IR 05000313/2021401
| ML21216A117 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear (DPR-051, NPF-006) |
| Issue date: | 08/10/2021 |
| From: | Ray Kellar Division of Reactor Safety IV |
| To: | Dinelli J Entergy Operations |
| References | |
| IR 2021401 | |
| Download: ML21216A117 (6) | |
Text
SUBJECT:
ARKANSAS NUCLEAR ONE - SECURITY BASELINE INSPECTION REPORT 05000313/2021401 AND 05000368/2021401
Dear Mr. Dinelli:
On July 22, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear one and discussed the results of this inspection with Mr. Joe Sullivan, General Manager Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000313 and 05000368
License Numbers:
Report Numbers:
05000313/2021401 and 05000368/2021401
Enterprise Identifier:
I-2021-401-0004
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear one
Location:
Russellville, Arkansas
Inspection Dates:
July 19, 2021 to July 22, 2021
Inspectors:
D. Holman, Sr Physical Security Inspector
Approved By:
Ray L. Kellar, Chief
Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Arkansas Nuclear one, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.08 - Fitness For Duty Program
The inspectors evaluated the fitness for duty program by completing the following inspection
elements: Fitness For Duty Program
- (1) Tier I: All Requirements
Tier II: 27 Requirements [all but 02.09 c-d]
Tier III: 6 Requirements [ all but 02.13 d, 02.14 a-c]
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On July 22, 2021, the inspectors presented the security baseline inspection results to Mr. Joe Sullivan, General Manager, Plant Operations and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Report
ANO-C-2019-01953, ANO-C-2019-03780
Corrective Action
Documents
Resulting from
Inspection
Condition Report
ANO-C-2019-01928; ANO-C-2021-01929
FF-000
Entergy's Nuclear Fitness for Duty Program Statement of
Policy
Miscellaneous
Nuclear Power Plant Access Authorization Program
EN-NS-101-01
AA/FFD Facility Controls
Fitness for Duty Program
EN-NS-102-01
Fitness for Duty Random Testing Selection and Notification
and 01
EN-NS-102-02
Fitness for Duty Specimen Collection and Shipment
EN-NS-102-03
Processing of Fitness for Duty Test Results
Procedures
In and Out Processing
06