IR 05000313/2023003

From kanterella
Jump to navigation Jump to search
Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001
ML23324A212
Person / Time
Site: Arkansas Nuclear  
Issue date: 11/21/2023
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Pehrson D
Entergy Operations
References
IR 2023003
Download: ML23324A212 (39)


Text

November 21, 2023

SUBJECT:

ARKANSAS NUCLEAR ONE - REVISED INTEGRATED INSPECTION REPORT 05000313/2023003 AND 05000368/2023003 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07200013/2023001

Dear Doug Pehrson:

On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One. The results of this inspection were originally issued in a report, dated November 13, 2023 (Agencywide Document Access and Management Systems (ADAMS) Accession No. (ML23313A096).

The NRC staff subsequently determined that the Performance Assessment section of the Green, non-cited violation (NCV)05000313/2023003-02, Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(1) was not included in the report. This error was due to an administrative oversight. Consistent with NRC processes, the Performance Assessment section has been added and this report is being reissued in whole.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Signed by Dixon, John on 11/21/23 Docket Nos. 05000313, 05000368, 07200013 License Nos. DPR-51, NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000313, 05000368, and 07200013

License Numbers:

DPR-51 and NPF-6

Report Numbers:

05000313/2023003, 05000368/2023003, and 07200013/2023001

Enterprise Identifier:

I-2023-003-0007 and I-2023-001-0015

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One

Location:

Russellville, AR

Inspection Dates:

July 1, 2023, to September 30, 2023

Inspectors:

L. Brookhart, Senior Spent Fuel Storage Inspector

R. Bywater, Senior Resident Inspector

T. DeBey, Resident Inspector

T. Farina, Senior Operations Engineer

J. Freeman, Spent Fuel Storage Inspector

S. Hedger, Senior Emergency Preparedness Inspector

R. Kopriva, Senior Project Engineer

K. Murphy, Operations Engineer

B. Tharakan, Technical Assistant

R. Williams, Operations Engineer

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(1)

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313/2023003-02 Open/Closed

[H.2] - Field Presence 71111.12 The inspectors identified a Green, non-cited violation of 10 CFR 50.155(c)(1), Mitigation of Beyond-Design-Basis Events, when the licensee failed to maintain equipment of sufficient capacity and capability to implement strategies to maintain and restore core cooling, containment, and spent fuel cooling capabilities following a beyond-design-basis external event. Specifically, the licensee failed to implement a fuel oil quality strategy for FLEX diesel-driven equipment, and consequently, FLEX diesel generator K12 failed a surveillance test.

Failure to Conduct Drills in Accordance with the Site Emergency Plan Cornerstone Significance Cross-Cutting Aspect Report Section Emergency Preparedness Green NCV 05000313,05000368/2023003-03 Open/Closed

[H.13] -

Consistent Process 71114.05 The inspectors identified a Green non-cited violation of 10 CFR 50.54(q)(2) associated with the licensees failure to follow their emergency plan. Specifically, the licensee failed to follow Arkansas Nuclear One Emergency Plan, revisions 46 and 47, section N.2.4, which requires annual radiological monitoring drills. The licensee failed to conduct correctly scoped radiological monitoring drills in 2021 and 2022 by not including sampling activities both onsite and offsite.

Additional Tracking Items

Type Issue Number Title Report Section Status URI 05000313,05000368/2023003-01 Use and Acceptance of the Holtec Canister with the CBS Variant Design Change 60854 Open

PLANT STATUS

Unit 1 began the inspection period at approximately 96 percent power because of elevated lake temperatures and having only two circulating water pumps available. Unit 1 operators raised power to 100 percent on July 8, 2023, when lake temperature allowed full power operation. On July 20, 2023, lake temperatures became elevated again and Unit 1 operators began to reduce power. Power was stabilized at approximately 95.5 percent. Unit 1 operators restored the unit to full power on July 22, 2023, when lake temperature allowed full power operation. Unit 1 remained at or near full power for the remainder of the inspection period.

Unit 2 began the inspection period at full power. On September 10, 2023, Unit 2 operators detected a small (approximately 0.2 percent), unexpected, reduced power with simultaneous reduction in reactor coolant system cold leg A temperature, steam generator A pressure, and slight change in core flux azimuthal tilt. The licensee determined that core mass flow was less than required by technical specification 3.2.5 and Unit 2 operators reduced power to approximately 85 percent to restore compliance with the technical specification. The licensee concluded the most likely cause of the reduction in reactor coolant system flow was movement of the cold leg A safety injection system thermal sleeve. The licensee completed an analysis of the condition that allowed returning the unit to 100 percent power. Unit 2 operators raised power to 100 percent power on September 22, 2023, and the unit remained at or near full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 emergency diesel generator (K-4B) during outage of alternate train (K-4A)emergency diesel generator on August 1, 2023
(2) Unit 1 underground storage/fuel transfer system for emergency diesel generators after system outage and fuel transfer test on August 3, 2023
(3) Unit 1 125 Vdc vital dc power after charger problem/tripped breaker/degraded batteries on August 10, 2023

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 intake structure FZ-1030, 1061, and 1062 on July 6, 2023
(2) Unit 1 computer room FZ-160-B on July 7, 2023
(3) Unit 2 main steam isolation valve/steampipe room FZ-2155-A on July 11, 2023
(4) Unit 2 north electrical equipment room FZ-2091-BB on July 12, 2023
(5) Unit 1 boric acid tank and pump room FZ-120-E on August 1, 2023
(6) Unit 1 north emergency diesel generator room FZ-86-G on August 31, 2023

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (2 Samples)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on June 7, 2023, to July 21, 2023.
(2) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from June 19, 2023, to July 28, 2023.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on July 7, 2023.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 crew response to degraded reactor coolant system flow and emergent power reduction on September 10, 2023.
(2) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 planned downpower to 86 percent and performance of main turbine governor valve testing on September 28, 2023.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (3 Samples)

(1) The inspectors observed and evaluated Unit 1 requalification job performance measure tasks (transfer control rods to auxiliary power supply, restore power to dead bus) on July 20, 2023.
(2) The inspectors observed and evaluated Unit 1 training scenario for pressurizer system failure events on August 15, 2023.
(3) The inspectors observed and evaluated Unit 2 training scenario for overcooling events and excess steam demand on August 22, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:

(1)maintenance due to non-functionality of Unit 2 area radiation monitor 2RITS-8905 for equipment hatch area (EITER equipment) on July 27, 2023

(2) Limitorque operator periodic inspection and lubrication on August 15, 2023 (3)manhole MH-8 mechanical inspection and dewatering on August 17, 2023
(4) FLEX diesel generator preventive maintenance practices following failure of the K12 diesel generator on November 10, 2021

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 elevated risk from planned system maintenance on emergency diesel generator B on July 18, 2023
(2) Unit 2 elevated risk from planned system maintenance on atmospheric dump valve 2CV-0305 at power on July 20, 2023
(3) Unit 2 elevated risk from planned system maintenance on emergency diesel generator B on July 24, 2023
(4) Unit 1 elevated risk from planned system maintenance on emergency diesel generator A on August 2, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)operability of Unit 1 emergency feedwater initiation and control system pressure transmitter PT-2667A, installed with a low-pressure vent configuration, unlike the other pressure transmitters in the system, on July 24, 2023 (2)operability of Unit 1 emergency diesel generator 2 after 2-year overhaul on July 27, 2023 (3)operability of Unit 1 primary makeup pump B, P-36B, due to inboard seal leakage on August 30, 2023 (4)operability of Unit 2 reactor coolant system from a step change in reactor coolant flow in loop A due to a rotated or partially ejected high pressure injection thermal sleeve on September 10, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (6 Samples)

