{{Adams|number = ML062080420}}
{{Adams
| number = ML062080420
| issue date = 07/27/2006
| title = IR 05000395-06-003; 04/01/2006 - 07/01/2006; Virgil C. Summer Nuclear Station; Identification and Resolution of Problems
| author name = Landis K D
| author affiliation = NRC/RGN-II/DRP/RPB5
| addressee name = Archie J B
| addressee affiliation = South Carolina Electric & Gas Co
| docket = 05000395
| license number = NPF-012
| contact person =
| document report number = IR-06-003
| document type = Inspection Report, Letter
| page count = 25
}}


{{IR-Nav| site = 05000395 | year = 2006 | report number = 003 }}
{{IR-Nav| site = 05000395 | year = 2006 | report number = 003 }}
Line 7: Line 21:
[[Issue date::July 27, 2006]]
[[Issue date::July 27, 2006]]


South Carolina Electric & Gas CompanyATTN: Mr. JeffreyVice President, Nuclear OperationsVirgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065
South Carolina Electric & Gas CompanyATTN: Mr. Jeffrey Vice President, Nuclear OperationsVirgil C. Summer Nuclear Station
 
P. O. Box 88 Jenkinsville, SC 29065


SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTIONREPORT 05000395/2006003
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTIONREPORT 05000395/2006003
Line 14: Line 30:
On July 1, 2006, the United States Nuclear Regulatory Commission (NRC) completed aninspection at your Virgil C. Summer Nuclear Station. The enclosed integrated inspection reportdocuments the inspection results, which were discussed on July 11, 2006, with Mr. Thomas Gatlin and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, one NRC-identified finding of very low safetysignificance was identified. This finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your corrective action program, the NRC is treating this finding as a non-cited violation(NCV) consistent with Section VI.A of the NRC Enforcement Policy. In addition, one licensee-identified violation, which was determined to be of very low safety significance, is listed in Section 4OA7 of this report. If you contest any NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk,Washington, DC 20555-0001, with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Virgil C. Summer Nuclear Station.
On July 1, 2006, the United States Nuclear Regulatory Commission (NRC) completed aninspection at your Virgil C. Summer Nuclear Station. The enclosed integrated inspection reportdocuments the inspection results, which were discussed on July 11, 2006, with Mr. Thomas Gatlin and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, one NRC-identified finding of very low safetysignificance was identified. This finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your corrective action program, the NRC is treating this finding as a non-cited violation(NCV) consistent with Section VI.A of the NRC Enforcement Policy. In addition, one licensee-identified violation, which was determined to be of very low safety significance, is listed in Section 4OA7 of this report. If you contest any NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk,Washington, DC 20555-0001, with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Virgil C. Summer Nuclear Station.


SCE&G2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) component ofNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
SCE&G2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) com ponent ofNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/Kerry D. Landis, Chief   Reactor Projects Branch 5 Division of Reactor ProjectsDocket No.: 50-395License No.: NPF-12  
Sincerely,/RA/Kerry D. Landis, Chief Reactor Projects Branch 5 Division of Reactor ProjectsDocket No.: 50-395License No.: NPF-12  


===Enclosure:===
===Enclosure:===
NRC Integrated Inspection Report 05000395/2006003                
NRC Integrated Inspection Report 05000395/2006003


===w/Attachment:===
===w/Attachment:===
Supplemental Informationcc w/encl: (See page 2)
Supplemental Informationcc w/encl: (See page 2)  
SCE&G2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) component ofNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html  (the Public Electronic Reading Room).
 
