January 26, 2023

SUBJECT:

ARKANSAS NUCLEAR ONE - INTEGRATED INSPECTION REPORT 05000313/2022004 AND 05000368/2022004

Dear Joseph Sullivan:

On December 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One. On January 12, 2023, the NRC inspectors discussed the results of this inspection with Doug Pehrson, General Manager Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000313, 05000368 License Nos. DPR51, NPF6

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000313 and 05000368

License Numbers:

DPR-51 and NPF-6

Report Numbers:

05000313/2022004 and 05000368/2022004

Enterprise Identifier:

I-2022-004-0005

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One

Location:

Russellville, AR

Inspection Dates:

October 1, 2022, to December 31, 2022

Inspectors:

C. Alldredge, Health Physicist

N. Brown, Resident Inspector

R. Bywater, Senior Resident Inspector

T. DeBey, Resident Inspector

J. Drake, Senior Reactor Inspector

J. O'Donnell, Senior Health Physicist

Approved By:

John L. Dixon, Jr., Chief

Projects Branch D

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at approximately 73 percent power in an end of operating cycle power coast down. On October 7, 2022, Unit 1 operators initiated a power reduction and took the unit offline to begin a planned refueling outage on October 8, 2022. Unit 1 operators made the reactor critical at the end of planned outage activities on November 23, 2022.

However, when the operators attempted to place the main generator in service at approximately 16 percent power on November 24, 2022, the exciter failed. Unit 1 operators shut down the reactor the same day and began a reactor coolant system cooldown to Mode 5. After replacing the exciter and completing emergent seal replacement and post-maintenance testing on the B decay heat/low pressure injection pump, Unit 1 operators completed heatup of the reactor coolant system and made the reactor critical on December 29, 2022. The main generator was successfully placed in service on December 30, 2022. The unit was held at approximately 37 percent power to repair a steam leak on the B main feedwater pump piping. Following completion of the repair, Unit 1 was in power ascension at approximately 40 percent power at the end of the inspection period.

Unit 2 began the inspection period at full power. On October 31, 2022, Unit 2 operators reduced power to approximately 75 percent at the request of the grid operator to reduce station output.

Operators returned the unit to full power on November 2, 2022, and continued operating at full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk-significant activities, and completed onsite portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather during a tornado warning in the local area on November 3, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 service water loop 1 during maintenance on service water cross-tie valve CV-3646 on October 31, 2022
(2) Unit 2 steam dump and bypass control system after problems with condenser interlock on December 22, 2022
(3) Unit 1 motor-driven emergency feedwater pump P-7B while decay heat removal pump P-34B was out of service for repair on December 23, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 A3 vital 4160 Vac switchgear room, fire zone 100N, on October 25, 2022
(2) Unit 1 diesel fuel vault, fire zone 1031, on November 9, 2022
(3) Unit 2 motor-generator room, fire zone 2076HH, on November 14, 2022
(4) Unit 1 main steam isolation and main steam safety valve room, fire zone 170Z, on December 9, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Unit 1 electrical equipment room RM-111 on December 15, 2022

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

(1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from October 10, 2022, to November 30, 2022:

03.01.a - Nondestructive Examination and Welding Activities.

ultrasonic examination, main feedwater 27-013, 1EBB-1, elbow to pipe weld

ultrasonic examination, main feedwater 27-013, 1EBB-1, pipe to elbow weld

ultrasonic examination, main steam, CV-2613, FW-203, pipe to valve

ultrasonic examination, main steam, CV-2613, FW-204, valve to pipe

ultrasonic examination, make up system, 1CCA-5 pipe, MU-45C base metal repair, BMR-1, BMR-2, BMR-3, BMR-4, BMR-5

radiographic examination, MUP A-10050, high pressure injection nozzle thermal sleeve (C)

radiographic examination, MUP A-10051, high pressure injection nozzle thermal sleeve (D)radiographic examination, MUP A-10052, high pressure injection nozzle thermal sleeve (A)

radiographic examination, MUP A-10053, high pressure injection nozzle thermal sleeve (B)

radiographic examination, make up system, 1CCA-5 pipe, MU-45C base metal repair, BMR-1, BMR-2, BMR-3, BMR-4, BMR-5

dye penetrant examination, make up system, 1CCA-5 pipe, MU-45C base metal repair, BMR-1, BMR-2, BMR-3, BMR-4, BMR-5

VT-2 visual examination of containment moisture barrier

VT-2 visual examination of M-310 pressurizer heater bundle bolts, 5 rejected

weld packages and/or records reviewed, work order 572860, Unit 1 auxiliary cooling water flange, FW-1, work order 572860, Unit 1 auxiliary cooling water flange, FW-2, work order 00587076, make up system, 1CCA-5 pipe, MU-45C base metal repair, BMR-1, BMR-2, BMR-3, BMR-4, BMR-5 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities.