(1) Unit 1 reactor protection system D control rod drive breaker trip test following maintenance on August 15, 2023
(2) Unit 1 emergency diesel generator K-4A testing following the 24-month maintenance and air valve replacements on August 17, 2023
(3) Unit 2 electrohydraulic pump following replacement on September 6, 2023
(4) Unit 1 vital battery charger D-03A following preventive maintenance on September 18, 2023
(5) Unit 1 emergency feedwater pump turbine steam generator A admission valve CV-2667 following major preventive maintenance on September 19, 2023
(6) Unit 1 emergency feedwater pump steam admission valve CV-2663 following major preventive maintenance on September 19, 2023

Surveillance Testing (IP Section 03.01) (4 Samples)

(1) Unit 2 emergency diesel generator 2K-4B fast start testing on August 24, 2023
(2) Unit 2 reactor building spray pump P-35B periodic test on September 12, 2023 (3)emergency cooling pond sounding on September 13, 2023
(4) Unit 2 Red train emergency feedwater suction valves on September 22, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) Unit 1 service water pump P-4B inservice test on August 8, 2023

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the maintenance and testing of the alert and notification system between August 31, 2020, and August 19, 2023.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between August 31, 2020, and August 19, 2023. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
  • Procedure 1903.010, Emergency Action Level Classification, revision 61, with change summary submitted on March 2, 2023
  • Arkansas Nuclear One Emergency Plan, revision 48, with change summary submitted on May 11, 2023 In addition, the inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between August 30, 2020, and August 19, 2023. The evaluation reviewed screenings and evaluations documenting implementation of the process. The reviews of the change process documentation or the emergency plan changes do not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program between August 30, 2020, and August 19, 2023. The evaluation reviewed evidence of completing various emergency plan commitments, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness. In addition, the inspectors observed an alternate emergency response facilities tabletop drill conducted on August 29, 2023.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1)emergency drill involving Unit 2 loss of coolant accident with fuel failure leading to a General Emergency declaration on September 26,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) July 1, 2022, through June 30, 2023 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) July 1, 2022, through June 30, 2023 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) July 1, 2022, through June 30, 2023

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) Site challenges to maintaining radiation monitors and repeat instrument failures/obsolescence on August 17, 2023.

The sites corrective action program records and deficiency tagging of radiation monitors shows that keeping the instruments functional is an ongoing struggle. The instruments are obsolete, and it is increasingly difficult to maintain a supply of spare or replacement parts. Repaired instruments do not always continue to operate for a reasonable time and the time burden to site technicians is considerable. The sites plan to address this issue is still years from being implemented.

71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP section 03.03)

(1) The inspectors evaluated the Unit 2 unplanned downpower to 85 percent for inadequate reactor coolant system flow on September 10,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===60854 - Preoperational Testing of an ISFSI Determine by direct observation and independent evaluation whether the licensee had developed, implemented, and evaluated preoperational testing activities to safely load spent fuel from site's spent fuel pool to the Independent Spent Fuel Storage Installation (ISFSI) and safely retrieve spent fuel from the ISFSI and transfer it back to the licensee's spent fuel pool.

Preoperational Testing Of An ISFSI===

(1) Arkansas Nuclear One (ANO) is a 10 CFR Part 72 general licensee in accordance with 10 CFR 72.210. Previously, the ANO ISFSI consisted of two different cask designs. ANO had loaded 24 canisters of the Energy Solutions ventilated storage cask (VSC) design, VSC-24, (Certificate of Compliance (CoC) No. 72-1007) from 1996 to 2003. Then in 2003, ANO switched to loading the Holtec HI-STORM 100S version C overpacks (CoC 72-1014) containing either a multi-purpose canister (MPC)-24 or MPC-32 containing either 24 or 32 spent fuel assemblies. In 2023, ANO had elected to use the Holtec HI-STORM Flood/Wind (FW) system (CoC 72-1032) to continue storing fuel at the ISFSI. The site's ISFSI pads contained a total of 24 VSC-24 casks, 80 HI-STORM 100 casks and the future casks would be HI-STORM FW casks containing 37 spent fuel assemblies (MPC-37). On August 21-25, 2023, inspectors performed onsite inspections to observe and evaluate the pre-operational testing and training exercises being conducted by the licensee. These operations are described in condition 9 of the CoC and are performed by a general licensee prior to the use of the system to store spent fuel assemblies.

During the inspection period, inspectors specifically observed the following demonstrations that were successfully completed by the licensee:

  • movement of the transfer cask from the fuel building to the Cask Transfer Facility using the low profile transporter and rail car
  • transition of the transfer cask from the low profile transporter to the Vertical Cask Transporter (VCT)
  • stack-up of the transfer cask on to the top of the FW overpack using the VCT
  • download of the MPC simulator from the transfer cask into the FW overpack
  • removal of the empty transfer cask from the stack-up position.

INSPECTION RESULTS

Unresolved Item (Open)

Use and Acceptance of the Holtec Canister with the CBS Variant Design Change URI 05000313,05000368/2023003-01 60854

Description:

The inspectors identified an unresolved item (URI) related to design changes on the dry cask storage multi-purpose canisters (MPC) utilized by the licensee. On November 6, 2020, Holtec International, the supplier of HI-STORM FW storage system, performed Engineering Change Order (ECO) No. 5018-122 and 72.48 Design No. 1498.

These evaluations performed a design change to introduce a new MPC basket design to the HI-STORM FW dry storage system, designated as the continuous basket shim (CBS) variant.

On September 12, 2023, the NRC issued Inspection Report 07201014/2022-201 (ADAMS Accession No. ML23145A175) to Holtec International, identifying three apparent violations associated with design change. The apparent violations, related to 10 CFR 72.48 and 10 CFR 72.146 requirements, are for Holtecs apparent failures to provide adequate bases that the CBS variant did not require a license amendment, failure to ensure the change did not result in a departure from the method of evaluations described in the Final Safety Analysis Report, and failure to establish design control measures commensurate with those applied to the original design. At this time, the NRC has determined there is no immediate safety concern associated with the use of the modified basket design.

On January 25, 2023, the licensee adopted Holtecs CBS ECO/72.48 through the licensees 72.48 program, LBDCR No. 2022-034, and subsequently loaded the MPC-37-CBS canister during their September 2023 loading campaign.

General licensees are responsible to ensure that each cask they use conforms to the terms, conditions, and specifications of a Certificate of Compliance (CoC) or an amended CoC listed in 72.214 and regulatory requirements in 10 CFR Part 72. Accordingly, pending determination of the final enforcement action to Holtec International associated with the design change, it may be determined that ANO's loading of the dry storage systems did not meet regulatory requirements.

Planned Closure Actions: The licensees performance related to the adoption and use of the MPC-37-CBS canister is unresolved at this time as the NRC has not made a final determination for the apparent violations documented in Inspection Report 07201014/2022-201. The inspectors can evaluate the general licensees compliance with regulatory requirements associated with loading of MPC baskets with the CBS variant once a final determination is made.

Licensee Actions: The licensee entered the issue into its corrective action program and initiated actions to review the results of the NRC's final determination and determine if changes are needed.

Corrective Action References: Condition Report CR-HQN-2023-03197 Failure to Maintain FLEX Equipment Consistent with the Requirements of 10 CFR 50.155(c)(1)

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313/2023003-02 Open/Closed

[H.2] - Field Presence 71111.12 The inspectors identified a Green, non-cited violation of 10 CFR 50.155(c)(1), Mitigation of Beyond-Design-Basis Events, when the licensee failed to maintain equipment of sufficient capacity and capability to implement strategies to maintain and restore core cooling, containment, and spent fuel cooling capabilities following a beyond-design-basis external event. Specifically, the licensee failed to implement a fuel oil quality strategy for FLEX diesel-driven equipment, and consequently, FLEX diesel generator K12 failed a surveillance test.

Description:

The site employs various diesel-driven equipment for their Phase 2 FLEX strategies. To maintain adequate quality of the diesel engine fuel oil, annual fluid analysis was required to be completed by Section 5.3.3, FLEX Equipment Maintenance, of Procedure EN-OP-201-01, Arkansas Nuclear One FLEX Program Document, revision 4.