Sincerely,/RA/Kerry D. Landis, Chief    Reactor Projects Branch 5 Division of Reactor ProjectsDocket No.:  50-395License No.: NPF-12
 
===Enclosure:===
NRC Integrated Inspection Report 05000395/2006003                 


===w/Attachment:===
_________________________OFFICERII:DRPRII:DRPRII:DRPRII:DRPSIGNATUREJXZ per phoneLXC per phoneTLH4 forLXGNAMEJZeilerMCainRTaylorLGarnerDATE07/27/200607/27/200607/27/200607/27/2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO SCE&G3cc w/encl:R. J. White Nuclear Coordinator (Mail Code 802)
Supplemental Informationcc w/encl:  (See page 2)G  PUBLICLY AVAILABLE G  NON-PUBLICLY AVAILABLEG  SENSITIVE        G  NON-SENSITIVEADAMS:  G YesACCESSION NUMBER:_________________________OFFICERII:DRPRII:DRPRII:DRPRII:DRPSIGNATUREJXZ per phoneLXC per phoneTLH4 forLXGNAMEJZeilerMCainRTaylorLGarnerDATE07/27/200607/27/200607/27/200607/27/2006 E-MAIL COPY?   YESNO     YESNO     YESNO     YESNO     YESNO     YESNO     YESNO   OFFICIAL RECORD COPY          DOCUMENT NAME:  E:\Filenet\ML062080420.wpd SCE&G3cc w/encl:R. J. White Nuclear Coordinator (Mail Code 802)
S.C. Public Service Authority Virgil C. Summer Nuclear Station Electronic Mail DistributionKathryn M. Sutton, Esq.Morgan, Lewis & Bockius LLP Electronic Mail DistributionHenry J. Porter, DirectorDiv. of Radioactive Waste Mgmt.
S.C. Public Service Authority Virgil C. Summer Nuclear Station Electronic Mail DistributionKathryn M. Sutton, Esq.Morgan, Lewis & Bockius LLP Electronic Mail DistributionHenry J. Porter, DirectorDiv. of Radioactive Waste Mgmt.


Dept. of Health and Environmental Control Electronic Mail DistributionR. Mike GandyDivision of Radioactive Waste Mgmt.
Dept. of Health and Environmental Control Electronic Mail DistributionR. Mike GandyDivision of Radioactive Waste Mgmt.


S. C. Department of Health and Environmental Control Electronic Mail DistributionRobert G. Sweet, ManagerNuclear Licensing (Mail Code 830)
S. C. Department of Health and Environmental Control Electronic Mail DistributionRobert G. Sweet, ManagerNuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionRobert M. Fowlkes, General ManagerEngineering Services South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionThomas D. Gatlin, General ManagerNuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionRobert M. Fowlkes, General ManagerEngineering Services South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionThomas D. Gatlin, General ManagerNuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionDavid A. Lavigne, General ManagerOrganization Development South Carolina Electric & Gas Company Vigil C. Summer Nuclear Station Electronic Mail DistributionDistribution w/encl: (See page 4)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionDavid A. Lavigne, General ManagerOrganization Development South Carolina Electric & Gas Company Vigil C. Summer Nuclear Station Electronic Mail DistributionDistribution w/encl: (See page 4)
SCE&G4Report tofrom Kerry D. Landis dated July 27, 2006
SCE&G4Report to from Kerry D. Landis dated July 27, 2006


SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTIONREPORT 05000395/2006003Distribution w/encl:R. Martin, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC EnclosureU. S. NUCLEAR REGULATORY COMMISSIONREGION IIDocket No.:50-395 License No.:NPF-12 Report No.:05000395/2006003 Licensee:South Carolina Electric & Gas (SCE&G) Company Facility:Virgil C. Summer Nuclear Station Location:P. O. Box 88Jenkinsville, SC 29065Dates:April 1, 2006 - July 1, 2006 Inspectors:J. Zeiler, Senior Resident Inspector M. Cain, Resident Inspector R. Taylor, Reactor Inspector, RII (Section 4OA5.1)Approved by:K. D. Landis, ChiefReactor Projects Branch 5 Division of Reactor Projects Enclosure
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTIONREPORT 05000395/2006003Distribution w/encl
:R. Martin, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC EnclosureU. S. NUCLEAR REGULATORY COMMISSIONREGION IIDocket No.:50-395 License No.:NPF-12 Report No.:05000395/2006003 Licensee:South Carolina Electric & Gas (SCE&G) Company Facility:Virgil C. Summer Nuclear Station Location:P. O. Box 88Jenkinsville, SC 29065Dates:April 1, 2006 - July 1, 2006 Inspectors:J. Zeiler, Senior Resident Inspector M. Cain, Resident Inspector R. Taylor, Reactor Inspector, RII (Section 4OA5.1)Approved by:K. D. Landis, ChiefReactor Projects Branch 5 Division of Reactor Projects Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000395/2006003; 04/01/2006 - 07/01/2006; Virgil C. Summer Nuclear Station;Identification and Resolution of Problems.The report covered a three-month period of inspection by resident inspectors and oneannounced inspection by a regional inspector. One Green NRC-identified non-cited violation(NCV) was identified. The significance of most findings is indicated by their color (Green,
IR 05000395/2006003; 04/01/2006 - 07/01/2006; Virgil C. Summer Nuclear Station;Identification and Resolution of Problems.The report covered a three-month period of inspection by resident inspectors and oneannounced inspection by a regional inspector. One Green  