The inspector reviewed the following corrective action records associated with boric acid leaks and evaluations: ANO-1-2021-3047, ANO-1-2019-02716, ANO-1-2021-00812, ANO-1-2021-00813, ANO-1-2021-00815, ANO-1-2021-00821, ANO-1-2021-00849, ANO-1-2021-00852, ANO-1-2021-00867, ANO-1-2021-00878 Problem Identification and Resolution

The inspector reviewed 70 notifications associated with in service and operating experience issues. No findings or violations of more than minor significance were identified.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 power reduction and unit shutdown on October 8, 2022.
(2) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 stroke testing of safety-related service water motor-operated valves on December 2, 2022, and during core protection calculator functional tests on December 21, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)

(1) The inspectors observed and evaluated a Unit 2 simulator scenario of a control element assembly misalignment followed by a control element assembly drop and reactor trip on November 17, 2022.
(2) The inspectors observed and evaluated Unit 1 simulator scenario of degraded power and loss of 125 Vdc on December 14, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2, service water system functional failure resulting from failure of spent fuel pool heat exchanger service water outlet check valve, 2SW-45B, on October 27, 2022
(2) Unit 1, emergency diesel generator K-4A air start motor replacement and testing after failure on November 8, 2022
(3) Unit 1, reactor building equipment hatch, C-1, maintenance and testing after failure on December 16, 2022
(4) Unit 1, reactor building personnel hatch, C-4, maintenance and testing after failure on December 16, 2022

Aging Management (IP Section 03.03) (1 Sample)

The inspectors evaluated the effectiveness of the aging management program for the following SSCs that did not meet their inspection or test acceptance criteria:

(1) Unit 1 thickness measurement of an excavated and removed portion of buried service water supply piping from the emergency cooling pond completed on October 23, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 elevated risk due to removing portions of emergency diesel generator A starting air system from service for preventive maintenance on starting air compressor discharge check valve FO-54A1 on October 3, 2022
(2) Unit 1 emergent work and elevated risk due to polar crane failure while in lowered inventory with short time-to-boil and severe weather warning on October 12, 2022
(3) Unit 2 emergent issue and risk management due to reactor pressure vessel head seal leakage on October 14, 2022
(4) Unit 1 risk management during fuel reload on October 31, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 turbine driven emergency feedwater pump operability assessment due to loss of local speed indication on November 1, 2022
(2) Unit 1 control rod drop times after refueling outage and re-assembly of rod drives on November 11, 2022
(3) Unit 2 shutdown margin verification completed due to inoperable control element assembly on November 29, 2022
(4) Unit 1 reactor vessel head fluid temperature instrumentation functionality due to loss of A channel and intermittent loss of B channel indications on November 30, 2022

71111.18 - Plant Modifications

Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)

(1) The inspectors verified the site Severe Accident Management Guidelines were updated in accordance with the pressurized water reactor generic severe accident technical guidelines and validated in accordance with NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents, revision 1, on December 14, 2022.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) Unit 1 main steam safety valve testing after inspection on October 6, 2022
(2) Unit 1 and Unit 2 security diesel generator K-9, following repair activities, on November 9, 2022
(3) Unit 1 low-pressure injection pump P-34B after seal replacement during outage, on November 16, 2022
(4) Unit 1 emergency diesel generator K-4B after air start motor replacement on November 17, 2022
(5) Unit 1 emergency diesel generator K-4A after 6-year inspection activities on December 14, 2022

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated Unit 1 refueling outage 30 activities from October 1 to December 30, 2022. The inspectors completed the remaining sections of the inspection procedure sections 03.01.b through 03.01.e.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Unit 1 containment sump isolation valve CV-1414, on November 7,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee instructs workers on plant-related radiological hazards and the radiation protection requirements intended to protect workers from those hazards.

Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)

The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:

(1)licensee surveys of potentially contaminated material leaving the radiologically controlled area (2)workers exiting the Unit 1 containment building during a refueling outage

Radiological Hazards Control and Work Coverage (IP Section 03.04) (4 Samples)

The inspectors evaluated the licensee's control of radiological hazards for the following radiological work:

(1)removal of pressurizer heater 309 using radiation work permit (RWP) 2022-1502 (2)removal of pressurizer heater 308 using RWP 2022-1502 (3)removal of the reactor coolant pump P-32B impeller using RWP 2022-1500 (4)removal of the decay heat pump P-34B seals using RWP 2022-1506 High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (5 Samples)

The inspectors evaluated licensee controls of the following High Radiation Areas (HRA) and Very High Radiation Areas (VHRA):

(1) VHRA - Unit 1 containment building in-core tunnel on the 335-foot elevation
(2) HRA - Unit 1 containment building access to the in-core tunnel on the 335-foot elevation
(3) HRA - Unit 1 containment building DH-1001 valve above the in-core tunnel on the 335-foot elevation
(4) HRA - Unit 1 auxiliary building F-2 filter room on the 335-foot elevation
(5) HRA - Unit 1 auxiliary building T-5 tank room on the 335-foot elevation Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Unit 1 control room emergency ventilation unit VSF-9

Temporary Ventilation Systems (IP Section 03.02) (1 Sample)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) Unit 1 HEPA filtration associated with radiation work permit 2022-1501 for 1R30 pressurizer heater bundle/cable replacement (M-308, M-309, M-310)

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees use of respiratory protection devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Shipment Preparation (IP Section 03.04)

(1) The inspectors observed the preparation of radioactive shipment RSR 22-066 on October 17, 2022. This was an exclusive use shipment of a surface contaminated object (SCO-II) packaged in a B-25 metal box.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS09: Residual Heat Removal Systems (IP Section 02.08)===

(1) Unit 1 (October 1, 2021, through September 30, 2022)
(2) Unit 2 (October 1, 2021, through September 30, 2022)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (October 1, 2021, through September 30, 2022)
(2) Unit 2 (October 1, 2021, through September 30, 2022)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) Unit 1 and Unit 2 (January 1, 2021, through September 30, 2022)

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) Unit 1 and Unit 2 (January 1, 2021, through September 30, 2022)

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in performance of the Unit 1 and Unit 2 alternate ac generator that might be indicative of a more significant safety issue. No findings or violations of more than minor significance were identified.
(2) The inspectors reviewed the licensees corrective action program for potential adverse trends in the implementation of the 10 CFR Part 21 reportability program that might be indicative of a more significant safety issue. An observation identified during this review is documented in the Inspection Results section of this report.

