ML18019B043: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/18/1986
| issue date = 06/18/1986
| title = Forwards Addl Info Re Electrical Equipment,Plant Program Procedure PLP-610 & Analysis of Battery Location in Response to Electrical,Instrumentation & Control Sys Branch 860128-30 Audit
| title = Forwards Addl Info Re Electrical Equipment,Plant Program Procedure PLP-610 & Analysis of Battery Location in Response to Electrical,Instrumentation & Control Sys Branch 860128-30 Audit
| author name = ZIMMERMAN S R
| author name = Zimmerman S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400

Revision as of 04:02, 18 June 2019

Forwards Addl Info Re Electrical Equipment,Plant Program Procedure PLP-610 & Analysis of Battery Location in Response to Electrical,Instrumentation & Control Sys Branch 860128-30 Audit
ML18019B043
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/18/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019B044 List:
References
NLS-86-228, NUDOCS 8606240359
Download: ML18019B043 (7)


Text

REQULATO Y XNFORNATION DISTRIBUTION

~STEN (RIDS)ACCESSION NBR: 8606240359 DOC.DATE: 86/06/18 NOTARIZED:

NO DOCKET 0 FACIL: 50-400 Sheav on Hav v is Nuclear Power Planti Unit ii Cav olina 05000400 AUTH.NAME AUTHOR AFFILIATION ZINGER/'>ANi S.R.Carolina Poeer 5 Light Co.RECIP.NAl'IE RECIPIENT AFFILIATION DENTON>H.R.Of fice oF Nuclear Reactov Regulation.

Div ectov (post 851125

SUBJECT:

Forwards addi into v e electrical equipment.

Plant Pv ogram Pv oceduv e PLP-610 8c analysis oF hatter@location in v'esponse to Electrical>

Instv umentation 5 Control Sgs Branch 860128-30'udit.

DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE: TXTLE: Licensing Submittal:

PSAR/FSAR Amdts 8c Related Correspondence NOTES:Application fov permit venereal filed.05000400 REC IP XENT ID CODE/NANE PWR-A EB PWR-A FOB PWR-A PD2 PD PWR-A PSB INTERNAL: ADN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PWR-B ADTS NRR/DHFT/NTB RQN2 EXTERNAL: BNL(ANDTS ONLY)LPDR 03 NSXC 05 COPIES LTTR ENCL 1 1 1 1 1 0 1 1 1 0 1 1 3 3 1 1 1 1 RECIP I ENT ID CODE/NANE PWR-A EXCSB PWR-A PD2 LA BUCKLEY'S B 01 PWR-A RSB ELD/HDS1 IE/DEPER/EPB 36 NRR BWR ADTS NR L Q 04 RN/DDANI/RIB DNB/DSS (ANDTS)NRC PDR'02 PNL GRUEL'COP IES LTTR ENCL 2 2 1 2 2 1 0 1 0 1 1 0 1 1 1 TOTAL NUNBER OF COPIES REQUIRED: LTTR 30 ENCL 25

>>I>>W<<3>>I)t te'K<<I~i,;)W)l)<<W)),'<<'f-W()W)WI,))')t.W".-)3)I<<c<<w'I)',~)<<c", E))t 3 h I'8-3V)j t'(!<<3))t'(;C))W I'.""<<C W t.<<((.<<li',,<<W.>>f)'I',)','i)'cg"))',3$P(l<<>>)tt I W"(IJ,E 3 I'<<I I c'<<)((>>I C.'

SME Carolina Power 5 Light Company JOIN ls~SERIAL: NLS-86-228 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 RESPONSE TO ELECTRICAL SYSTEMS AUDIT FINDINGS

Dear Mr.Denton:

Carolina Power R Light Company hereby submits additional information concerning electrical equipment at the Shearon Harris Nuclear Power Plant.This information is submitted in response to the Electrical and Instrumentation and Control System Branch Audit conducted on 3anuary 28-30, 1986.The attached information responds specifically to the NRC audit comments transmitted by letter dated May 15, 1986.If you have any questions on this subject or require additional information, please contact me.SRZ/3HE/ccj (39803DK)Attachment cc: Mr.B.C.Buckley (NRC)Mr.O.Chopra (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Dr.3.Nelson Grace (NRC-RII)Wake County Public Library Yours very truly, W~Y+'p-S.R.Zimmerman Manager Nuclear Licensing Section 8606240359 860618 PDR ADOCK 05000400 A PDR<nl 411 Fayetteville Street~P.0, 8ox 1551~Raleigh, N.C.27602 NRC COMMENT The implementation of identification and color coding schemes for safety-related circuits and equipment was observed.We found that one of the RHR pumps (for the selected systems observed)was not identified.

The applicant has committed to properly identify the above RHR pump and we find this to be acceptable.

However, we require the applicant to check other equipment to assure this condition does not exist elsewhere in the plant.RESPONSE Subsequent to the EICSB Audit, the RHR pump has been labeled.This equipment was tagged as part of the overall equipment labeling program being conducted in accordance with the Plant Program Procedure PLP-610,"Equipment Identification and Numbering System" (Enclosure I).This program will ensure that plant equipment will be properly labelled, The Plant Equipment Deficiency Program identified in Administrative Procedure, AP-038, will be used to identify missing equipment labels which had been previously installed.

(3980JDK/ccrc

)

NRC COMMENT During our audit of the battery rooms, we found that the showers in the battery rooms are not enclosed and are very close to the batteries, thereby creating the potential of shower spill causing damage to the batteries.

V/e require the applicant to either enclose the showers in battery rooms or provide justification for the existing design.RESPONSE The identified concern has been reviewed and the existing installation has been found acceptable.

This engineering review is documented in the enclosed Project Analysis E-5500,"Location of Battery Rooms SA and SB Eyewash Station and Shower" (Enclosure 2).(3980 JDK/cc j)

NRC COMMENT During our audit of the control room alarms provided for DC power systems, we found there was only one battery trouble alarm provided for both redundant trains (125V DC Emergency Bus A/B trouble).We require that a separate DC bus trouble alarm for each train be provided to facilitate quick trouble diagnosis of DC power systems.RESPONSE A second annunciator window will be added in the Main Control'oom and the Auxiliary Control Room to differentiate between 125V DC Emergency Bus A and Bus B trouble.The design modification required has been issued per the enclosed FCR-I-3378 (Enclosure 3).(3980JDK/ccj

)

I"J ,I)'l 11 I'H ,I 1 0-"I I ii I, I I I'I t 1)I~'1'I H ll't I I f I Jl I')I I I I t'f I.I Jf H I f I I,'I I 14 J'I.I ,I"'*I l.I I 4\'I 1 I l'l il Il i.I 44 1','1 I;I I I 1)I'"4 I I'f I I J I I 5 f)'1.I I I i I f I I'1 I)')I'I ,l I~'h PJ 1., 41 I I I\i.')I I t I c 4~J lh I I'll I L 4 I I