FLEX diesel fuel oil analysis for three parameters (kinematic viscosity, water and sediment, and cloud point) was required by Procedure OP-1000.113, Diesel Fuel Monitoring Program, revision 17. A Model Work Order was developed to perform the periodic sampling and analyses on a 1-year frequency and work orders were issued annually to perform the sampling. The inspectors found that FLEX fuel oil sampling was not being performed.

Instead, the completed work orders stated that fuel oil was replaced in lieu of sampling. No documentation of fuel oil replacement could be found. The documentation that was available indicated the FLEX equipment diesel tanks were initially filled in the 2015-timeframe; and, tanks had not been inspected for water or sediment, fuel oil had not been sampled and analyzed, and tanks had not been drained and refilled with fresh fuel oil.

On November 10, 2021, the K12 800 kW FLEX diesel generator failed its 3-year full load surveillance test and was not capable of fulfilling its mission to power critical loads during a beyond-design-basis event. The licensees equipment failure evaluation (CR-ANO-C-2021-02976 CA-03) documented discovery that every O-ring, seal, washer, and gasket needed reseal, for one of the two fuel oil injection pumps. Debris from the failed fuel oil injection pump clogged the fuel injectors on one side of the engine, preventing its operation at full load.

The evaluation did not document a cause for the failed injection pump (and the inspectors did not find any documentation of cause in the corrective maintenance work order), but it documented that the vendor manual contained a recommendation that inspection, testing, and replacing parts as necessary for the fuel oil injection pump be performed every 4 years.

The licensee had not included this recommendation in the FLEX diesel generator preventive maintenance program. In addition to replacing the fuel oil injection pumps on both the K12 and K11 diesel generators, a corrective action was initiated to add the 4-year, vendor-recommended, fuel oil injection pump preventive maintenance to the preventive maintenance program. Based on the facts that FLEX fuel oil sampling and analysis had not been performed and fuel oil in FLEX equipment was not being periodically replaced, and that diesel fuel oil is expected to degrade over time, the inspectors concluded degraded fuel oil contributed to the failure.

The inspectors reviewed the licensees FLEX diesel generator preventive maintenance requirements with those recommended in the K11/K12 Vendor Manual TDG971 0010, FLEX Portable Diesel Generator, revision 0. Procedure EN-OP-201-01, Arkansas Nuclear One FLEX Program Document, revision 4, identified the following preventive maintenance items and frequencies for the K11/K12 FLEX diesel generators:

Functional Test and Inspection 6 months Operational Inspection, Fluid Analysis 1 year Fluid Filter Replacement 2 years Generator Full Load Test 3 years The vendor manual identified several additional preventive maintenance recommendations and some that were at different frequencies for engines used as emergency engines.

Examples of vendor-recommended preventive maintenance activities that the licensee did not include were: operate the engine weekly at no load; operate the engine monthly at 1/2 load; drain water out of the fuel tank annually; drain water from fuel filters annually; and check fuel injector spray conditions and spray pressure annually.

The licensee believes that technical justifications for deviations from vendor recommendations for preventive maintenance were not required because their FLEX preventive maintenance program implemented the EPRI Templates referenced in Nuclear Energy Institute (NEI) letter dated October 3, 2013, which forwarded EPRI Technical Report 3002000623, Nuclear Maintenance Applications Center: Preventive Maintenance Basis for FLEX Equipment, (ADAMS Accession No. ML13276A573). This was endorsed by the NRC in a letter dated October 7, 2013, (ADAMS Accession No. ML13276A224). The EPRI document described the expansion of EPRIs preventive maintenance basis database to include FLEX equipment and a process for developing preventive maintenance templates for FLEX equipment. The licensee informed the inspectors that the preventive maintenance program for their K11 and K12 FLEX diesel generators (which have Mitsubishi engines) were based on the EPRI template created for FLEX generators (which was based on John Deere engines). The licensee stated that similar expectations exist for normal-use periodic operating requirements for John Deere and Mitsubishi engines, so it was appropriate to use the EPRI templates for the ANO FLEX diesel generators. The licensees position was that they follow the EPRI templates and evaluate any deviations from them; evaluations were not required for deviations from vendor recommendations.

The inspectors reviewed the licensees FLEX preventive maintenance template (based on the EPRI template) for the FLEX Diesel Generators, PM Basis Template EN FLEX Generator - 1000KW or Less - Diesel Driven, revision 0. The inspectors found the licensee had identified and evaluated one deviation from the EPRI template. The licensees PM Basis template said the EPRI template identified a 3-month frequency for the FLEX diesel generator Functional Test and Inspection. However, the licensee stated a 6-month frequency was acceptable because their use of an EPRI PM Database Vulnerability Tool resulted in only a 2 percent increase in failure rate for the extended frequency. The inspectors noted that the licensees FLEX preventive maintenance template also included a note stating, This template is intended to be used in consultation with the specific vendor manuals associated with the specific equipment of interest. Neither the deviation from the template, nor any other location in the template, referenced recommendations from the Mitsubishi vendor manual.

The NRCs October 7, 2013, letter (issued after NRC endorsement of NEI 12-06, revision 0)regarding EPRI templates, only stated that the staff agreed that the EPRI Report and templates provided a useful input to an acceptable approach for licensees to use in developing their maintenance and testing programs. The inspectors noted that NEI has issued revision 4 of NEI 12-06 (ADAMS Accession No. ML16354B421) and it was reviewed and endorsed by the NRC when NRC issued JLD-ISG-2012-01, revision 2, in February 2018 (ADAMS Accession No. ML17005A188). This document, with an effective date of April 25, 2018, represented the most recent NRC guidance and clarification for meeting FLEX requirements. The inspectors reviewed NEI 12-06, revision 4, and noted an important clarification was added in section 11.5 for FLEX maintenance and testing that was not included in revision 0.

Revision 0:

Standard industry templates (e.g., EPRI) and associated bases will be developed to define specific maintenance and testing including the following:

Revision 4:

Standard industry templates (e.g., EPRI) and associated bases (i.e., site-specific)

[emphasis added] will be developed to define specific maintenance and testing including the following:

The text immediately following was the same in both revisions, including statements for periodic testing and frequency and preventive maintenance, that, The basis should be documented and deviations from vendor recommendations and applicable standards should be justified.

The inspectors concluded the addition of site-specific in the language of NEI 12-06, revision 4, provided added emphasis on the need for the licensee to evaluate differences between the generic EPRI templates and site-specific equipment requirements that are needed for different equipment, like Mitsubishi diesel generators.

Corrective Actions: The licensee was not able to repair the K12 engine on site. It was transported to a vendor site in Louisiana where the engine was repaired and returned to the ANO site. The ANO Flex Marshal position was transitioned to a different employee and diesel fuel sampling of the FLEX equipment was initiated in 2023 at a quarterly periodicity until fuel quality was definitively documented and trended.

Corrective Action References: The licensee entered this issue into the sites corrective action program with condition reports CR-ANO-C-2023-03536 and CR-ANO-C-2023-03537.

Performance Assessment:

Performance Deficiency: The failure to maintain equipment reliability for mitigation strategies for beyond-design basis external events was a performance deficiency. Specifically, the licensee failed to perform fuel oil sampling and analysis to maintain fuel oil quality for FLEX diesel-driven equipment which contributed to the failure of FLEX diesel generator K12.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to implement a fuel oil quality strategy for FLEX diesel-driven equipment, and consequently, FLEX diesel generator K12 failed a surveillance test and was not functional for almost 3 months.

Significance: The inspectors assessed the significance of the finding using IMC 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Using the Mitigating Systems exhibit 2, section E, for FLEX findings, the inspectors determined that the issue finding screened as Green because:

1. it was not associated with equipment, training, procedures, and/or other programmatic

aspects credited for the sole purpose of satisfying the requirements of Order EA-12-051 or 10 CFR 50.155 for spent fuel pool instrumentation or EA-13-109 for containment venting; and,

2. it did not involve equipment, training, procedures, and/or other programmatic aspects

credited in any Phase 1 or 2 FLEX strategy such that any FLEX function (such as extended high-pressure coolant injection/reactor core isolation cooling/auxiliary feedwater operation, providing FLEX dc power, FLEX ac power, or FLEX reactor coolant system feed) could not be completed in accordance with existing plant procedures within the time allotted for an exposure period of greater than 21 days.