INSPECTION RESULTS

Observation: Semiannual Trend Review of 10 CFR Part 21 Program Screenings 71152S The inspectors performed a review of potential adverse trends in the licensees corrective action program with emphasis on the implementation of the licensees 10 CFR Part 21 program. The inspectors sampled a population of condition reports during the period of January 1 through September 30, 2022. Based on the samples reviewed, the inspectors identified an observation where the licensee may not properly screen condition reports for Part 21 applicability. The inspectors noted potential confusion in the implementation of Procedure EN-LI-108-01, 10 CFR 21 Evaluations and Reporting, with respect to screenings for Part 21 applicability for components not installed in the plant. The inspectors discussed an example of Part 21 screening of a nonconforming condition of a component discovered prior to installation. The licensee initiated Condition Report CR-ANO-1-2022-01509 to address the issue. The subsequent screening determined that there was no Part 21 applicability. The inspectors also noted a potential interface problem between Procedure EN-LI-102, Corrective Action Program, and procedure EN-LI-108-01 because there was no direction to enter procedure EN-LI-108-01, to screen for Part 21 applicability, from the corrective action program procedure EN-LI-102. The licensee addressed this observation via condition report CR-HQN-2022-01688. No findings or violations of more than minor significance were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 21, 2022, the inspectors presented the occupational radiation safety inspection results to David Oertling, Operations Director, and other members of the licensee staff.

On December 6, 2022, the inspectors presented the Unit 1 inservice inspection results to Frank Shewmake, Operations Director, and other members of the licensee staff.

On January 12, 2023, the inspectors presented the integrated inspection results to Doug Pehrson, General Manager Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

EN-FAP-EP-010

Severe Weather Response

71111.01

Procedures

OP-1203.025

Natural Emergencies

71111.04

Calculations

CALC-

980409E201-01

Steam Dump Bypass System Capacity

71111.04

Corrective Action

Documents

CR-ANO-

1-2022-02475, 2-2021-01413, 2-2021-02944, 2-2021-03383,

2-2021-03395

71111.04

Drawings

M-204, Sheet 3

Emergency Feedwater

71111.04

Drawings

M-204, Sheet 5

Emergency Feedwater Storage

71111.04

Drawings

M-209, Sheet 1

Circ. Water, Service Water, & Fire Water Intake Structure

Equipment

115

71111.04

Drawings

M-210, Sheet 1

Service Water

155

71111.04

Engineering

Changes

EC-0042284

Condenser Vacuum Pump Auto-Start Setpoint Change

71111.04

Miscellaneous

STM 1-42

Service & Auxiliary Cooling Water

71111.04

Procedures

OP-1104.029

Service Water and Auxiliary Service Water System

27

71111.04

Procedures

OP-1106.006

Emergency Feedwater Pump Operation

20

71111.04

Procedures

OP-2102.002

Plant Heatup

71111.04

Procedures

OP-2105.008

Steam Dump and Bypass Control System Operations

71111.05

Corrective Action

Documents

CR-ANO-

1-2018-01938, 1-2020-00278, 1-2022-03070, 1-2022-03071,

1-2022-03078, 2-2022-02221, C-2014-02183, C-2022-00229

71111.05

Drawings

FP-101, Sheet 1

Fire Zones Fuel Handling Floor Plan EL 404-0 and 422-0

71111.05

Miscellaneous

PFP-U1_R021

Unit 1 Prefire Plan

71111.05

Miscellaneous

PFP-U2_R017

Unit 2 Prefire Plan

71111.05

Procedures

AOP-2203.049

Fires in Areas Affecting Safe Shutdown Technical Guidelines

71111.05

Procedures

EN-DC-127

Control of Hot Work and Ignition Sources

71111.05

Procedures

EN-DC-161

Control of Combustibles

71111.05

Procedures

OP-1003.005

Fire Prevention Inspection

71111.06

Calculations

CALC-95R-0024-

Station Doors and Hatches

71111.06

Calculations

CALC-ANOC-CS-

15-00003

ANO Flood Protection Design Basis

71111.06

Calculations

CALC-ANOC-CS-

ANO Flood Protection Room Evaluations - Units 1 and 2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

