documents
CR-HQN-
2018-00805, 2018-01610
Diagram - ANO Level 4 Security
03/30/2018
Drawings
ANO Security L4 Current Network Diagram v1
Technical Controls 08-09 Assessment Master Template
5.18
Whitepaper - Conversion to WizNucleus's CyberWiz-Pro
Application
08/24/2021
Miscellaneous
Status Update: Obsolescence
06/2021
Procedures
EN-FAP-MP-008
Processing Obsolete Items Identified During the
Procurement Process
Self-Assessments LO-ALO-2021-
00033
Cyber Security Pre-NRC Cyber PI&R Inspection Assessment
05/20/2021