ML18009A585: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/28/1990
| issue date = 06/28/1990
| title = Advises That Emergency Preparedness Exercise Scheduled on 900919.Exercise Will Consist of Simulated Accident at Plant Site & Will Involve Planned Response Actions.Objectives to Be Fulfilled Encl
| title = Advises That Emergency Preparedness Exercise Scheduled on 900919.Exercise Will Consist of Simulated Accident at Plant Site & Will Involve Planned Response Actions.Objectives to Be Fulfilled Encl
| author name = LOFLIN L I
| author name = Loflin L
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 07:40, 18 June 2019

Advises That Emergency Preparedness Exercise Scheduled on 900919.Exercise Will Consist of Simulated Accident at Plant Site & Will Involve Planned Response Actions.Objectives to Be Fulfilled Encl
ML18009A585
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/28/1990
From: Loflin L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS-90-130, NUDOCS 9007050056
Download: ML18009A585 (4)


Text

ACCELERATED D STIUBUTION DEMONSTPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9007050056 DOC.DATE: 90/06/28 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION LOFLIN,L.I.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)DOCKET g 05000400

SUBJECT:

Informs of scheduled emergency preparedness exercise for plant for 900919 to fulfill requirements in 10CFR50,App E.DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR J ENCL f SIZE: D TITLE: OR Submittal:

Emergency Preparedness Plans, Implement'g Procedures, C S NOTES:Application for permit renewal filed.05000400/RECIPXENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECXPIENT ID CODE/NAME BECKER,D NRR/~RE&/rPEPB~

RRG EZAE 0~NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 ggQ[1, Carolina Power 8 Light Company SERIAL: NLS-90-130"JUN 28 iogo United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 EMERGENCY PREPAREDNESS EXERCISE Gentlemen:

Carolina Power&Light Company has scheduled an emergency preparedness exercise for Shearon Harris Nuclear Power Plant (SHNPP)for September 19, 1990.This exercise is intended t:o fulfill the annual exercise requirements set forth in 10CFR50, Appendix E.The attachment to this letter provides the objectives to be fulfilled (i.e., the 75-day submittal) as requested in the October ll, 1984 letter from Mr.R.C.Lewis to Mr.E.E.Utley.The exercise will consist of a simulated accident at SHNPP which could escalate to a general emergency and will involve planned response actions to include: emergency classification, notification of off-site organizations and plant personnel, actions to correct the emergency conditions, and initiation of accident assessment and protective actions necessary to cope with the accident.Please refer any questions regarding this submit:t:al to Mr.Steven Chaplin at (919)546-6623.Yours very truly, L..Lo in Mana er Nuclear Licensing Section SDC/ecc (748ECC)Enclosure cc: Mr.R.A.Becker Mr.S.D.Ebneter Mr.J.E.Tedrow 411 Fayettevitte Street o P.O.Box 1551~Raleigh.N.C.27602 9007050056 900628 l PDR ADOCK'05000400 F PDC ATTACHMENT HARRIS NUCLEAR PROJECT 1990 ANNUAL EXERCISE OBJECTIVES Demonstrate the ability to detect accident conditions, assess and project radiological consequences, and formulate near term mitigating actions.Demonstrate the ability to identify and classify the emergency in accordance with the Emergency Plan.Demonstrate the ability of the Control Room staff to perform accident assessment and implement those appropriate mitigating actions necessary to place the plant in a safe and stable condition.

Demonstrate the adequacy of procedures for alerting, notifying, and mobilizing on-site and off-site emergency response organization personnel.

Demonstrate the timeliness and adequacy of the information provided in the initial notifications to state and county agencies.Demonstrate the capability to make timely and accurate notifications to the Nuclear Regulatory Commission.

Actual participation of the NRC Operations Center may be simulated.

Demonstrate the ability to augment the on-shift emergency organization within the time limits specified within the emergency plan and implementing procedures.

Demonstrate the adequacy of the Technical Support Center in providing accident assessment and mitigation, dose assessment, and communication/notification activities.

Demonstrate the adequacy of the Operations Support Center in providing additional manpower support and coordination.

Demonstrate the adequacy of the Emergency Operations Facility in providing off-site dose assessment, environmental monitoring, protective action recommendations, and evaluation/coordination of off-site activities.

Demonstrate the ability to communicate between emergency response facilities, as well as environmental monitoring teams.Demonstrate that the radiological, meteorological, and process data transmittal to the Technical Support Center and Emergency Operations Facility is adequate.Demonstrate the adequacy of emergency kits and equipment in emergency response facilities.

Demonstrate the adequacy of the equipment utilized for off-site radiological monitoring.

V (90-018RAI/e bc) 15.Demonstrate the ability to formulate appropriate off-site protective action recommendations.

16.'emonstrate that emergency exposure control procedures have been established and are utilized in the protection of emergency workers.17.Demonstrate the capability to monitor personnel and equipment for contamination.

18.Demonstrate the ability to coordinate off-site radiological monitoring activities.

19.Demonstrate the capability to draw samples from the Post Accident Sampling System under simulated elevated radiological conditions.

20.Demonstrate proper procedure for on-site collection and analysis of samples from radiological monitoring and sampling stations within the plant.21.Demonstrate the proper procedures and use of protective measures for entering a Radiologically Controlled Area under abnormal radiological conditions.

22.Demonstrate the capability to respond to an emergency commencing at a time between midnight and 6:00 a.m.23.Demonstrate the capability to staff emergency facilities for a 24-hour period by" performing a shift turnover.(90-018RA I/ebc)