October 22, 2020

SUBJECT:

ARKANSAS NUCLEAR ONE - SECURITY BASELINE INSPECTION REPORT 05000313/2020411 AND 05000368/2020411

Dear Mr. Dinelli:

On October 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One and discussed the results of this inspection with Mr. J. Sullivan, General Manager, Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000313 and 05000368

License Numbers:

DPR-51 and NPF-6

Report Numbers:

05000313/2020411 and 05000368/2020411

Enterprise Identifier: I-2020-411-0000

Licensee:

Entergy Operations

Facility:

Arkansas Nuclear One

Location:

Russellville, AR

Inspection Dates:

October 5, 2020 to October 8, 2020

Inspectors:

C. Jewett, Physical Security Inspector

R. Lanfear, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: Requirements (02.11 a-d)
  • Tier III: None

71130.07 - Security Training

Security Training (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: Requirements (02.05 a-d, 02.07, 02.08 a, 02.09 a-b)
  • Tier III: Requirements (02.11 a, 02.012 a-b, 02.13 a)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 8, 2020, the inspectors presented the security baseline inspection results to Mr. J. Sullivan, General Manager, Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

CR-ANO-C-2019-02612, CR-ANO-C-2019-01100, CR-ANO-

C-2020-00818, CR-ANO-C-2020-00320, CR-ANO-C-2020-

01618, CR-ANO-1-2020-01143,

Various

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-C-2020-02733, CR-ANO-C-2020-02736

10/07/2020

Drawings

10G-16A-E-66

One Line Diagram Admin UPS System

04/26/2011

Miscellaneous

Alarm History

Reports and video

Various

STM 1-33

Security Electrical Distribution

Operability

Evaluations

Form 1043.015B

Performance Testing of Intrusion Detection System

04/05/2020

Procedures

EN-NS-212

Weapons Maintenance Accountability Program

006

OP-1043.012

Testing of Security Equipment

OP-1043.013

Communications Checks and Equipment Issues/ Inventory/

Inspection

OP-1043.015

Testing Intrusion Detection Systems

053

OP-1043.016

Operational Test of Access Control Equipment

Work Orders

MWO 50235066-

01,

Performance Preventative Measure on Security Microwave

Detectors

04/15/2020

WO 52881524,

WO 52822982,

WO 52760186

Annual Vehicle Barrier System Field Inspection Report

05/24/2018

71130.07

Corrective Action

Documents

CR-ANO-C-2017-04142, CR-ANO-C-2019-00767, CR-ANO-

C-2019-00800, CR-ANO-C-2019-01339, CR-ANO-C-2019-

04704

Corrective Action

Documents

Resulting from

Inspection

CR-ANO-C-2020-02725, CR-ANO-C-2020-02726, CR-HQN-

20-01946

Miscellaneous

QA-16-2019-

Security Quality Assurance Audit Report

2/05/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ANO-1

Procedures

EN-NS-300

Security Training Program

EN-NS-301

Security Systematic Approach to Training

EN-NS-303

Security Training Oversight Program

EN-NS-304

Security On-the-Job Training, Task Performance Evaluation,

and Training exemptions

EN-NS-307

Security Supervisor Training and Development Program

Self-Assessments LO-ALO-2019-

00088

IP 71130.07 Security Training Self-Assessment

06/24/2020