ML062120480: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Zabel J
| author name = Zabel J
| author affiliation = Advanced Technologies & Labs International, Inc
| author affiliation = Advanced Technologies & Labs International, Inc
| addressee name = Davis J A
| addressee name = Davis J
| addressee affiliation = NRC/NRR/DRIP
| addressee affiliation = NRC/NRR/DRIP
| docket = 05000293
| docket = 05000293
Line 23: Line 23:


==Subject:==
==Subject:==
Comments on Pilgrim AMP document Hi Jim: In going over and incorporating your comments on the Pilgrim AMP document, I discovered that your comment change to page 65, lines 18-19, was missing a portion. The following is the excerpt from your comment that reflects the exclusion  
Comments on Pilgrim AMP document Hi Jim: In going over and incorporating your comments on the Pilgrim AMP document, I discovered that your comment change to page 65, lines 18-19, was missing a portion. The following is the excerpt from your comment that reflects the exclusion
(...): From an additional historical perspective, the SSW system at PNPS has experienced leaks on the buried inlet (screenhouse to auxiliary bays)piping as a result of internal corrosion.
(...): From an additional historical perspective, the SSW system at PNPS has experienced leaks on the buried inlet (screenhouse to auxiliary bays)piping as a result of internal corrosion.
The original piping material was rubber-lined carbon steel wrapped with ... occurred in 1995 and 1997. In addition, the SSW buried discharge piping (also rubber-lined carbon steel with external pipe wrapping, same as inlet piping) from the auxiliary bays to the discharge canal also experienced severe internal corrosion due to failure of the rubber lining. Two 40-foot lengths of 22-inch diameter pipes (one on each loop) were replaced in 1999 as a result of the failed rubber lining and internal corrosion.
The original piping material was rubber-lined carbon steel wrapped with ... occurred in 1995 and 1997. In addition, the SSW buried discharge piping (also rubber-lined carbon steel with external pipe wrapping, same as inlet piping) from the auxiliary bays to the discharge canal also experienced severe internal corrosion due to failure of the rubber lining. Two 40-foot lengths of 22-inch diameter pipes (one on each loop) were replaced in 1999 as a result of the failed rubber lining and internal corrosion.

Revision as of 14:13, 13 July 2019

2006/07/07-Email: (PA) Comments on Pilgrim AMP Document
ML062120480
Person / Time
Site: Pilgrim
Issue date: 07/07/2006
From: Joseph Zabel
Advanced Technologies & Labs International
To: Jennifer Davis
Division of Regulatory Improvement Programs
References
%dam200612, TAC MC9669
Download: ML062120480 (3)


Text

James Davis -Comments on Pilgrim AMP document Page James Davis -Comments on Pilgrim AMP document Page 1 ~I From: "Zabel, Joe" <JZabel@atlintl.com>

To: <jad@nrc.gov>

Date: 07/07/2006 10:49:09 AM

Subject:

Comments on Pilgrim AMP document Hi Jim: In going over and incorporating your comments on the Pilgrim AMP document, I discovered that your comment change to page 65, lines 18-19, was missing a portion. The following is the excerpt from your comment that reflects the exclusion

(...): From an additional historical perspective, the SSW system at PNPS has experienced leaks on the buried inlet (screenhouse to auxiliary bays)piping as a result of internal corrosion.

The original piping material was rubber-lined carbon steel wrapped with ... occurred in 1995 and 1997. In addition, the SSW buried discharge piping (also rubber-lined carbon steel with external pipe wrapping, same as inlet piping) from the auxiliary bays to the discharge canal also experienced severe internal corrosion due to failure of the rubber lining. Two 40-foot lengths of 22-inch diameter pipes (one on each loop) were replaced in 1999 as a result of the failed rubber lining and internal corrosion.

These spools were replaced with carbon steel coated internally and externally with an epoxy coating. The piping that was removed was examined after its wrapping was removed and its external surface was found to be in good condition.

Since that time, the entire length of both SSW buried discharge loops have been lined internally with cured-in-place pipe linings-"B" Loop in 2001 and "A" Loop in 2003.Please look this over and send me the missing words to complete your comment.Thanks, Joe Joe Zabel Senior Writer/Outreach Manager Advanced Technologies

& Laboratories International, Inc.20010 Century Boulevard, Suite 500 James Davis -Comments on Pilgrim AMP document Page 2 Germantown, MD 20874 Tel: (301) 515-6783 Fax: (301) 972-6904 CC: "Orr, Mark" <MPOrr@atlintl.com>

c.Atqrnp\GWJ00001.TMP ao c:\tempGWIOOQi .TMPP-acj 1 I Mail Envelope Properties (44AE745D.2BE:

2: 53950)

Subject:

Creation Date From: Created By: Comments on Pilgrim AMP document 07/07/2006 10:48:46 AM"Zabel, Joe" <JZabel @atlintl.com>

JZabel@atlintl.com Recipients nrc.gov OWGWPO03.HQGWDOO1 JAD (James Davis)atlintl.com MPOrr CC (Mark Orr)Post Office OWGWPOO3.HQGWDOO1 Route nrc.gov atlintl.com Files MESSAGE TEXT.htm Mime.822 Options Expiration Date: Priority: ReplyRequested:

Return Notification:

Concealed

Subject:

Security: Size 1677 5230 8769 Date & Time 07/07/2006 10:48:46 AM None Standard No None No Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled