September 14, 2020

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000313/2020410 AND 05000368/2020410

Dear Mr. Dinelli:

On August 6, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000313 and 05000368

License Numbers:

DPR-51 and NPF-6

Report Numbers:

05000313/2020410 and 05000368/2020410

Enterprise Identifier: I-2020-410-0000

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One, Units 1 and 2

Location:

Russellville, AR

Inspection Dates:

August 3, 2020 to August 6, 2020

Inspectors:

M. Chambers, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Arkansas Nuclear One,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the minimum inspection elements due to the COVID-19 pandemic:

Access Control (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: Requirements [02.06 a, b, and d]
  • Tier III: Requirement [02.10 a]

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the implementation of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)

(October 2019-August 2020)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 6, 2020, the inspectors presented the security baseline inspection results to Mr. John Dinelli, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

CR-ANO-C-2020-

01158

On-Duty Security Officers Failure to Maintain Required

Equipment

4/13/2020

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-C-2020-

2171

Observation on train/cask search process

08/05/2020

CR-ANO-C-2020-

2172

Security PI Data recording/verification process observation

08/05/2020

Procedures

1043.002

Access Control

EN-NS-224

SOCA Access Controls

EN-NS-231

Protected Area Search

EN-NS-232

General Employee Security Responsibilities

OP-1000.019

Station Security Requirements

OP-1043.003

Guard Screening, Responsibilities, and Duties

71130.09

Miscellaneous

Security Plan

2018

71151

Miscellaneous

4th Quarter 2019 Security Compensatory Measures

Oct, Nov,

Dec 2019

1st Quarter Security Compensatory Measures 2020

Jan, Feb,

Mar 2020