White, Yellow, Red) using IMC 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercialnuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 3,dated July 2000.A.NRC-Identified and Self-Revealing Findings
NRC-identified non-cited violation(NCV) was identified. The significance of most findings is indicated by their color (Green,
White, Yellow, Red) using IMC 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercialnuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 3,dated July 2000.A.
 
===NRC-Identified and Self-Revealing Findings===


===Cornerstone: Mitigating Systems===
===Cornerstone: Mitigating Systems===
Line 78: Line 91:
No findings of significance were identified.
No findings of significance were identified.


{{a|R04}}
5Enclosure1R04Equipment Alignment
==R04 Equipment Alignment==


===.1 Partial System Walkdowns===
===.1 Partial System Walkdowns===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors conducted three partial equipment alignment walkdowns (listed below) toevaluate the operability of selected redundant trains or backup systems with the othertrain or system inoperable or out-of-service (OOS). Correct alignment and operatingconditions were determined from the applicable portions of drawings, system operatingprocedures (SOPs), Final Safety Analysis Report (FSAR), and technical specifications (TS). The inspections included review of outstanding maintenance work requests (MWRs) and related Condition Evaluation Reports (CERs) to verify that the licensee had properly identified and resolved equipment alignment problems that could impact mitigating system availability. Documents reviewed are listed in the Attachment.*"A" emergency diesel generator (EDG) while the "B" EDG was OOS duringscheduled maintenance for intercooler performance troubleshooting;*"A" service water (SW) and service water booster pump (SWBP) while the "B"SW/SWBP was OOS for scheduled maintenance; and,*"A" reactor building (RB) spray pump while the "B" RB spray pump was OOS forscheduled maintenance.
The inspectors conducted three partial equipment alignment walkdowns (listed below) toevaluate the operability of selected redundant trains or backup systems wit h the othertrain or system inoperable or out-of-service (OOS). Correct alignment and operatingconditions were determined from the applicable portions of drawings, system operatingprocedures (SOPs), Final Safety Analysis Report (FSAR), and technical specifications (TS). The inspections included review of outstanding maintenance work requests (MWRs) and related Condition Evaluation Reports (CERs) to verify that the licensee had properly identified and resolved equipment alignment problems that could impact mitigating system availability. Documents reviewed are listed in the Attachment.*"A" emergency diesel generator (EDG) while the "B" EDG was OOS duringscheduled maintenance for intercooler performance troubleshooting;*"A" service water (SW) and service water booster pump (SWBP) while the "B"SW/SWBP was OOS for scheduled maintenance; and,*"A" reactor building (RB) spray pump while the "B" RB spray pump was OOS forscheduled maintenance.


====b. Findings====
====b. Findings====
Line 92: Line 104:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed a detailed review and walkdown of the SWBPs and relatedpiping system to identify any discrepancies between the current operating systemequipment lineup and the designed lineup. This walkdown included accessible areas outside the containment. In addition, the inspectors reviewed completed surveillanceprocedures, outstanding MWRs, system health reports, and SWBP related CERs toverify that the licensee had properly identified and resolved equipment problems thatcould affect the availability and operability of the system. Documents reviewed arelisted in the Attachment.
The inspectors performed a detailed review and walkdown of the SWBPs and relatedpiping system to identify any discrepancies between the current operati ng syst emequipment lineup and the designed lineup. This walkdown included accessible areas outside the containment. In addition, the inspectors reviewed completed surveillanceprocedures, outstanding MWRs, system health reports, and SWBP related CERs toverify that the licensee had properly identified and resolved equipment problems thatcould affect the availability and operability of the system. Documents reviewed arelisted in the Attachment.