15-00012

Basic Requirements for the Component Database on Station

Doors and Hatches

71111.06

Drawings

FP-103, Sheet 1

Intermediate Floor Plan EL 368-0 and 372-0

71111.06

Miscellaneous

FHA

Arkansas Nuclear One Fire Hazards Analysis

71111.08P

Calculations

CALC-89D-1045

Evaluate Service Water Return Piping to Determine

Adequacy of Code Using Multiple Response Spectra and

Revised Temperatures

71111.08P

Calculations

CALC-92D-1019

Code Qualification for Service Water Return Piping from

E35B

71111.08P

Calculations

CALC-93R-1011-

Review of the Programs Credited in The License Renewal

Evaluations

001-03-0

71111.08P

Calculations

CALC-A2EP-2002-

2

ANO-2 License Renewal Project Evaluation of Aging

Management Programs

71111.08P

Corrective Action

Documents

CR-ANO-

1-1995-00239, 1-2005-01648, 1-2010-01275, 1-2011-01728,

1-2011-02533, 1-2015-00171, 1-2015-00304, 1-2015-04207,

1-2016-00097, 1-2017-01621, 1-2017-01625, 1-2019-02716,

1-2019-03919, 1-2020-00252, 1-2022-00566, 1-2021-00812,

1-2021-00813, 1-2021-00815, 1-2021-00821, 1-2021-00849,

1-2021-00852, 1-2021-00867, 1-2021-00872, 1-2021-00873,

1-2021-00878, 1-2021-00969, 1-2021-00971, 1-2021-00972,

1-2021-01002, 1-2021-01006, 1-2021-01051, 1-2021-01123,

1-2021-01131, 1-2021-01135, 1-2021-01205, 1-2021-01209,

1-2021-01229, 1-2021-01350, 1-2021-01352, 1-2021-01356,

1-2021-01359, 1-2021-01363, 1-2021-01367, 1-2021-01370,

1-2021-01377, 1-2021-01393, 1-2021-01479, 1-2021-01528,

1-2021-01555, 1-2021-01566, 1-2021-01945, 1-2021-01948,

1-2021-02066, 1-2021-02229, 1-2021-02475, 1-2021-02644,

1-2021-02689, 1-2021-02871, 1-2021-02872, 1-2021-02873,

1-2021-02880, 1-2021-02923, 1-2021-03026, 1-2021-03047,

1-2021-03063, 1-2021-03235, 1-2021-03284, 1-2022-00327,

1-2022-00380, 1-2022-00845, 1-2022-00938, 1-2022-01069,

1-2022-01476, 1-2022-01616, 1-2022-01696,

71111.08P

Corrective Action

Documents

CR-ANO-

1-2022-01696, 1-2022-01744, 1-2022-01818, C-2022-03010

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Resulting from

Inspection

71111.08P

Drawings

7DH-3, Sheet 1

Large Pipe Isometric Decay Heat Removal from Reactor

71111.08P

Drawings

M-2219_SH5

Piping and Instrument Diagram Unit One / Unit Two Outside

Fire Water Loop

71111.08P

Engineering

Changes

EC 83615

Address SIPD 8318 FOR MU-45C & MU-34

C. CCA-5-2 1/2",

CCB-5-2 1/2"Excessive Piping Vibration. Install 5

Viscoelastic Dampers (GERB Viscodamper). Vent Stacks.

Modify MU-208H1.

71111.08P

Engineering

Changes

EC 86386

Update U1 And U2 Insulation Specifications to Allow The

Use Of Protective Sleeves In Areas Of Pipe Fretting Damage

71111.08P

Miscellaneous

PS-S-005

Piping Thresholds and Tolerances

71111.08P

Miscellaneous

SEP-ISI-ANO1-101

Program Section for ASME Section Xi, Division 1 ANO 1

Inservice Inspection Program

71111.08P

NDE Reports

1BOP-UT-22-035

UT Thickness Examination of MU-45C

10/23/2022

71111.08P

Procedures

1104029.127A

Service Water and Auxiliary Cooling System

27

71111.08P

Procedures

1305.037

Unit 1 Reactor Building Access & Ventilation Leak Rate

Testing

71111.08P

Procedures

1504021.016

Fuel Transfer Tube Cover Removal and Installation

71111.08P

Procedures

CEP-APJ-001

Primary Containment Leakage Rate Testing (10CFR50

Appendix J) Program Plan

71111.08P

Procedures

CEP-BAC-001

Boric Acid Corrosion Control (BACC) Program Plan

71111.08P

Procedures

CEP-NDE-0255

Radiographic Examination ASME, ANSI, AWS, API, AWWA

Welds and Components

71111.08P

Procedures

CEP-NDE-0404

Manual Ultrasonic Examination of Ferritic Piping Welds

(ASME XI)

71111.08P

Procedures

CEP-NDE-0407

Straight Beam Ultrasonic Examination of Bolts and Studs

(ASME XI)

71111.08P

Procedures

CEP-NDE-0423

Manual Ultrasonic Examination of Austenitic Piping Welds

(ASME XI)

71111.08P

Procedures

CEP-NDE-0504

Ultrasonic Examination of Small Bore Diameter Piping for

Thermal Fatigue Damage

71111.08P

Procedures

CEP-NDE-0901

VT-1 Examination

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.08P

Procedures

CEP-NDE-0902

VT-2 Examination

71111.08P

Procedures

CEP-NDE-0903

VT-3 Examination

71111.08P

Procedures

CEP-NDE-0955

Visual Examination (VE) of Bare-Metal Surfaces

308

71111.08P

Procedures

DR-ECH-

WPS_CS_1_1_A

000

CEP-WP-002, Welding Procedure Specification

71111.08P

Procedures

DR-ECH-

WPS_SS_8_8_B

000

CEP-WP-002, Welding Procedure Specification

71111.08P

Procedures

EN-DC-319

Boric Acid Corrosion Control Program (BACCP)

71111.08P

Procedures

EN-DC-334

Primary Containment Leakage Rate Testing (Appendix J)

71111.08P

Procedures

EN-LI-102

Corrective Action Program

71111.08P

Procedures

EN-OP-104

Operability Determination Process

71111.08P

Procedures

EN-RP-401

Decontamination Program

71111.08P

Procedures

NEI 03-08

Materials Initiative Process

71111.08P

Procedures

SEP-APJ-002

Primary Containment Leakage Rate Testing (Appendix J)

