October 10, 2023

SUBJECT:

ARKANSAS NUCLEAR ONE - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000313/2023011 AND 05000368/2023011

Dear Doug Pehrson:

On September 28, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One and discussed the results of this inspection with Brad Wertz, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000313, 05000368 License Nos. DPR-51, NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000313 and 05000368

License Numbers:

DPR-51 and NPF-6

Report Numbers:

05000313/2023011 and 05000368/2023011

Enterprise Identifier:

I-2023-011-0007

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One

Location:

Russellville, AR

Inspection Dates:

September 11, 2023 to September 28, 2023

Inspectors:

J. Braisted, Senior Reactor Inspector

D. Bryen, Reactor Inspector

F. Thomas, Reactor Inspector

Approved By:

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a commercial grade dedication inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication (section 03.01)

The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components or for procuring safety-related structures, systems, and components for the samples associated with the following purchase orders (POs):

(1) PO 217910, SWITCH, TEMPERATURE, 115/230V, 57.5VA DC, 90-200DEG F
(2) PO 896590, RELAY, ROTARY, 10A, 28VDC COIL, 16PDT, FORM C, SCREW TERM, PANEL
(3) PO 10196872, REGULATOR, PRESSURE, AIR, 250 PSI MAX, 44 PSIG, 1/4" FNPT
(4) PO 10240176, FUSE, CURRENT LIMITING, 3A, 600V
(5) PO 10242798, CAPACITOR, TANTALUM, ELECTROLYTIC, 22UF, 75WVDC, +/-

10% TOL

(6) PO 10250272, POWER SUPPLY, 60 WATT, 0-24VDC, 0.7AMP
(7) PO 10390012, LUBRICANT, GREASE, SYNTHETIC, 13.7 OZ TUBES, MOBILGREASE 28
(8) PO 10460831, DIAPHRAGM, DAMPER OPERATOR, 4-3/4" X 4-3/4" X 4-3/4",

SILICONE

(9) PO 10520638, BOARD, PRINTED CIRCUIT, AMPLIFIER, "N0037" OPTION FOR DAMPING ELECTRONICS
(10) PO 10546009, HOLDER, FUSE, 15A
(11) PO 10557698, BELT, V, 62" OC LG, 21/32" TOP WIDTH, 13/32" THK, HEAVY DUTY, HI-POWER
(12) PO 10562074, VALVE, SOLENOID, 3/8" FNPT PIPE, 120VDC, 10.6W, BRASS BODY, 3-WAY QUICK EXHAUST
(13) PO 10621451, LUBRICANT, GREASE, CHEVRON SRI GREASE 2, TUBE
(14) PO 10679582, MOTOR, VALVE ACTUATOR, 5.3HP, FRAME 180TY, 460V, 3 PH, 7.5A, 3470 RPM
(15) PO 10685862, FUEL, DIESEL, ULTRA-LOW SULFUR, BULK

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 28, 2023, the inspectors presented the commercial grade dedication inspection results to Brad Wertz, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Condition Report

(CR-ANO-1-)

2017-00241, 2020-00044, 2020-00615, 2022-02356

Condition Report

(CR-ANO-2-)

2018-01746, 2022-01713, 2021-00728

Condition Report

(CR-ANO-C-)

22-02818, 2022-02942, 2022-02943, 2022-02993, 2022-

2995, 2022-02996, 2023-01562, 2023-01583, 2020-02830,

20-02843, 2018-02822, 2018-04391, 2020-02483, 2020-

2685, 2022-02338

Corrective Action

Documents

Condition Report

(CR-HQN-)

22-01793, 2022-01897, 2020-01124

Condition Report

(CR-ANO-1-)

23-01328, 2023-01290, 2023-01291, 2023-01292, 2023-

293, 2023-01294

Condition Report

(CR-ANO-C-)

23-03070, 2023-03372, 2023-03373, 2023-03374, 2023-

03375, 2023-03376, 2022-03377, 2023-03378, 2023-03379,

23-03380

Corrective Action

Documents

Resulting from

Inspection

Document

Revision Notice

(DRN-HQN-)

23-03178

E-7, Sheet 1

Single Line Meter & Relay Diagram, 480 Volt Load Centers,

Main Supply

Drawings

M-423, Sheet 2

Functional Description & Logic Diagram Auxiliary Building

Vent & Air Conditioning

EC 02684

Evaluation For Use of Ultra Low Sulfur Diesel Fuel Oil for

Use in Unit 1 and Unit 2 EDG, Alternate AC Diesel, and

Misc. Site Diesel Fueled Engines

000

EC 70648

Adding Damping Electronics to PDT-1401

000

EC 87418

Rosemount Part 21 ANO EQ Program Implementation

000

Engineering

Changes

EC 93048

1R30 Unit 1 Magnesium Rotor Motor Replacement - CV-

28

000

71111.21N.03

Miscellaneous

Quality Assurance Program Manual

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CALC-20-EQ-

0001-01

Rosemount Transmitter Part 21 Qualified Life and Accident

Heat Rise Calculation

CGI Package

(CG-)

2-011, 96-0010, 97-0054, 01-0005

EQ Data Record

Summary Sheet

(EQ-DRSS-)

2A085, B084

Over, Short,

Damaged, and

Discrepant

(OSDD-ANO-)

0036336, 0038223

Procurement

Engineering

Evaluation (PE-

ANO-)

00151650, 00186105, 00201232, 00206806, 00151542,

00017770, 00181470, 00170408, 00141336, 00207440,

00197821, 00208247, 00174333, 00223405, 00220614,

00129385, 00133073, 00143754, 00220991

Procurement

Engineering

Evaluation (PE-

ECH-)

00082526

Purchase Order

(PO-ANO-)

10557698, 10546009, 10621451, 10460831, 10196872,

10390012, 10242798, 10250272, 00217910, 10562074,

10520638, 10685862, 10240176, 10679582, 00896590

QC Inspection

(QC-ANO-)

00073728, 77929100, 06650200, 00084404, 00024582,

00074801, 19241200, 00029950, 00044901, 00036435,

00067160, 00097330, 00046898, 00095271, 00096165

TD P321.0160

6x4 POWERSTROKE MOTOR

EN-CY-122

Diesel Fuel Oil Program

008

EN-DC-108

Commercial Grade Dedication Lab Conduct of Operation

EN-DC-115

Engineering Change Process

034

EN-DC-306

Acceptance of Commercial-Grade Items/Services in Safety-

Related Applications

EN-DC-313

Procurement Engineering Process

EN-DC-313-01

Industry Standard Item Equivalency Process (NISP-EN-02)

Procedures

EN-MA-105

Control of Measuring and Test Equipment (M&TE)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EN-MP-112

Shelf Life Program

7, 11

EN-MP-120

Material Receipt

Self-Assessments Condition Report

(LO-HQNLO-)

22-00086, 2022-00108

Work Orders

Work Order (WO-

ANO-)

00538361, 00505776, 00562058, 00432437, 52995300,

2873681, 00533764, 00519379, 52836901, 00560113,

00471930, 52938766, 52988499, 52745398