====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.


{{a|R05}}
6Enclosure1R05Fire Protection
==R05 Fire Protection==


====a. Inspection Scope====
====a. Inspection Scope====
Line 108: Line 119:


====b. Findings====
====b. Findings====
No findings of significance were identified.1R06Flood Protection Measures
No findings of significance were identified.
{{a|1R06}}
==1R06 Flood Protection Measures==


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed and walked down two areas (i.e., service water pumphouse   and auxiliary building AB-374' elevation) regarding internal flood protection features andequipment to determine consistency with design requirements, FSAR, and flood analysis documents. Risk significant structures, systems, and components in theseareas included the service water pumps and related switchgear, residual heat removal (RHR), and RB spray pumps. The inspectors reviewed the licensee's CAP database toverify that internal flood protection problems were being identified at the appropriate level, entered into the CAP, and appropriately resolved.
The inspectors reviewed and walked down two areas (i.e., service water pumphouse and auxiliary building AB-374' elevation) regarding internal flood protection features andequipment to determine consistency with design requirements, FSAR, and flood analysis documents. Risk significant structures, systems, and components in theseareas included the service water pumps and related switchgear, residual heat removal (RHR), and RB spray pumps. The inspectors reviewed the licensee's CAP database toverify that internal flood protection problems were being identified at the appropriate level, entered into the CAP, and appropriately resolved.


====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.


{{a|R07}}
7Enclosure1R07Heat Sink PerformanceAnnual Review
==R07 Heat Sink PerformanceAnnual Review==


====a. Inspection Scope====
====a. Inspection Scope====
Line 123: Line 135:


====b. Findings====
====b. Findings====
No findings of significance were identified.1R11Licensed Operator Requalification Program
No findings of significance were identified.
{{a|1R11}}
==1R11 Licensed Operator Requalification Program==


====a. Inspection Scope====
====a. Inspection Scope====
Line 131: Line 145:


====b. Findings====
====b. Findings====
No findings of significance were identified.1R12Maintenance Effectiveness
No findings of significance were identified.
{{a|1R12}}
==1R12 Maintenance Effectiveness==


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors evaluated two equipment issues described in the CERs listed below toverify the licensee's effectiveness of the corresponding preventive or corrective maintenance associated with structures, systems or components (SSCs). The  
The inspectors evaluated two equipment issues described in the CERs listed below toverify the licensee's effectiveness of the corresponding preventive or corrective maintenance associated with structures, systems or components (SSCs). The 8Enclosureinspectors reviewed maintenance rule (MR) implementation to verify that componentand equipment failures were identified, entered, and scoped within the MR program. Selected SSCs were reviewed to verify proper categorization and classification in accordance with 10 CFR 50.65. The inspectors examined (a)(1) corrective action plans to determine if the licensee was identifying issues related to the MR at an appropriate threshold and that corrective actions were established and effective. The inspectors' review also evaluated if maintenance preventable functional failures (MPFF) or other MR findings existed that the licensee had not identified. The inspectors reviewed thelicensee's controlling procedures, i.e., engineering services procedure (ES)-514, "Maintenance Rule Implementation," and the Virgil C. Summer "Important ToMaintenance Rule System Function and Performance Criteria Analysis" to verify consistency with the MR requirements.*CER 0-C-06-0537, jumpered thermal overload found in "B" boric acid transferpump breaker; and,*CER 0-C-06-1449, "A" EDG room cooling fan, XFN0075B, tripped.
 