Program Section

9, 10

71111.08P

Procedures

SEP-BAC-ANO-001

Boric Acid Corrosion Control Program Inspection and

Identification of Boric Acid Leaks For ANO-1 And ANO-2

71111.08P

Procedures

SEP-CISI-ANO-101

Program Section for ASME Section XI, Division 1 ANO-1

Containment Inservice Inspection Program

71111.08P

Procedures

SEP-ISI-ANO1-101

Program Section for ASME Section XI, Division 1 ANO 1

Inservice Inspection Program

71111.08P

Work Orders

WO 28422

71111.11Q

Procedures

OP-2104.001

Safety Injection Tank Operations

71111.11Q

Procedures

OP-2104.029

Service Water System Operations

24

71111.11Q

Procedures

OP-2203.003

CEA Malfunction

71111.11Q

Procedures

OP-2607.015

Unit 2 Safety Injection Tank Sampling

71111.11Q

Work Orders

WO 53000929, 53015163

71111.12

Calculations

CALC-22E-0002-

Unit 1 ECP Supply 36 Flaw Handbook

71111.12

Corrective Action

Documents

CR-ANO-

1-2022-00216, 1-2022-01544, 1-2022-01573, 1-2022-01614,

1-2022-01773, 1-2022-02234, 1-2022-02292, 1-2022-02451,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1-2022-02585, 1-2022-02648, 1-2022-02678, 1-2022-02692,

1-2022-02746, 1-2022-02798, 2-2021-03378, 2-2022-00052,

2-2022-00157, 2-2022-01215, C-2021-01589, C-2022-

00181, C-2022-02560, C-2022-03226,

71111.12

Drawings

C-2026A, Sheet 32

Underground Utilities

71111.12

Engineering

Evaluations

1BOP-UT-22-037

ECP-SPOOL PIECE

10/23/2022

71111.12

Miscellaneous

EC-00079818

Update Ultimate Heat Sink Analysis

71111.12

Miscellaneous

SA 09-010

Starter Motor Bracket & Ring Gear Qualification & Alignment

05/08/2009

71111.12

Miscellaneous

ULD-0TOP-27

Ultimate Heat Sink Analysis

71111.12

Procedures

OP-1104.036

Emergency Diesel Generator Operation

71111.12

Procedures

OP-1305.037

Unit 1 Reactor Building Access & Ventilation Leak Rate

Testing

71111.12

Procedures

OP-1306.019

Annual Emergency Cooling Pond Sounding

71111.12

Procedures

OP-1402.038

Unit 1 Equipment Hatch Opening, Closing and Maintenance

71111.12

Work Orders

WO 534538, 586800, 588161, 588261, 52981596, 52983233,

2983931, 52987468

71111.13

Corrective Action

Documents

CR-ANO-

1-2022-01674, 1-2022-01735, 2-2022-01918

71111.13

Drawings

M-217, Sheet 4

Emergency Diesel Generator K-4A/K-4B Starting Air System

71111.13

Miscellaneous

Unit 1 Station Logs

10/31/2022

71111.13

Miscellaneous

1R30 ORAT

Outage Risk Assessment Team Report

71111.13

Miscellaneous

EN-FAP-OM-029

Adverse Condition Monitoring and Contingency Planning

71111.13

Miscellaneous

U2 ACMP

Reactor Head O-Ring Leak

71111.13

Procedures

COPD-024

Risk Assessment Guidelines

71111.13

Procedures

EN-FAP-EP-010

Severe Weather Response

71111.13

Procedures

EN-OU-108

Shutdown Safety Management Program (SSMP)