Specifically, the licensee failed to implement a fuel oil quality strategy for FLEX diesel-driven equipment, where the licensee failed to perform fuel oil analysis at the specified annual frequency, and consequently, FLEX diesel generator K12 failed testing and was unavailable for almost 3 months. However, the FLEX ac power function could have been completed because the backup piece of equipment (the K11 FLEX portable diesel generator) remained available and could have been used within the time allotted.

Cross-Cutting Aspect: H.2 - Field Presence: Leaders are commonly seen in the work areas of the plant observing, coaching, and reinforcing standards and expectations. Deviations from standards and expectations are corrected promptly. Senior managers ensure supervisory and management oversight of work activities, including contractors and supplemental personnel.

Specifically, although the FLEX program was an Entergy fleet program, the ANO operations department was responsible for implementing the FLEX equipment testing and maintenance at the ANO site. Inadequate training was given to the ANO FLEX Marshal and little, if any, direct supervisory oversight occurred.

Enforcement:

Violation: NRC regulation 10 CFR 50.155(c)(1) states, The equipment relied on for the mitigation strategies and guidelines required by paragraph (b)(1) of this section must have sufficient capacity and capability to perform the functions required by paragraph (b)(1) of this section. Paragraph (b)(1) states, in part, that strategies and guidelines must include the following:

(i) Maintaining or restoring core cooling, containment, and spent fuel pool cooling capabilities The licensee describes its strategies to meet 10 CFR 50.155(b)(1) and (c)(1) in Procedure EN-OP-201-01, Arkansas Nuclear One FLEX Program Document, revision 4, which required annual analysis of FLEX fuel in accordance with Procedure OP-1000.113, Diesel Fuel Monitoring Program, revision 17.

Contrary to the above, since 2015, the licensee failed to implement the annual sampling and analysis requirements for FLEX diesel fuel in accordance with procedures EN-OP-201-01 and OP-1000.113.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with section 2.3.2 of the Enforcement Policy.

Failure to Conduct Drills in Accordance with the Site Emergency Plan Cornerstone Significance Cross-Cutting Aspect Report Section Emergency Preparedness Green NCV 05000313,05000368/2023003-03 Open/Closed

[H.13] -

Consistent Process 71114.05 The inspectors identified a Green, non-cited violation of 10 CFR 50.54(q)(2) associated with the licensees failure to follow their emergency plan. Specifically, the licensee failed to follow Arkansas Nuclear One Emergency Plan, revisions 46 and 47, section N.2.4, which requires annual radiological monitoring drills. The licensee failed to conduct correctly scoped radiological monitoring drills in 2021 and 2022 by not including sampling activities both onsite and offsite.

Description:

The inspectors reviewed drills and exercises conducted by the licensee between 2020 and 2022 and compared the drill and exercise evaluation reports to the requirements of the licensee emergency plan.

Arkansas Nuclear One Emergency Plan, revisions 46 and 47, section N.2.4, requires that plant environs and radiological monitoring drills (on and offsite) are conducted annually. To verify these took place, the inspectors evaluated radiological monitoring drill reports (environmental drills) held on August 6, 2020, June 3, 2021, and June 1, 2022. In reviewing the reports, the inspectors observed that the sampling locations were denoted with alpha-numeric codes, so further questions were asked about where they were located with respect to the site boundary. Discussion with the licensee staff revealed that sampling activities in 2020 took place appropriately both onsite and offsite, but in 2021 and 2022 the samples were only evaluated at offsite locations.

The inspectors reviewed the licensees documentation describing how emergency preparedness drills were developed and implemented. To ensure that the drill included necessary aspects of scope in design, the licensee modified Performance Objective I.9, Environmental Phase Monitoring, taken from Procedure EN-EP-306, Drills and Exercises, attachment 6, to include more specific language. It was revised to say, Demonstrate the ability to monitor post-plume environmental conditions in the field (at least one sample onsite and one offsite). This performance objective was used effectively in 2020 to ensure that the drill scope included sampling activities onsite and offsite, as well as to conduct the drill correctly. In 2021, the radiological monitoring drill used the same performance objective in design, but the licensee failed to use it to ensure appropriate implementation. In 2022, after some changes to drill documentation format, the performance objective statement was revised, removing text reinforcing the need for onsite and offsite sampling, introducing an error in drill design.

The inspectors determined that the licensee did not conduct annual radiological monitoring drills in a manner that ensured that all sampling activities were evaluated in all specified locations. Therefore, the inspectors concluded that the licensee did not follow the requirements of the site emergency plan.

Corrective Actions: The licensee entered these issues into the corrective action program.

Corrective Action References: Condition Report CR-ANO-C-2023-03166

Performance Assessment:

Performance Deficiency: The inspectors determined that the failure to conduct drills required by the emergency plan is a performance deficiency within the licensees ability to foresee and correct.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the ERO Performance attribute of the Emergency Preparedness cornerstone and adversely affected the cornerstone objective to ensure that the licensee is capable of implementing adequate measures to protect the health and safety of the public in the event of a radiological emergency. The licensees ability to take adequate measures to protect the health and safety of the public is degraded when the licensee does not perform drills and exercises to ensure emergency response organization proficiency.

Significance: The inspectors assessed the significance of the finding using IMC 0609, Appendix B, Emergency Preparedness SDP. Using attachment 2, the performance deficiency was determined to have very low safety significance (Green) because it was a failure to comply with NRC requirements, was not a loss of planning standard function, and was not a degraded risk significant planning standard function. The planning standard function was not lost because the licensee did conduct drills, training, and normal sampling activities that addressed portions of the related emergency plan commitments.

Cross-Cutting Aspect: H.13 - Consistent Process: Individuals use a consistent, systematic approach to make decisions. The licensee did not use a consistent, systematic approach to making decisions regarding use of radiological monitoring drills performance objectives.

Specifically, the associated drill performance objectives were not used regularly to ensure that drills as implemented included the appropriate scope elements in the evaluation. This would have provided assurance that the emergency plan commitments would be addressed in a regular fashion.

Enforcement:

Violation: Title 10 CFR 50.54(q)(2) requires, in part, that a power reactor licensee follow an emergency plan which meets the requirements of appendix E to 10 CFR Part 50 and the standards of 10 CFR 50.47(b). Planning standard 10 CFR 50.47(b)(14) requires, in part, that the licensee conduct periodic drills to maintain key skills. Arkansas Nuclear One Emergency Plan, revisions 46 and 47, section N.2.4, states, in part, that plant environs and radiological monitoring drills (on and offsite) are conducted annually.

Contrary to the above, between January 1, 2022, and September 1, 2023, Arkansas Nuclear One failed to follow an emergency plan which met the requirements of appendix E and the standards of 10 CFR 50.47(b). Specifically, the licensee failed to conduct annual radiological monitoring drills including sampling activity evaluation both on and offsite in 2021 and 2022, which are required by the emergency plan to maintain key emergency response organization skills.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 13, 2023, the inspectors presented the ANO-1 2023 biennial requalification inspection results to Albert Fields, Training Supervisor, and other members of the licensee staff.
  • On September 1, 2023, the inspectors presented the emergency preparedness program inspection results to Frank Shewmake, Operations Director, and other members of the licensee staff.
  • On October 19, 2023, the inspectors presented the ANO independent spent fuel storage installation dry run operations inspection results to Brian Patrick, Regulatory Assurance and Performance Improvement Director, and other members of the licensee staff.
  • On October 19, 2023, the inspectors presented the integrated inspection results to Brian Patrick, Regulatory Assurance and Performance Improvement Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