inspectors reviewed maintenance rule (MR) implementation to verify that componentand equipment failures were identified, entered, and scoped within the MR program. Selected SSCs were reviewed to verify proper categorization and classification in accordance with 10 CFR 50.65. The inspectors examined (a)(1) corrective action plans to determine if the licensee was identifying issues related to the MR at an appropriate threshold and that corrective actions were established and effective. The inspectors' review also evaluated if maintenance preventable functional failures (MPFF) or other MR findings existed that the licensee had not identified. The inspectors reviewed thelicensee's controlling procedures, i.e., engineering services procedure (ES)-514,
"Maintenance Rule Implementation," and the Virgil C. Summer "Important ToMaintenance Rule System Function and Performance Criteria Analysis" to verify consistency with the MR requirements.*CER 0-C-06-0537, jumpered thermal overload found in "B" boric acid transferpump breaker; and,*CER 0-C-06-1449, "A" EDG room cooling fan, XFN0075B, tripped.


====b. Findings====
====b. Findings====
No findings of significance were identified.1R13Maintenance Risk Assessments and Emergent Work Control
No findings of significance were identified.
{{a|1R13}}
==1R13 Maintenance Risk Assessments and Emergent Work Control==


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the licensee's assessments of the risk impacts of removingfrom service those components associated with planned and emergent work items. Theinspectors evaluated the five selected work activities listed below for: (1) theeffectiveness of the risk assessments performed before maintenance activities wereconducted; (2) the management of risk; (3) that, upon identification of an unforseensituation, necessary steps were taken to plan and control the resulting emergent work activities; and (4) that emergent work problems were adequately identified and resolved.
The inspectors reviewed the licensee's assessments of the risk impacts of removingfrom service those components associated with planned and emergent work items. Theinspectors evaluated the five selected work activities listed below for:
 
: (1) theeffectiveness of the risk assessments performed before maintenance activities wereconducted;
The inspectors evaluated the licensee's work prioritization and risk characterization to determine, as appropriate, whether necessary steps were properly planned, controlled, and executed for the planned and emergent work activities listed below:*Work Week 2006-14, risk assessment for troubleshooting excessive turbineinboard bearing oil leakage from the TDEFW and investigation of "B" EDG reduced intercooler heat exchanger performance;*Work Week 2006-16, risk assessment for "B" EDG intercooler and lube oil coolerthermostatic control valve inspections with "B" EDG and "C" circulating water pump OOS;*Work Week 2006-17, risk assessment for emergent maintenance due tounexpected "B" EDG trip on high crankcase pressure during surveillance testing;*Work Week 2006-18, risk assessment for scheduled switchyard work, "B"SW/SWBP OOS for scheduled maintenance, "B" motor driven emergency
: (2) the management of risk;
: (3) that, upon identification of an unforseensituation, necessary steps were taken to plan and control the resulting emergent work activities; and
: (4) that emergent work problems were adequately identified and resolved.


feedwater pump OOS for scheduled testing, and "B" RB spray pump OOS forscheduled maintenance; and,*Work Week 2006-19, risk assessment for "A" EDG OOS for scheduledmaintenance, "C" SW pump OOS for scheduled motor rewind and traveling screen replacement, and "C" circulating water pump OOS.
The inspectors evaluated the licensee's work prioritization and risk characterization to determine, as appropriate, whether necessary steps were properly planned, controlled, and executed for the planned and emergent work activities listed below:*Work Week 2006-14, risk assessment for troubleshooting excessive turbineinboard bearing oil leakage from the TDEFW and investigation of "B" EDG reduced intercooler heat exchanger performance;*Work Week 2006-16, risk assessment for "B" EDG intercooler and lube oil coolerthermostatic control valve inspections with "B" EDG and "C" circulating water pump OOS;*Work Week 2006-17, risk assessment for emergent maintenance due tounexpected "B" EDG trip on high crankcase pressure during surveillance testing;*Work Week 2006-18, risk assessment for scheduled switchyard work, "B"SW/SWBP OOS for scheduled maintenance, "B" motor driven emergency 9Enclosurefeedwater pump OOS for scheduled testing, and "B" RB spray pump OOS forscheduled maintenance; and,*Work Week 2006-19, risk assessment for "A" EDG OOS for scheduledmaintenance, "C" SW pump OOS for scheduled motor rewind and traveling screen replacement, and "C" circulating water pump OOS.


