ML19207B352: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:..VIItGINI A E LECTit1C AND l'OW Elt CWII%NY n rcir> sox n,va no rx 1A unun August 21, 1979 Mr. James P. O'Reilly, Director Serial No. 672 Office of Inspection and Enforcement P0/RMT:baw U. S. Nuclear Regulatory Comnission Docket No. 50-338 Region II 101 Marietta Street, Suite 3100 License No. NPF-4 Atlanta, Georgia 30303  
{{#Wiki_filter:. .
VIItGINI A E LECTit1C AND l'OW Elt CWII%NY n rcir> sox n,va no rx 1A unun August 21, 1979 Mr. James P. O'Reilly, Director                           Serial No. 672 Office of Inspection and Enforcement                     P0/RMT:baw U. S. Nuclear Regulatory Comnission                       Docket No. 50-338 Region II 101 Marietta Street, Suite 3100                         License No. NPF-4 Atlanta, Georgia     30303


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==


Pursuant to North Anna Power Station Technical Specifications, the Virginia Elcctric and Power Company hereby submits the followin;; Licensee Event Repcrts for North Anna Unit Na. 1.
Pursuant to North Anna Power Station Technical Specifications, the Virginia Elcctric and Power Company hereby submits the followin;; Licensee Event Repcrts for North Anna Unit Na. 1.
Report No.
Report No.                         Applicable Technical Specifications LER 79-093/03L-0                             T. S . 6.9 .1.9 .b .
Applicable Technical Specifications LER 79-093/03L-0 T. S . 6.9 .1.9 .b .
LER 79-095/03L-0   ,                        T.S. 6.9.1.9.b.
LER 79-095/03L-0 T.S. 6.9.1.9.b.
These reports have been reviewed by the Station Nuclear Safety and Operating Committee and will be placed on the agenda for the next meeting of the System Nuclear Safety and Operating Committee.
, These reports have been reviewed by the Station Nuclear Safety and Operating Committee and will be placed on the agenda for the next meeting of the System Nuclear Safety and Operating Committee.
                                                              \ery truly yours, s'   d ch.nys C. M. Stallings Vice President-Power Supply and Production Operations Enclosures (3 copies) cc: Mr. Victor Stello, Directar (30 copies)
\ery truly yours, s'd ch.nys C. M.Stallings Vice President-Power Supply and Production Operations Enclosures (3 copies) cc: Mr. Victor Stello, Directar (30 copies)
Office of Inspection and luforcement Mr. k'1111am G. Mcdonald, Director (3 copies)
Office of Inspection and luforcement Mr. k'1111am G. Mcdonald, Director (3 copies)
Office of Management Information and Program Control q~7.g-s'-L.L'Q 7908240 v}}
Office of Management Information and Program Control
                                                                              .g-  q~7 s
                                                                                        '
                                                                                -
L
                              .
L'Qv 7908240}}

Revision as of 15:39, 19 October 2019

Forwards LERs 79-093/03L-0 & 79-095/03L-0
ML19207B352
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/21/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19207B353 List:
References
NUDOCS 7908240485
Download: ML19207B352 (1)


Text

. .

VIItGINI A E LECTit1C AND l'OW Elt CWII%NY n rcir> sox n,va no rx 1A unun August 21, 1979 Mr. James P. O'Reilly, Director Serial No. 672 Office of Inspection and Enforcement P0/RMT:baw U. S. Nuclear Regulatory Comnission Docket No. 50-338 Region II 101 Marietta Street, Suite 3100 License No. NPF-4 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Pursuant to North Anna Power Station Technical Specifications, the Virginia Elcctric and Power Company hereby submits the followin;; Licensee Event Repcrts for North Anna Unit Na. 1.

Report No. Applicable Technical Specifications LER 79-093/03L-0 T. S . 6.9 .1.9 .b .

LER 79-095/03L-0 , T.S. 6.9.1.9.b.

These reports have been reviewed by the Station Nuclear Safety and Operating Committee and will be placed on the agenda for the next meeting of the System Nuclear Safety and Operating Committee.

\ery truly yours, s' d ch.nys C. M. Stallings Vice President-Power Supply and Production Operations Enclosures (3 copies) cc: Mr. Victor Stello, Directar (30 copies)

Office of Inspection and luforcement Mr. k'1111am G. Mcdonald, Director (3 copies)

Office of Management Information and Program Control

.g- q~7 s

'

-

L

.

L'Qv 7908240