ML22047A270
| ML22047A270 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/23/2022 |
| From: | Ray Kellar Division of Reactor Safety IV |
| To: | Sullivan J Entergy Operations |
| References | |
| IR 2022403 | |
| Download: ML22047A270 (8) | |
See also: IR 05000313/2022403
Text
February 23, 2022
Mr. Joseph Sullivan
Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
N-TSB-58
1448 S.R. 333
Russellville, AR 72802-0967
SUBJECT:
ARKANSAS NUCLEAR ONE, Units 1 and 2 - SECURITY BASELINE
INSPECTION REPORT 05000313/2022403 AND 05000368/2022403
Dear Mr. Sullivan:
On January 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at Arkansas Nuclear One, and the NRC inspectors discussed the results of this inspection with
you and other members of your staff. The results of this inspection are documented in the
enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
Ray L. Kellar, P.E., Chief
Plant Support Branch 1
Division of Reactor Safety
Docket Nos.: 05000313 and 05000368
License Nos.: DPR-51 and NPF-6
Enclosure:
Inspection Report 2022403
cc w/encl: Distribution via Listserv
Signed by Kellar, Ray
on 02/23/22
X SUNSI Review
By: RLK
ADAMS:
X Yes No
Sensitive
X Non-Sensitive
Non-Publicly Available
X Publicly Available
Keyword
OFFICE
PSB1
PSB1
C: PSB1
C:DRPD
C: PSB1
NAME
JBuchanan
WTejada
RKellar
AAgrawal
RKellar
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
2/17/2022
2/17/2022
2/16/2022
2/16/2022
2/23/2022
Enclosure
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Numbers:
05000313 and 05000368
License Numbers:
Report Numbers:
05000313/2022403 and 05000368/2022403
Enterprise Identifier:
I-2022-403-0002
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear one
Location:
Russellville, Arkansas
Inspection Dates:
January 24, 2022 to January 27, 2022
Inspectors:
J. Buchanan, Physical Security Inspector
W. Tejada, Physical Security Inspector
Approved By:
Ray L. Kellar, Chief
Plant Support Branch 1
Division of Reactor Safety
2
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting a security baseline inspection at Arkansas Nuclear one, in
accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs
program for overseeing the safe operation of commercial nuclear power reactors. Refer to
https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
3
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for
Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and
records, observed activities, and interviewed personnel to assess licensee performance and
compliance with Commission rules and regulations, license conditions, site procedures, and
standards.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following
procedure elements:
Protective Strategy Evaluation (2 Samples)
(1)
Tier I: All Requirements
Tier II: All Requirements
Tier III: All Requirements
(2)
Performance Evaluation Program: Inspectors observed a licensee-conducted annual
force-on-force exercise on January 25, 2022.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On January 27, 2022, the inspectors presented the security baseline inspection results
to you and other members of your staff.
4
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
ANO-C-2019-
01290,
ANO-C-2019-
01292,
ANO-C-2019-
01316,
ANO-C-2020-
00002,
ANO-C-2020-
00323,
ANO-C-2020-
00398,
ANO-C-2020-
00473,
ANO-C-2021-
00148,
ANO-C-2021-
00158,
ANO-C-2021-
00272,
ANO-C-2021-
00310,
ANO-C-2021-
00311,
ANO-C-2021-
02251,
ANO-C-2021-
02552, AND
ANO-C-2021-
03108
Corrective Action
ANO-C-2022-
5
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Resulting from
Inspection
00213,
ANO-C-2022-
00214,
ANO-C-2022-
00215,
ANO-C-2022-
00216,
ANO-C-2022-
00217,
ANO-C-2022-
00218,
ANO-C-2022-
00219,
ANO-C-2022-
00236,
ANO-C-2022-
00227,
ANO-C-2022-
00230, AND
ANO-C-2022-
00241
Letter of Agreement, Pope County Sheriff
12/21/2021
Physical Security Plan, Safeguards Contingency and
Training & Qualification Plan
19
2021-03108
Security Incident Report
2021-0407
Security Incident Report
ASLP-SEC-IMP-
SECPTRL
IMP/Security Patrols
ASLP-SEC-
TAMPSAB-02
Tampering and Sabotage
2
FLP-JCAF-
ADVBM
Adversary Basic Marksmanship
2
Miscellaneous
FLP-SEC-
ADVCTRL
Force-on-Force Adversary Controller Training
2
6
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
FLP-SECI-
DRILEX
Force-on-Force Controller Training
5
Remotely Operated Weapons Systems (ROWS) Operation
and Maintenance
0
Conduct of Security Force Exercises and Drills
21
EN-NS-215-02
Annual Force-on-Force
0
EN-NS-215-03
Triennial Force-on-Force
0
Managing the Safety/Security Interface
5
General Security Strategies
1
Force-on-Force Mock Adversary Program
3
OP-1000.019
Station Security Requirements
52
OP-1043.002
Access Control
95
OP-1043.003
ANO-Specific Security Responsibilities and Duties
62
OP-1043.014
Patrols and Inspections
46
OP.1043.004
Compensatory Measures for Security System Component
Outages
49
OP.1043.042
Response to Contingencies
22
OP.1043.047
Defensive Strategy
28
OP.1043.048
Law Enforcement Response Plan
4
Procedures
OP.1043.049
Target Sets
12