====b. Findings====
====b. Findings====
No findings of significance were identified.1R14Operator Performance During Non-Routine Evolutions and Events
No findings of significance were identified.
{{a|1R14}}
==1R14 Operator Performance During Non-Routine Evolutions and Events==


====a. Inspection Scope====
====a. Inspection Scope====
Line 159: Line 178:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed five operability evaluations affecting risk significant mitigatingsystems to assess, as appropriate: (1) the technical adequacy of the evaluations; (2)whether operability was properly justified and the subject component or systemremained available, such that no unrecognized increase in risk occurred; (3) whether other existing degraded conditions were considered; (4) where compensatory measures were involved, whether the compensatory measures were in place, would work as intended, and were appropriately controlled; and (5) the impact on TS limiting conditions for operations and the risk significance in accordance with the Significance Determination Process (SDP). Also, the inspectors verified that the operabilityevaluations were performed in accordance with station administrative procedure (SAP)-999, "Corrective Action Program."*CER 0-C-06-1091, "B" EDG intercooler heat exchanger (XHE0017B-HE3) doesnot meet the design basis limiting condition of ES-560.211, "SW Heat ExchangerPerformance;"  
The inspectors reviewed five operability evaluations affecting risk significant mitigatingsystems to assess, as appropriate:
 
: (1) the technical adequacy of the evaluations; (2)whether operability was properly justified and the subject component or systemremained available, such that no unrecognized increase in risk occurred;
*CER 0-C-06-1135, 7300 process instrumentation and control system circuitbreakers found to be 35 amps versus recommended 30 amps;*CER 0-C-06-1252, hot spots identified during thermography of pressurizerbackup heater power panel;*CER 0-C-06-1500, foreign substance found on post-accident monitoringinstrumentation isolation circuit boards; and,*CER 0-C-06-1974, "B" component cooling water heat exchanger degraded heattransfer capability.
: (3) whether other existing degraded conditions were considered;
: (4) where compensatory measures were involved, whether the compensatory measures were in place, would work as intended, and were appropriately controlled; and
: (5) the impact on TS limiting conditions for operations and the risk significance in accordance with the Significance Determination Process (SDP). Also, the inspectors verified that the operabilityevaluations were performed in accordance with station administrative procedure (SAP)-999, "Corrective Action Program."*CER 0-C-06-1091, "B" EDG intercooler heat exchanger (XHE0017B-HE3) doesnot meet the design basis limiting condition of ES-560.211, "SW Heat ExchangerPerformance;"
10Enclosure*CER 0-C-06-1135, 7300 process instrumentation and control system circuitbreakers found to be 35 amps versus recommended 30 amps;*CER 0-C-06-1252, hot spots identified during thermography of pressurizerbackup heater power panel;*CER 0-C-06-1500, foreign substance found on post-accident monitoringinstrumentation isolation circuit boards; and,*CER 0-C-06-1974, "B" component cooling water heat exchanger degraded heattransfer capability.


====b. Findings====
====b. Findings====
No findings of significance were identified.1R19Post-Maintenance Testing
No findings of significance were identified.
{{a|1R19}}
==1R19 Post-Maintenance Testing==


