ML18019A434: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/25/1985
| issue date = 10/25/1985
| title = Responds to Questions Raised During 851016 Meeting Re Integrated Design Insp 50-400/84-48 Open Items. Interdisciplinary Clearance Criteria Will Be Revised to Require Safety & Nonsafety Piping Review
| title = Responds to Questions Raised During 851016 Meeting Re Integrated Design Insp 50-400/84-48 Open Items. Interdisciplinary Clearance Criteria Will Be Revised to Require Safety & Nonsafety Piping Review
| author name = WATSON R A
| author name = Watson R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = GRIMES B K
| addressee name = Grimes B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| docket = 05000400
| docket = 05000400

Revision as of 05:13, 18 June 2019

Responds to Questions Raised During 851016 Meeting Re Integrated Design Insp 50-400/84-48 Open Items. Interdisciplinary Clearance Criteria Will Be Revised to Require Safety & Nonsafety Piping Review
ML18019A434
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/25/1985
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
HO-853332-(E), NUDOCS 8510310348
Download: ML18019A434 (4)


See also: IR 05000400/1984048

Text

CÃQE Carolina Power&Light Company HARRIS NUCLEAR PROJECT P.0.Box 101 New Hill, North Carolina 27562 OCT 8 5198S File Number: HXDE-XXX-XXX-XXX

L'etter Number: HO-853332 (E)Mr.Brian K.Grimes, Director Division of Quality Assurance, Vendor and Technical Training Center Program Office of Inspection

6 Enforcement

U.S.Nuclear Regulatory

Commission

Washington, DC 20555 INTEGRATED

DESIGN INSPECTION

50-400/84-48

Dear Mr.Grimes: A public meeting was held in Bethesda, MD, Oct.16, 1985 to provide additional

information

requested by the IDI Team on the following items: D-2.7-1 D-2.7-2 D-2.8-1 D-2.5-4 D-2.5-5 D-2.5-6 D-2.5-7-Non-Seismic

Piping Interaction

Damage Study-Seismic II/I Interactions

of Field Routed Study-Field Installation

Tolerance for Hangers-Gamma Radiation Source Strength Assumptions

-Equipment Qualification

Beta, Dose-In teg rated Dose Analysis-Radiation Dose in Zone R-6 of RAB As a result of the information

provided, the IDI Team indicated the following items would be closed: D-2.5-4, D-2.5-5, D-2.5.6, D-2.5-7 Two questions remained to be confirmed after this meeting.These affect the remaining three IDI items above: 1.The use of B.31.1 spans for horizontal

seismic pipe movements for piping clearances.

2.The use of clearances

allowing impact of components

based on 100%kinetic energy transfer assumption.

The following information

is provided to resolve the above questions:

IBMD-WKK005-OS4

Ebasco Specification

CAR-M-71 provides span tables for use in B.31'.1 applications

for both horizontal

and vertical restraints.

For analyzed ASME Class I, II or III, dead weight (vertical)

restraint spans are consistent

with B.31.1 span criteria.Horizontal

restraints

are placed where necessary based on analysis.HPES Instruction

7.6C~P 8510310348

8510256 PDR ADOCK 05000400 i, O PDR I" l P

a~, I'I V I 4~j, l l~I'I,

Mr.Brian K.Grimes Page 2 (Interdisciplinary

Clearance Criteria)will be revised to require the following:

1)Non-safety

B.31.1 piping will be reviewed against existing clearance criteria of Instruction

7.6C.2)Analyzed ASME piping (safety)will be reviewed ,against IEB 79-14 clearance criteria and any deviations

will be evaluated against actual pipe movements.

The minimum spacing table within HPES Section Instruction

7.6.C (Interdisciplinary

Clearance Criteria)will be revised to provide clearance criteria which will preclude component contact due to a seismic event.Violations

of these clearances

will be documented

and evaluated on a case by case basis to insure functionality

of the component.

We understand

that the above information

provides basis for the IDI Team to close IDI Items D-2.7-1, D-2.7-2, and D-2.8-1.We appreciate

the IDI Team continuing

efforts.We will be available to further discuss or provide additional

information

if necessary.

Yours very truly, aud~R.A.Watson, VP Harris Nuclear Project Dept.HLW:kgo cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Dr.J.Nelson Grace (NRC-RII)Mr.Joe Joyce (NRC-ICSB)

Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)

Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelly (ASLB)IBMD-WKK005-OS4

t~>>>>r~$r~<<I~S>>I'h~r'I g II f)'7">>Sir"I" tr<<I" p~r R<>f i~I~I a,h>>I)r'III r)~"~rh f i r~r rll~Lit p>>f,">>~~"~r>>rR>>i'>>R,<<!>>l"I.>>,)V<<R'I r r r r'.'R)R, r>>,hr)', r>bx<<Clap i>>r E~4>>'>>r),.>>'Rr)i<~>>r I r~<<i", r<j'I rl R,~>>~I~rhea Ii*)'J>>1 R, l~pr<<p")I'Rr<<r i r)>>I-,'f)rif r" r I h'R>>>>>>R)I'Er, 2 4 VO'2 r)')ai o~~r<<h>>)>>,I r r!1,!I r~~R~(<<>>.".)~r'~,I i'h r>>r)f Il h<<>>'l l hr fr II>>~r, h I R-I~I)I rh~)'<<r I'I Sr)Jr>>r>>r f>>y PII~~~)~1~~l~r~II~I'l~i r~>>r~-II~i<<~>>)~r~)'4 I~">>1-.~R~')" r