60854

Corrective Action

Documents

CR-HQN-2023-03197

Holtec MPC-CBS Variant

60854

Procedures

Procedure 3407.003

HI-STORM FW Loading Operations

60854

Procedures

Procedure 3407.005

HI-STORM FW Transfer and Transport Operations

71111.04

Corrective Action

Documents

CR-ANO-

1-2022-00794, 1-2022-00883, 1-2023-00164, 1-2023-

00453, 1-2023-00492, 1-2023-00499, 1-2023-00790, 1-

23-00791, 1-2023-01339, C-2022-003531, C-2023-

2882

71111.04

Procedures

OP-1104.036

Emergency Diesel Generator Operation

71111.04

Procedures

OP-1412.081

Battery Chargers Cleaning and Inspection

71111.04

Procedures

OP-1412.216

Vital 120 VAC 10 KVA Inverter Inspection

71111.04

Procedures

ULD-1-SYS-03

Unit 1 125 Volt DC System

71111.04

Work Orders

WO 2976861

71111.05

Corrective Action

Documents

CR-ANO-

1-2022-01281, 1-2022-01651, 1-2022-03111, 1-2023-

00794, 1-2023-01915, C-2021-00858, C-2023-01341,

71111.05

Engineering

Changes

EC-94147

EC Reply to Point to Documentation Stating Fire Wrap is

not Required in Correlation with EC-85804

71111.05

Miscellaneous

FHA

Unit 1 and Unit 2 Fire Hazards Analysis

71111.05

Miscellaneous

PFP-U1-R021

Unit 1 Prefire Plans

71111.05

Miscellaneous

PFP-U2-R17

Unit 2 Prefire Plans

71111.05

Procedures

OP-1003.005

Fire Prevention Inspection

71111.05

Procedures

PFP-U1

ANO Prefire Plan (Unit 1)

71111.05

Procedures

PFP-U2

ANO Prefire Plan (Unit 2)

71111.11B

Corrective Action

Documents

CR-ANO-1-2021-

2574

Condition Report (Exam Security)

08/10/2021

71111.11B

Corrective Action

Documents

CR-ANO-1-2022-

00513

NI Calibration PU&A

03/23/2022

71111.11B

Corrective Action

Documents

CR-ANO-1-2023-

00857

Operations Training Staffing

06/15/2023

71111.11B

Corrective Action

Documents

CR-ANO-C-2021-

2533

Exam Security

09/27/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Corrective Action

Documents

CR-ANO-C-2022-

00407

Condition Report (Exam Security)

2/11/2022

71111.11B

Corrective Action

Documents

CR-ANO-C-2022-

251

Condition Report (Exam Security)

05/05/2022

71111.11B

Corrective Action

Documents

CR-ANO-C-2022-

01881

Operator Qualification Requirements

07/11/2022

71111.11B

Corrective Action

Documents

CR-ANO-C-2023-

294

Condition Report (Exam Security)

01/31/2023

71111.11B

Corrective Action

Documents

CR-ANO-C-2023-

01375

NRC Medical Reporting

05/09/2023

71111.11B

Corrective Action

Documents

DR-21-0051

Simulator Discrepancy Report

09/02/2021

71111.11B

Corrective Action

Documents

DR-22-0034

Simulator Discrepancy Report

11/17/2022

71111.11B

Corrective Action

Documents

DR-23-0011

Simulator Discrepancy Report

04/20/2023

71111.11B

Corrective Action

Documents

EN-FAP-OM-029 Rev

Adverse Condition

Monitoring and

Contingency Plan

Maintaining Condenser Vacuum while P-3B and P-3D

are OOS

06/01/2023,

Rev 2

71111.11B

Corrective Action

Documents

EN-FAP-OM-029 Rev

Adverse Condition

Monitoring and

Contingency Plan

Elevated Main Generator Hydrogen Leakage

03/20/2023,

Rev 5

71111.11B

Corrective Action

Documents

EN-FAP-OM-029 Rev

Adverse Condition

Monitoring and

Contingency Plan

Elevated Exciter Air Cooler Temperatures

07/03/2023,

Rev 0

71111.11B

Corrective Action

Documents

TQF-201-IM05

Cycle 2201 Simulator Evaluation Remediation

09/07/2021,

Rev 0

71111.11B

Corrective Action

Documents

WT-WTANO-2021-

00014

Operator Diagnosis - Plant Event

09/07/2021

71111.11B

Corrective Action

Documents

WT-WTANO-2021-

270

LOR Performance Issue - RB CLG Actions

09/13/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Miscellaneous

ANO1 Modifications Not Completed Last Two Years

(none)