71111.13

Procedures

OP-1015.048

Shutdown Operations Protection Plan

71111.13

Procedures

OP-1104.036

Emergency Diesel Generator Operation

71111.13

Procedures

OP-2203.012J

Annunciator 2K10 Corrective Action

71111.13

Procedures

OP-2305.002

Reactor Coolant System Leak Detection

71111.13

Work Orders

WO 587126

71111.15

Calculations

2103.015,

Shutdown Margin Calculation

11/29/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Worksheet 4

71111.15

Corrective Action

Documents

CR-ANO-

1-2021-02157, 1-2021-02798, 1-2022-01929, 1-2022-02719,

1-2022-02870, 1-2022-02876, 1-2022-02951, 2-2022-02143,

1-2022-02416

71111.15

Drawings

M-204, Sheet 6

EFW Pump Turbine

71111.15

Engineering

Evaluations

95R-1007-0

ANO-1 ICCMDS Functional Requirements Specification

03/15/2002

71111.15

Miscellaneous

Unit 2 Station Logs

11/29/2022

71111.15

Miscellaneous

Unit 2 Technical Specifications

331

71111.15

Miscellaneous

ASB-1203.002

ANO-1 Alternate Shutdown Procedure 1203.002 Basis

Document

71111.15

Miscellaneous

STM 1-27

Emergency Feedwater System

71111.15

Miscellaneous

ULD-1SYS-24

ANO Unit 1 Inadequate Core Cooling System

71111.15

Procedures

2103.015

Reactivity Balance Calculation

71111.15

Procedures

EOP-1202.002

Loss of Subcooling Margin Bases

71111.15

Procedures

OP-1202.002

Loss of Subcooling Margin

71111.15

Procedures

OP-1203.002

Alternate Shutdown

71111.15

Procedures

OP-1203.012J

Annunciator K11 Corrective Action

71111.15

Procedures

OP-1203.013

Natural Circulation Cooldown

71111.15

Procedures

OP-1304.035

Position Indication Panel Alignment and Rod Drop Test

71111.15

Procedures

OP-2203.003

CEA Malfunction

71111.15

Work Orders

WO 563524, 588576, 588765, 52984342

71111.18

Corrective Action

Documents

CR-ANO-

C-2018-01957, C-2023-00049, C-2023-00107, WT-WTANO-

2018-00282

71111.18

Miscellaneous

ASLP-ESPC-SAMG

SAMG Introduction for Engineers

71111.18

Procedures

1DPG-001

Diagnostic Process Guideline

71111.18

Procedures

1SAG-001

Initial Response

71111.18

Procedures

1SAG-002

TSC Recommending Strategies

71111.18

Procedures

1SAG-003

Inject into Steam Generators

71111.18

Procedures

1SAG-004

Depressurize RCS

71111.18

Procedures

1SAG-005

Inject into RCS

71111.18

Procedures

1SAG-006

Inject into Containment

71111.18

Procedures

1SAG-007

Reduce Containment Hydrogen

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.18

Procedures

1SAG-008

Control Containment Pressure

71111.18

Procedures

1SAG-009

Mitigate Fission Product Release

71111.18

Procedures

1SAG-010

Control SFP Level

71111.18

Procedures

1TSG-001

Instrumentation

71111.18

Procedures

1TSG-002

Ultimate Decision Maker

71111.18

Procedures

1TSG-003

Site Capabilities

71111.18

Procedures

1TSG-004

Benefit Consequence

71111.18

Procedures

1TSG-005

Computational Aids

71111.18

Procedures

2DPG-001

Diagnostic Process Guideline

71111.18

Procedures

2SAG-001

Initial Response

71111.18

Procedures

2SAG-002

TSC Recommending Strategies

71111.18

Procedures

2SAG-003

Inject into Steam Generators

71111.18

Procedures

2SAG-004

Depressurize RCS

71111.18

Procedures

2SAG-005

Inject into RCS

71111.18

Procedures

2SAG-006

Inject into Containment

71111.18

Procedures

2SAG-007

Reduce Containment Hydrogen

71111.18

Procedures

2SAG-008

Control Containment Pressure

71111.18

Procedures

2SAG-009

Mitigate Fission Product Release

71111.18

Procedures

2SAG-010

Control SFP Level

71111.18

Procedures

2TSG-001

Instrumentation

71111.18

Procedures

2TSG-002

Ultimate Decision Maker

71111.18

Procedures

2TSG-003

Site Capabilities

71111.18

Procedures

2TSG-004

Benefit Consequence

71111.18

Procedures

2TSG-005

Computational Aids

71111.18

Procedures

SDS-005

SAMG Developed Strategy 05 - ES Pump Adequate NPSH

Verification

71111.19

Corrective Action

Documents

CR-ANO-

1-2022-02369, 1-2022-02405, 1-2022-02465, 1-2022-02481,

1-2022-02509, 1-2022-02546, 1-2022-02551, 1-2022-02711,

1-2022-02963, C-2022-03009,

71111.19

Miscellaneous

PE-ANO-00149672

Procurement Evaluation, Air Starter Motor

11/18/2015

71111.19

Procedures

OP-1104.004

Decay Heat Removal Operating Procedure

137

71111.19

Procedures

OP-1104.036

Emergency Diesel Generator Operation

71111.19

Procedures

OP-1305.041

Decay Heat Removal Systems Tests

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

Procedures

OP-1306.017

Unit 1 Main Steam Safety Valve Test

71111.19

Procedures

OP-1402.066

Month Inspection on Unit 1 Emergency Diesel Generator

Engine

71111.19

Work Orders

WO 586131, 587698, 52889721, 52928628, 52966411,

2966412, 52966413, 52966414, 52966467, 52966468,

2889721

71111.20

Corrective Action

Documents

CR-ANO-

1-2022-02514, 1-2022-02517, 1-2022-02805, 1-2022-02806,

1-2022-02890, 1-2022-02985, 1-2022-03012, 1-2022-03142,

1-2022-03314, HQN-2022-02064

71111.20

Miscellaneous

COLR-31

Core Operating Limits Report, Cycle 31

71111.20

Miscellaneous

EN-FAP-OM-022

Daily Plant Status Report

71111.20

Miscellaneous

ER 980302

PSV-1001/PSV-1002 FME Cover

09/02/1999

71111.20

Miscellaneous

PIF 1-22-0242

DHR and LTOP Sys Control

71111.20

Miscellaneous

PIF 1-22-038

U1 Pzr Relief Vlv Removal

71111.20

Procedures

EN-OM-123

Fatigue Management Program

71111.20

Procedures

OP-1015.002

Decay Heat Removal and LTOP System Control

71111.20

Procedures

OP-1102.001

Plant Preheatup and Precritical Checklist

71111.20

Procedures

OP-1102.002

Plant Startup

117

71111.20

Procedures

OP-1102.004

Power Operation

71111.20

Procedures

OP-1102.008

Approach to Criticality

71111.20

Procedures

OP-1102.010

Plant Shutdown and Cooldown

71111.20

Procedures

OP-1102.016

Power Reduction and Plant Shutdown

71111.20

Procedures

OP-1103.011

Draining and N2 Blanketing the RCS

71111.20

Procedures

OP-1402.018

Unit 1 Pressurizer Relief Valve (PSV-1001 and PSV-1002)