06/09/2023

71111.11B

Miscellaneous

ANO1 Simulator Open Work Items 6-9-23

06/09/2023

71111.11B

Miscellaneous

JPM Overlap

71111.11B

Miscellaneous

ANO-1 Simulator Core Reload Acceptance Test - Cycle

71111.11B

Miscellaneous

Cycle 22 and 23 Training Attendance Records

71111.11B

Miscellaneous

23 Annual Operating Test - Week 2

71111.11B

Miscellaneous

23 Annual Operating Test - Week 4

71111.11B

Miscellaneous

A1JPM-RO-EDG10

Perform Starting the Emergency Diesel Without DC

Control Power

71111.11B

Miscellaneous

A1JPM-RO-NNI02

Reset NNI-Y Power Supply

71111.11B

Miscellaneous

A1REC-SIM-ANSI

Unit 1 Cycle 31 Simulator Operability Test

71111.11B

Miscellaneous

A1WEXLORBIENNIAL

2305 RO Week 3

RO Week 3 Written Examination

71111.11B

Miscellaneous

A1WEXLORBIENNIAL

2305 SRO Week 3

SRO Week 3 Written Examination

71111.11B

Miscellaneous

eSOMS Report -

Watchstanding

Records

Watchstanding Records Crew B

06/08/2023

71111.11B

Miscellaneous

Licensed Operator

Medical Records

Six licensed operator medical records

N/A

71111.11B

Miscellaneous

SES-1-016

ANO1 Dynamic Exam Scenario

71111.11B

Miscellaneous

SES-1-032

ANO1 Dynamic Exam Scenario

71111.11B

Procedures

1063.008

Operations Training Sequence

71111.11B

Procedures

ASREC-OPS-FHSRO

Activation of SRO License for Fuel Handling Activities

71111.11B

Procedures

ASREC-OPS-LICRA

Activation of RO License

71111.11B

Procedures

DG-TRNA-015-

EXAMSEC

Simulator Exam Security Guidelines

71111.11B

Procedures

EN-OP-115-06

Activation and Deactivation of Licenses, and Maintaining

Active License Status

71111.11B

Procedures

EN-TQ-210

Conduct of Simulator Training

71111.11B

Procedures

EN-TQ-218

Licensed Operator Requalification Annual and Biennial

Exam Development

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Procedures

TQF-210-DD04

RO/SRO Performance Evaluation Report

71111.11B

Procedures

TQF-210-DD04-Grade

RO/SRO Performance Evaluation Grading Criteria

71111.11Q

Corrective Action

Documents

CR-ANO-

1-2019-01821, 1-2019-04374, 1-2021-01867, 2-2023-

2453, 2-2023-02457

71111.11Q

Miscellaneous

NPF-6

Appendix A, Technical Specifications to Facility

Operating License

71111.11Q

Procedures

AOP-2203.011

RCS Overcooling Technical Guidelines

71111.11Q

Procedures

AOP-2203.050

Overcooling Event in Modes 1 or 2 Technical Guidelines

71111.11Q

Procedures

OP-1102.004

Power Operation

71111.11Q

Procedures

OP-1103.004

Soluble Poison Concentration Control

71111.11Q

Procedures

OP-1103.005

Pressurizer Operations

71111.11Q

Procedures

OP-1103.013

RCS Leak Detection

71111.11Q

Procedures

OP-1106.009

Turbine Startup

71111.11Q

Procedures

OP-1107.002

ES Electrical System Operation

71111.11Q

Procedures

OP-1203.015

Pressurizer Systems Failures

71111.11Q

Procedures

OP-2102.004

Power Operation

71111.11Q

Procedures

OP-2103.018

RCS Flow Rate Calculation

71111.11Q

Procedures

OP-2203.025

RCP Emergencies

71111.11Q

Procedures

OP-2203.050

Overcooling Event in Modes 1 or 2

71111.11Q

Work Orders

WO 53030817, 53030820

71111.12

Corrective Action

Documents

CR-HQN-2020-00226, WT-WTANO-2022-00058, WT-

WTANO-2022-00270

71111.12

Corrective Action

Documents

CR-ANO-

2-2022-01408, 2-2023-00108, 2-2023-00859, 2-2023-

01808, C-2021-02976, C-2021-02985, C-2022-00269,

C-2022-00376, C-2022-00538, C-2022-00890, C-2022-

225, C-2022-01388, C-2022-01397, C-2023-00036,

C-2023-00387, C-2023-03536, C-2023-03537,

71111.12

Miscellaneous

PM Basis Template EN FLEX Generator - 1000KW or

Less - Diesel Driven

11/21/2014

71111.12

Miscellaneous

2016-00051

FLEX Oil PM Sampling Parameters & Acceptance

Criteria Position Paper

03/28/2016

71111.12

Miscellaneous

EMRG36864

Operators Manual - 9.0 L OEM Diesel Engines

03/06/2013

71111.12

Miscellaneous

IDLC8000-2M

Generac Industrial Diesel Generator

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Miscellaneous

IPH1250/175DJ

High Performance Industrial Pumping Module

11/2014

71111.12

Miscellaneous

MWO 00298463-01

Manhole MH-8, Mechanical: Inspection and Dewatering

03/10/2022

71111.12

Miscellaneous

TDG971 0010

FLEX Portable Diesel Generator

71111.12

Procedures

CFSG-005

Initial Assessment and FLEX Equipment Staging

71111.12

Procedures

EN-EP-202

Equipment Important to Emergency Response

71111.12

Procedures

EN-MA-141

Limitorque Valve Operator Model SMB/SB/SBD-000

Through 5 MOV and HBC Periodic Inspection

71111.12

Procedures

EN-OP-201

Diverse and Flexible Coping Strategies (FLEX) Fleet

Program Document

71111.12

Procedures

EN-OP-201-01

Arkansas Nuclear One FLEX Program Document

71111.12

Procedures

OP-1000.113

Diesel Fuel Monitoring Program

71111.12

Procedures

OP-1903.010

Emergency Action Level Classification

71111.12

Procedures

OP-2105.016

Radiation Monitoring and Evacuation System

71111.12

Procedures

OP-2404.018

U2 Containment Area Rad Mon Sys Cal

71111.12

Work Orders

WO 2929822, 52971630

71111.13

Corrective Action

Documents

CR-ANO-

2-2020-01970, 2-2020-03874, 2-2021-00251, 2-2022-

2139, C-2023-02904

71111.13

Procedures

COPD-024

Risk Assessment Guidelines

71111.13

Procedures

EN-WM-104

On Line Risk Assessment

71111.13

Procedures

OP-1104.036

Emergency Diesel Generator Operation

71111.13

Procedures

OP-1107.001

Electrical Systems Operations

135

71111.13

Procedures

OP-2104.036

Emergency Diesel Generator Operations

104

71111.13

Procedures

OP-2104.037

Alternate AC Generator Operations

71111.13

Procedures

OP-2105.008

Steam Dump and Bypass Control System Operations

71111.13

Procedures

OP-2107.001

Electrical Systems Operations

138

71111.13

Work Orders

WO 2988793, 53012021

71111.15

Calculations

CALC-07-R-1002-01

ECCS Leakage Quantities to the Auxiliary Building

71111.15

Calculations

CALC-89-E-0039-02

HPI Seal Integrity Evaluation

71111.15

Corrective Action

Documents

CR-ANO-

1-2022-02669, 1-2022-02739, 1-2023-00378, 1-2023-

00896, 1-2023-01190, 2-2023-2457, 2-2018-2976, 2-

2013-1190

71111.15

Drawings

M-2210, Sheet 1

Piping and Instrument Diagram Service Water System

71111.15

Engineering

0054051358

RCS Flow Margin Improvement

09/20/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Changes

71111.15

Engineering

Changes

29844

Unit 2 Service Water Loop 2 Suction Supply to 2P-7A

Leak

08/11/2023

71111.15

Engineering

Changes

54036605

Operability Input Regarding CR-ANO-2-2023-02299

Service Water Leak Near Loop 2 Supply Header Drain

Valve 2SW-1551"

08/12/2023

71111.15

Miscellaneous

ASME Boiler and

Pressure Vessel

Code, Code Case N-

513-4

Evaluation Criteria for Temporary Acceptance of Flaws

in Moderate Energy Class 2 or 3 Piping,Section XI,

Division 1

05/07/2014

71111.15

Miscellaneous

STM 1-04

Primary Makeup and Purification

71111.15

Miscellaneous

ULD-1-SYS-02

ANO-1 Makeup and Purification/High Pressure Injection

System

71111.15

NDE Reports

Report No.: 2-BOP-

UT-23-024

Component ID: 2SW-1551, U2-327 Squeeze Pit.

08/12/2023

71111.15

NDE Reports

Report No.: 2-BOP-

VE-20-001

Component ID: A SI Nozzle Thermal Sleeve, A SI

Nozzle Thermal Sleeve Detection

03/27/2020

71111.15

NDE Reports

Report No.: 2-BOP-

VE-20-002

Component ID: C SI Nozzle Thermal Sleeve, C SI

Nozzle Thermal Sleeve Detection

03/27/2020

71111.15

NDE Reports

Report No.: 2-BOP-

VE-20-003

Component ID: D SI Nozzle Thermal Sleeve, D SI

Nozzle Thermal Sleeve Detection

03/27/2023

71111.15

NDE Reports

Report No.: 2-BOP-

VE-20-003

Component ID: C SI Nozzle Thermal Sleeve, C SI

Nozzle Thermal Sleeve Detection

04/21/2023

71111.15

NDE Reports

Report No.: 2-BOP-

VE-20-004

Component ID: D SI Nozzle Thermal Sleeve, D SI

Nozzle Thermal Sleeve Detection

04/21/2023

71111.15

NDE Reports

Report No.: 2-BOP-

VE-20-004

Component ID: B Safety Injection, B Safety

Inspection

03/30/2020

71111.15

NDE Reports

Report No.: 2-BOP-

VE-21-001

Component ID: A SI Nozzle Thermal Sleeve, A SI

Nozzle Thermal Sleeve Detection

09/29/2021

71111.15

NDE Reports

Report No.: 2-BOP-

VE-21-005

Component ID: D SI Nozzle Thermal Sleeve, D SI

Nozzle Thermal Sleeve Detection

10/08/2021

71111.15

NDE Reports

Report No.: 2-BOP-

VE-23-002

Component ID: A SI Nozzle Thermal Sleeve, A SI

Nozzle Thermal Sleeve Detection

04/21/2023

71111.15

NDE Reports

Report No.: 2-BOP-

Component ID: 2HBC-86-6 Pipe, U2 335 North Hallway

08/11/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

VE-23-008

71111.15

NDE Reports

Report No.: 2-BOP-

VE-23-009

Component ID: 2SW-1551, U2-327 Squeeze Pit.