Removal

71111.20

Work Orders

WO 588759

71111.22

Corrective Action

Documents

CR-ANO-

1-2022-01182, 1-2022-01471

71111.22

Procedures

OP-1305.007

RB Isolation and Miscellaneous Valve Stroke Test

71111.22

Procedures

OP-1412.083

Rotork Valves and Valvops Inspection and Lubrication

71111.22

Work Orders

WO 533729, 52976157, 53011901

71124.01

ALARA Plans

RWP 2021-2471

RWP Termination

2R28 Inspections and Laser Peening on Unit 2 Reactor

Head

11/23/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

and Post-Job

ALARA Review

71124.01

ALARA Plans

RWP 2021-2910

RWP Termination

and Post-Job

ALARA Review

2R28 Partial Replacement of Nozzle 46

11/23/2021

71124.01

ALARA Plans

RWP 2022-1500

ALARA Plan

P-32B RCP Motor and Rotating Assembly Replacement

08/05/2022

71124.01

ALARA Plans

RWP 2022-1506

ALARA Plan

P-34B Replace Outboard and Inboards Seals

08/05/2022

71124.01

Calibration

Records

AMS-024

AMS-4 calibration for T2 404 vent room monitoring

2/02/2022

71124.01

Calibration

Records

AMS-025

AMS-4 calibration for train bay monitoring

09/19/2021

71124.01

Calibration

Records

AMS-032

AMS-4 calibration for Unit 2 equipment hatch monitoring

03/29/2022

71124.01

Calibration

Records

AMS-047

AMS-4 calibration for PASS building monitoring

2/07/2022

71124.01

Corrective Action

Documents

CR-ANO-

1-2021-02418, 1-2021-02687, 1-2022-01557, 2-2021-01786,

2-2021-01865, 2-2021-03209, 2-2022-01172, C-2021-01153,

C-2021-01155, C-2021-01156, C-2021-01211, C-2021-

01377, C-2021-02542, C-2021-02584, C-2021-02614, C-

21-02732, C-2021-02740, C-2021-03269, C-2022-00736,

C-2022-00759, C-2022-01128, C-2022-01556, C-2022-

01557, C-2022-01558, C-2022-01845, C-2022-02436, C-

22-02443, C-2022-02471

71124.01

Corrective Action

Documents

CR-HQN-

21-00896, 2021-01510, 2021-02088

71124.01

Miscellaneous

DH-1001 posting

Approval for Locked High Radiation Area Deviations

10/08/2022

71124.01

Procedures

EN-RP-100

Radiation Worker Expectations

71124.01

Procedures

EN-RP-101

Access Control for Radiologically Controlled Areas

71124.01

Procedures

EN-RP-102

Radiological Control

71124.01

Procedures

EN-RP-105

Radiological Work Permits

71124.01

Procedures

EN-RP-108

Radiation Protection Posting

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.01

Procedures

EN-RP-121

Radioactive Material Control

71124.01

Procedures

EN-RP-131

Air Sampling

71124.01

Procedures

EN-RP-151

Radiological Diving

71124.01

Procedures

EN-RP-202

Personnel Monitoring

71124.01

Radiation

Surveys

ANO-21-08-00380

Unit 1 emergency diesel generator building 372' elevation

08/30/2021

71124.01

Radiation

Surveys

ANO-21-10-00129

Unit 2, "B" high pressure safety injection room on 317'

elevation

10/03/2021

71124.01

Radiation

Surveys

ANO-21-10-00134

Unit 2, "B" high pressure safety injection room on 317'

elevation - follow-up survey

10/03/2021

71124.01

Radiation

Surveys

ANO-22-06-00180

Unit 2 auxiliary building 404' elevation

06/16/2022

71124.01

Radiation

Surveys

ANO-22-06-00181

Unit 2 auxiliary building 404' elevation

06/16/2022

71124.01

Radiation

Surveys

ANO-22-10-00276

Unit 1 reactor building 375' south cavity

10/09/2022

71124.01

Radiation

Surveys

ANO-22-10-00306

Unit 1 reactor building 375' south cavity

10/10/2022

71124.01

Radiation

Surveys

ANO-22-10-00319

Unit 1 reactor building 375' south cavity

10/10/2022

71124.01

Radiation

Surveys

ANO-22-10-00395

Unit 1 reactor building 375' south cavity

10/11/2022

71124.01

Radiation

Surveys

ANO-22-10-00398

Unit 1 reactor building 375' south cavity

10/11/2022

71124.01

Radiation

Surveys

ANO-22-10-00771

Unit 1 reactor building 375' south cavity

10/16/2022

71124.01

Radiation

Surveys

ANO-22-10-00863

Unit 1 reactor building 335' elevation general area

10/18/2022

71124.01

Radiation

Surveys

ANO-22-10-00956

Unit 1 turbine building 386' general area

10/19/2022

71124.01

Radiation

Surveys

ANO-22-20-00179

Unit 1 reactor building 335' elevation general area

10/08/2022

71124.01

Radiation

Surveys

ANO-AS-101421-

0797

Air Sample Report

10/14/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.01

Radiation

Surveys

ANO-AS-112021-

1110

Air Sample Report

11/20/2021

71124.01

Radiation

Surveys

ANO-AS-112321-

1134

Air Sample Report

11/23/2021

71124.01

Radiation Work

Permits (RWPs)

22-1500

1R30 P-32B-Reactor Coolant Pump and Rotating Assembly

Replacement

71124.01

Radiation Work

Permits (RWPs)

22-1502

1R30 Pressurizer Heater Bundle/Cable Replacement

71124.01

Radiation Work

Permits (RWPs)