08/12/2023

71111.15

Procedures

EN-LI-102

Corrective Action Program

71111.15

Procedures

EN-OP-104

Operability Determination Process

71111.15

Procedures

OP-1104.036

Emergency Diesel Generator Operation

71111.15

Procedures

OP-1304.098

Unit 1 EFIC Channel A Calibration

71111.15

Procedures

OP-1304.135

Unit 1 Emergency Diesel Generator K-4B Instrument

Calibration

71111.15

Procedures

OP-1305.003

M/U & Purification Sys. Integrity Test & Leak Rate

Determination

71111.15

Procedures

Report No.: 2-BOP-

VE-21-004

Component ID: C SI Nozzle Thermal Sleeve, C SI

Nozzle Thermal Sleeve Detection

10/08/2021

71111.15

Work Orders

WO 2990667, 52997083

71111.24

Calculations

CALC-91-E-0099-13

ECP Hydrographic Survey

71111.24

Corrective Action

Documents

1-2022-00883, 1-2022-02658, 2-2022-00423, 2-2022-

01383, 2-2023-01393, 2-2023-02352, 2-2023-02424, 2-

23-02439, C-2021-01589, C-2022-02560, C-2023-

289, C-2023-03344, 1-2023-1309, 1-2023-1310,

71111.24

Engineering

Changes

EC-49838

2CV-1036-2 Control Wiring Modification

71111.24

Engineering

Changes

EC-58310

2CV-0716-1 Acceptable Normal Range and Limiting

Value Stroke Time Limits for Open Stroke Time to be

Used in OP-2106-006 Supplement 3A

71111.24

Engineering

Changes

EC-90103

P-4B Service Water Acceptance Criteria Rebaseline per

WO 540399

71111.24

Miscellaneous

Unit 1 Station Log

08/03/2023

71111.24

Miscellaneous

ANO Performance Indicator Report for 4Q22

01/18/2023

71111.24

Miscellaneous

ULD-1-SYS-03

Unit 1 125 Volt DC System

71111.24

Miscellaneous

ULD-2-SYS-12

ANO U2 Emergency Feedwater System

71111.24

Procedures

EN-MA-141

Limitorque Valve Operator Model SMB/SB/SBD-000

Through 5 MOV and HBC Periodic Inspection

71111.24

Procedures

OP-1104.005

Unit 2 Reactor Building Spray System Operation

71111.24

Procedures

OP-1104.029

Service Water and Auxiliary Cooling System

27

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.24

Procedures

OP-1104.036

Emergency Diesel Generator Operation

71111.24

Procedures

OP-1107.004

Battery and 125 VDC Distribution

71111.24

Procedures

OP-1304.128

Unit 1 RPS-D/CRD Breaker Trip Test

71111.24

Procedures

OP-1306.019

Annual Emergency Cooling Pond Sounding

71111.24

Procedures

OP-1402.066

24-month inspection of Unit One Emergency Diesel

Generator Engine

71111.24

Procedures

OP-2104.036

Emergency Diesel Generator Operations

104

71111.24

Procedures

OP-2104.037

Alternate AC Diesel Generator Operations

71111.24

Procedures

OP-2106.006

Emergency Feedwater System Operations

110

71111.24

Procedures

OP-2106.012

Electrohydraulic Oil System Operation

71111.24

Work Orders

WO 569303, 52996055, 53004058, 53009255, 53029292,

53029670, 53036465, 53037178, 53037312, 54027672,

54033183, 54039748, 54048783, 52995597, 52996095,

53038477

71114.02

Corrective Action

Documents

CR-ANO-

C-2021-00978, C-2023-01794

71114.02

Miscellaneous

Letter of Agreement Between Entergy Operations, Inc.,

and Radio Station KXRJ

2/14/2022

71114.02

Miscellaneous

KLD TR-1208

Arkansas Nuclear One Alert and Notification System

(ANS) Design Report

2/14/2020

71114.02

Procedures

EP-002

ANO Emergency Planning Desk Guide - Early Warning

System

71114.03

Corrective Action

Documents

CR-ANO-

C-2023-01762, C-2023-01763

71114.03

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-

C-2023-03114

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - March 10, 2022

03/28/2022

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - February 10, 2021

2/11/2021

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - June 25, 2022

06/28/2022

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - June 19, 2021

06/22/2021

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - September 21,

22

09/22/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - September 23,

21

09/28/2021

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - December 4, 2020

2/10/2020

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - December 16, 2021

2/21/2021

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - March 21, 2023

03/21/2023

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - June 25, 2023

06/26/2023

71114.03

Miscellaneous

Form 1903.062C

Emergency Response Staffing Drill - December 19, 2022

2/19/2022

71114.03

Procedures

1903.062

Communications System Operating Procedure

71114.03

Procedures

1903.080

Emergency Operations Facility (EOF) Activation

71114.03

Procedures

EN-EP-310

Emergency Response Organization Notification System

71114.04

Corrective Action

Documents

CR-ANO-

1-2018-04843, 1-2020-01781

71114.04

Miscellaneous

CFR 50.54(q) Screening, Procedure/Document

Number: EPLAN; Revision: 048; Title: ANO Emergency

Plan

04/07/2023

71114.04

Miscellaneous

CFR 50.54(q) Evaluation, Procedure/Document

Number: EPLAN; Revision: 048; Title: ANO Emergency

Plan

04/07/2023

71114.04

Miscellaneous

CFR 50.54(q) Screening, Procedure/Document

Number: OP-1903.010; Revision: 060; Title: Emergency

Action Level Classification

05/24/2022

71114.04

Miscellaneous

CFR 50.54(q) Screening, Procedure/Document

Number: ANO Emergency Plan; Revision: 46; Title: ANO

Emergency Plan

2/18/2021

71114.04

Miscellaneous

CFR 50.54(q)(3) Evaluation, Procedure/Document

Number: OP-1903.010; Revision: 060; Title: Emergency

Action Level Classification

05/04/2022

71114.04

Miscellaneous

CFR 50.54(q)(3) Evaluation, Procedure/Document

Number: ANO Emergency Plan; Revision: 46; Title: ANO

Emergency Plan

2/08/2021

71114.04

Miscellaneous

CFR 50.54(q)(2) Review, Procedure/Document

Number: OP-1903.053; Revision: 009; Title: Logistical

Support

01/27/2021

71114.04

Miscellaneous

CFR 50.54(q)(3) Evaluation, Procedure/Document

11/29/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Number: EN-EP-801; Revision: 018; Title: Emergency

Response Organization

71114.04

Miscellaneous

CFR 50.54(q) Screening, Procedure/Document

Number: 1903.010/1903.010-U1 Wall Chart; Revision:

061/001; Title: Emergency Action Level Classification

01/18/2023

71114.04

Miscellaneous

CFR 50.54(q)(3) Evaluation, Procedure/Document

Number: 1903.010 & 1903.010 U1 WC; Revision: 061 &

001; Title: Emergency Action Level Classifications & Unit

Wall Chart

01/18/2023

71114.04

Miscellaneous

0CAN032301

Emergency Plan Implementing Procedure Revision;

Arkansas Nuclear One - Units 1 and 2; Docket Nos. 50-

313, 50-368, and 72-13; Renewed Operating Facility

License Nos. DPR-51 and NPF-6

03/02/2023

71114.04

Miscellaneous

0CAN052302

Arkansas Nuclear One (ANO) Emergency Plan Rev. 48;

Arkansas Nuclear One - Units 1 and 2; NRC Docket

Nos. 50-313 and 50-368; Renewed Facility Operating

License Nos. DPR-51 and NPF-6

05/11/2023

71114.04

Miscellaneous

1CNA122203

Arkansas Nuclear One, Unit 1 - Issuance of Amendment

No. 278; RE: Revision to Technical Specifications 3.4.12

and 3.4.13 Based on Revised Dose Calculations (EPID

L-2021-LLA-0181)