22-1506

1R30 P-34B Replace Outboard and Inboard Seals

71124.01

Self-Assessments LO-ALO-2022-

00039

Radiological Hazard Assessment and Exposure Controls

and In-Plant Airborne Radioactivity Controls and Mitigation

07/06/2022

71124.03

ALARA Plans

22-1430 1R30

Reactor

Disassembly, Re-

assembly - Task 3 /

Fuel Transfer Canal

entry during LHRA

conditions

EN-RP-503 Attachment 9.3 TEDE-ALARA Evaluation

07/06/2022

71124.03

ALARA Plans

22-1430 1R30

Reactor

Disassembly, Re-

assembly - Task 5

/RVCH O-Ring

Replacement

EN-RP-503 Attachment 9.3 TEDE-ALARA Evaluation

07/06/2022

71124.03

ALARA Plans

22-1502/1R30

Pressurizer Heater

Bundle

Replacement - Task

4/Pressurizer Cable

Removal/Installation

Selection, Issue and Use of Respiratory Protection

Equipment - TEDE ALARA Evaluation

07/18/2022

71124.03

ALARA Plans

22-

1502/Pressurizer

Selection, Issue and Use of Respiratory Protection

Equipment - TEDE ALARA Evaluation

07/18/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Heater Bundle

Replacement - Task

2, 5, 6, 8 / PZR

Heater Bundle

Replacement

71124.03

Corrective Action

Documents

CR-ANO-

1-2021-01470, 1-2022-00288, 1-2022-00293, 2-2021-00841,

2-2021-00965, 2-2021-00996, 2-2021-01211, 2-2021-01244,

2-2021-01419, 2-2021-02120, 2-2021-02290, 2-2021-03136,

2-2021-03450, 2-2022-00068, 2-2022-00228, 2-2022-00576,

2-2022-00931, C-2021-01211, C-2021-01244, C-2021-

2109, C-2021-02296, C-2021-02762, C-2021-02956, C-

22-01252, C-2022-01558, C-2022-01785, C-2022-01797,

C-2022-01820, C-2022-01821, C-2022-01845, C-2022-

272

71124.03

Corrective Action

Documents

CR-HQN-

21-01457, 2021-01627

71124.03

Miscellaneous

TRI Air Testing Inc., Laboratory Report Compressed Air/Gas

Quality Testing - Eagle Air SN: C-82A

07/12/2021

71124.03

Miscellaneous

TRI Air Testing, Inc. Laboratory Report Compressed Air/Gas

Quality Testing - Bauer C.82C Compressor

07/12/2021

71124.03

Miscellaneous

TRI Air Testing, Inc. Laboratory Report Compressed Air/Gas

Quality Testing - Max Air C-82C

05/25/2022

71124.03

Miscellaneous

TRI Air Testing, Inc. Laboratory Report Compressed Air/Gas

Quality Testing C-82A Eagle Air Compressor

01/24/2022

71124.03

Miscellaneous

EN-RP-502 -

9.1

Monthly Inspection and Maintenance of Respiratory

Protection Equipment

06/23/2021 -

08/30/2022

71124.03

Procedures

EN-RP-404

Operation and Maintenance of HEPA Vacuum Cleaners and

HEPA Ventilation Units

71124.03

Procedures

EN-RP-502

Inspection and Maintenance of Respiratory Protection

Equipment

71124.03

Procedures

EN-RP-503

Selection, Issue, and Use of Respiratory Protection

Equipment

71124.03

Procedures

EN-RP-504

Breathing Air

71124.03

Procedures

HES-06

Ventilation/Filtration Testing Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.03

Work Orders

2859611

Month Test of 2VSF-9 (CR Emerg.)

07/28/2020

71124.03

Work Orders

2931236

Perform 18 Month Test of 2VSF-9 (CR Emerg.)

01/25/2022

71124.08

Procedures

EN-RW-102

Radioactive Shipping Procedure

71124.08

Shipping Records

RSR 22-066

Exclusive use shipment of surface contaminated object

(SCO-II) in a metal box

10/17/2022

71151

Miscellaneous

ANO-1 and ANO-2 NRC Performance Indicator

Technique/Data Sheets - Mitigating Systems

Q4-2021

71151

Miscellaneous

ANO-1 and ANO-2 NRC Performance Indicator

Technique/Data Sheets - Mitigating Systems

Q3-2022

71151

Miscellaneous

ANO-1 and ANO-2 NRC Performance Indicator

Technique/Data Sheets - Mitigating Systems

Q1-2022

71151

Miscellaneous

ANO-1 and ANO-2 NRC Performance Indicator

Technique/Data Sheets - Mitigating Systems

Q2-2022

71151

Miscellaneous

CALC-ANO2SA-

06-00001

ANO 2 Mitigating System Performance Index Basis

71151

Procedures

EN-LI-114

Regulatory Performance Indicator Process

71152S

Corrective Action

Documents

CR-ANO-

1-2022-00011, 1-2022-00195, 1-2022-01069, 1-2022-01079,

1-2022-01446, 1-2022-01509, 2-2019-02134, 2-2022-00216,

2-2022-00532, 2-2022-01280, 2-2022-01282, C-2022-00555,

C-2022-00569, C-2022-00858, C-2022-01802, C-2022-

01803, C-2022-02338, C-2022-02364, C-2022-02365, C-

22-02366, C-2022-02376, C-2022-02714, C-2022-02730,

C-2022-02744, C-2022-03613, C-2023-00102

71152S

Miscellaneous

OPS-B39

AAC Diesel Generator Log

11/28/2006

71152S

Miscellaneous

STM 2-33

Alternate AC Diesel Generator

71152S

Miscellaneous

ULD-0SYS-19

Alternate AC Generator System

71152S

Procedures

EN-LI-108-01

CFR 21 Evaluations and Reporting

71152S

Procedures

EN-OP-115-01

Control Room and Field Operator Rounds

71152S

Procedures

OP-2104.037

Alternate AC Generator Operations

38