2/09/2022

71114.04

Procedures

EN-EP-305

Emergency Planning 10CFR50.54(q) Review Program

71114.04

Procedures

OP-1903.010

Emergency Action Level Classification

59, 60, 61

71114.05

Corrective Action

Documents

CR-ANO-

1-2021-00341, 1-2021-03102, 1-2022-01040, 1-2022-

01068, 1-2022-02978, 1-2023-00172, 1-2023-00183, 1-

23-00221, 1-2023-00273, 1-2023-00383, 1-2023-

00410, 1-2023-01045, 2-2022-00042, 2-2022-01132, 2-

23-00245, 2-2023-01937, 2-2023-02189, 2-2023-

250, C-2021-02305, C-2022-01881, C-2022-02072,

C-2022-02272, C-2022-02351, C-2022-02492, C-2022-

2505, C-2022-03107, C-2023-00964

71114.05

Corrective Action

Documents

CR-ANO-

C-2023-03166, C-2023-03168, C-2023-03178

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Resulting from

Inspection

71114.05

Miscellaneous

ETE Update State and Local Agreement

03/20/2023

71114.05

Miscellaneous

23TTD3 Blue Team Tabletop Drill, Entergy Corporation,

Arkansas Nuclear One, 8/29/23

08/29/2023

71114.05

Miscellaneous

Arkansas Nuclear One (ANO) HP/RP Environmental Drill

Report, 08/06/2020

09/08/2020

71114.05

Miscellaneous

Arkansas Nuclear One HP/Post Accident Drill Report,

08/04/2020

09/08/2020

71114.05

Miscellaneous

Arkansas Nuclear One (ANO) Onsite Medical Drill

Report, 10/13/2020

10/26/2020

71114.05

Miscellaneous

ANO (Arkansas Nuclear One) ERO Green Team Site

Drill Report, 11/11/2020

2/03/2020

71114.05

Miscellaneous

23 ANO Health Physics - In Plant Monitoring (First

Half), Entergy Corporation, Arkansas Nuclear One,

06/07/2023

06/19/2023

71114.05

Miscellaneous

ANO 2023 Red Team 2nd Quarter PI Drill, Entergy

Corporation, Arkansas Nuclear One, 06/22/2023

06/28/2023

71114.05

Miscellaneous

EOF 4th Quarter - PI Drill Green Team, Entergy

Corporation, Arkansas Nuclear One, 12/16/2021

01/06/2022

71114.05

Miscellaneous

Arkansas Nuclear One (ANO) 10 CFR 50.54(h)(h)(2)

Drill Report, 03/31/2021

04/20/2021

71114.05

Miscellaneous

Arkansas Nuclear One (ANO) HP/RP Environmental Drill

Report, 06/03/2021

06/24/2021

71114.05

Miscellaneous

Arkansas Nuclear One HP/Post Accident Drill Report,

03/09/2021

04/07/2021

71114.05

Miscellaneous

Onsite Medical Drill/HP Drill 12-6-2021, Entergy

Corporation, Arkansas Nuclear One, 12/06/2021

03/10/2022

71114.05

Miscellaneous

ANO 2022 Environmental (Radiological Monitoring),

Entergy Corporation, Arkansas Nuclear One, 06/01/2022

06/28/2022

71114.05

Miscellaneous

ANO 2022 Health Physics - In Plant Monitoring (First

Half), Entergy Corporation, Arkansas Nuclear One,

06/16/2022

06/29/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Miscellaneous

ANO 2022 Health Physics - In Plant Monitoring (Second

Half), Entergy Corporation, Arkansas Nuclear One,

2/06/2022

2/13/2022

71114.05

Miscellaneous

Onsite Medical Drill 12/6/2022, Entergy Corporation,

Arkansas Nuclear One, 12/06/2022

05/04/2023

71114.05

Miscellaneous

ANO 2022 Post Accident Sampling Drill, Entergy

Corporation, Arkansas Nuclear One, 12/08/2022

01/04/2023

71114.05

Miscellaneous

CNRO2022-00016

Evacuation Time Estimate Reports

09/12/2022

71114.05

Miscellaneous

EP-005

Control Room Emergency Response Facility

Walkthrough, March 20, 2021

03/29/2021

71114.05

Miscellaneous

EP-008

EOF Emergency Response Facility Walkthrough, March

16, 2022

03/18/2022

71114.05

Miscellaneous

EP-020

JIC Emergency Response Facility Walkthrough,

February 9, 2023

2/13/2023

71114.05

Miscellaneous

EP-2021-033

1903.004-G Annual EAL Review

2/14/2021

71114.05

Miscellaneous

Form 1903.004-M

ETE Update

04/02/2023

71114.05

Miscellaneous

KLD TR-1167

Arkansas Nuclear One 2020 Population Update Analysis

09/19/2020

71114.05

Miscellaneous

NQ-2021-007

QA Audit Report QA-07-2021-ANO-1, 2021 QA Audit of

Emergency Preparedness at Arkansas Nuclear One

(ANO)

05/06/2021

71114.05

Miscellaneous

NQ-2023-008

QA Audit Report QA-7-2023-ANO-1, 2023 QA Audit of

Emergency Preparedness Programs at Arkansas

Nuclear One (ANO)

05/11/2023

71114.05

Miscellaneous

QS-2022-ANO-002

Quality Assurance Surveillance Report, Activity: 2022

Emergency Preparedness Surveillance, Dates: 3/28/22

to 4/4/22

04/04/2022

71114.05

Procedures

1903.062

Communications System Operating Procedure

71114.05

Procedures

1903.069

Equipment Important to Emergency Response

9, 10

71114.05

Procedures

1904.002

Offsite Dose Projections

71114.05

Procedures

EN-EP-202

Equipment Important to Emergency Response (EITER)

71114.05

Procedures

EN-EP-202-01

ANO EITER Matrix

71114.05

Procedures

EN-EP-306

Drills and Exercises

71114.05

Procedures

EN-EP-603

Declared Emergency Recovery and Re-entry

71114.05

Procedures

EN-EP-610

Technical Support Center (TSC) Operations

7, 8

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Procedures

EN-FAP-EP-005

Emergency Preparedness Performance Indicators

13-17

71114.05

Procedures

EN-FAP-LI-001

Performance Improvement Review Group (PRG)

Process

71114.05

Procedures

EN-LI-102

Corrective Action Program

71114.05

Procedures

EN-LI-121

Tending and Performance Review Process

71114.05

Procedures

EN-QV-109

Audit Process

71114.05

Procedures

OP-1903.004

Admin. & Maintenance of Emergency Plan &

Implementing Procedures

71114.05

Procedures

OP-1903.080

Emergency Operations Facility (EOF) Activation

71114.05

Work Orders

Work Order Number

535066, 566529, 581716, 582258, 591346, 596438,

54030331

71114.06

Procedures

OP-1903.010

Emergency Action Level Classification

71114.06

Procedures

OP-1903.011

Emergency Response/Notifications

71114.06

Procedures

OP-2203.024

Loss of Turbine Load

71151

Corrective Action

Documents

CR-ANO-

C-2022-03406, C-2023-00782, C-2023-00779

71151

Miscellaneous

Blue Team EOF PI Drill, Entergy Corporation, Arkansas

Nuclear One, 09/01/2022

09/14/2022

71151

Miscellaneous

Red Team EOF PI Drill, Entergy Corporation, Arkansas

Nuclear One, 12/01/2022

2/12/2022

71151

Miscellaneous

Blue Team EOF PI Drill, Entergy Corporation, Arkansas

Nuclear One, 12/06/2022

2/12/2022

71151

Miscellaneous

23 ANO 23FSD1 Green Team, Entergy Corporation,

Arkansas Nuclear One, 03/07/2023

04/06/2023

71151

Miscellaneous

23 ANO 23FSD2 Yellow Team, Entergy Corporation,

Arkansas Nuclear One, 06/06/2023

06/26/2023

71151

Miscellaneous

ANO Performance Indicator Report for 3Q22

10/12/2022

71151

Miscellaneous

ANO Performance Indicator Report for 1Q23

04/20/2023

71151

Miscellaneous

ANO Performance Indicator Report for 2Q23

07/18/2023

71151

Procedures

EN-EP-801

Emergency Response Organization

71151

Procedures

EN-FAP-EP-005

Emergency Preparedness Performance Indicators

71151

Procedures

EN-LI-114

Regulatory Performance Indicator Process

17-21

71151

Procedures

EP-019

Emergency Planning Performance Indicators

5, 6, 7

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152S

Corrective Action

Documents

CR-ANO-

C-2023-03025

71153

Corrective Action

Documents

CR-ANO-

2-2023-02453, 2-2023-02457

71153

Procedures

OP-2102.004

Power Operation

71153

Procedures

OP-2103.018

RCS Flow Rate Calculation

71153

Procedures

OP-2203.025

RCP Emergencies

21