====a. Inspection Scope====
====a. Inspection Scope====
For the six maintenance activities listed below, the inspectors reviewed the associatedpost-maintenance testing (PMT) procedures and witnessed either the testing and/or reviewed test records to assess whether: (1) the effect of testing on the plant had been adequately addressed by control room and/or engineering personnel; (2) testing was adequate for the maintenance performed; (3) test acceptance criteria were clear and adequately demonstrated operational readiness consistent with design and licensing basis documents; (4) test instrumentation had current calibrations, range, and accuracy consistent with the application; (5) tests were performed as written with applicable prerequisites satisfied; (6) jumpers installed or leads lifted were properly controlled; (7)test equipment was removed following testing; and (8) equipment was returned to the status required to perform its safety function. The inspectors verified that these activities were performed in accordance with general test procedure (GTP)-214, "Post Maintenance Testing Guideline."*PMT for investigating excessive turbine inboard bearing oil leakage on TDEFWpump (MWR 0603864);*PMT for "B" EDG following inspections of intercooler heat exchanger and repairof associated thermostatic control valve (MWRs 0604121 and 0604130);*PMT for "B" EDG following emergent repair from high crankcase pressure trip(MWR 0605499);*PMT for "B" RB spray pump following scheduled preventive maintenance (MWRs0522148 and 0526652);*PMT for emergent replacement of failed isolator circuit board in the BypassInoperable Status Indication (BISI) system resulting in de-energization of 7200volt safety-related electrical bus (MWR 0605610); and,*PMT for "C" SW pump following motor and traveling screen replacement (MWR0601586).
For the six maintenance activities listed below, the inspectors reviewed the associatedpost-maintenance testing (PMT) procedures and witnessed either the testing and/or reviewed test records to assess whether:
: (1) the effect of testing on the plant had been adequately addressed by control room and/or engineering personnel;
: (2) testing was adequate for the maintenance performed;
: (3) test acceptance criteria were clear and adequately demonstrated operational readiness consistent with design and licensing basis documents;
: (4) test instrumentation had current calibrations, range, and accuracy consistent with the application;
: (5) tests were performed as written with applicable prerequisites satisfied;
: (6) jumpers installed or leads lifted were properly controlled; (7)test equipment was removed following testing; and
: (8) equipment was returned to the status required to perform its safety function. The inspectors verified that these activities were performed in accordance with general test procedure (GTP)-214, "Post Maintenance Testing Guideline."*PMT for investigating excessive turbine inboard bearing oil leakage on TDEFWpump (MWR 0603864);*PMT for "B" EDG following inspections of intercooler heat exchanger and repairof associated thermostatic control valve (MWRs 0604121 and 0604130);*PMT for "B" EDG following emergent repair from high crankcase pressure trip(MWR 0605499);*PMT for "B" RB spray pump following scheduled preventive maintenance (MWRs0522148 and 0526652);*PMT for emergent replacement of failed isolator circuit board in the BypassInoperable Status Indication (BISI) system resulting in de-energization of 7200volt safety-related electrical bus (MWR 0605610); and,*PMT for "C" SW pump following motor and traveling screen replacement (MWR0601586).


====b. Findings====
====b. Findings====
No findings of significance were identified.1R22Surveillance Testing
No findings of significance were identified.
{{a|1R22}}
==1R22 Surveillance Testing==


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed and/or reviewed the five surveillance tests listed below to verifythat TS surveillance requirements were followed and that test acceptance criteria were properly specified to ensure that the equipment could perform its intended safety function. The inspectors verified that proper test conditions were established as specified in the procedures, that no equipment preconditioning activities occurred, and that acceptance criteria had been met.In-Service Tests:*STP-225.001A, "Diesel Generator B Support System Pump and Valve Test(Group B)" Reactor Coolant System Leakage Tests:*STP-114.002, "Operational Leakage Test" Other Surveillance Tests:*STP-125.013B, "Diesel Generator B Semiannual Operability Test;"*STP-2005.003, "Charging / Safety Injection Pump and Valve Test" (for "C"pump); and,*STP-105.006, "Safety Injection / Residual Heat Removal Monthly Flow PathVerification Test."
The inspectors observed and/or reviewed the five surveillance tests listed below to verifythat TS surveillance requirements were followed and that test acceptance criteria were properly specified to ensure that the equipment could perform its intended safety function. The inspectors verified that proper test conditions were established as specified in the procedures, that no equipment preconditioning activities occurred, and that acceptance criteria had been met.In-Service Tests
:*STP-225.001A, "Diesel Generator B Support System Pump and Valve Test(Group B)" Reactor Coolant System Leakage Tests
:*STP-114.002, "Operational Leakage Test" Other Surveillance Tests
:*STP-125.013B, "Diesel Generator B Semiannual Operability Test;"*STP-2005.003, "Charging / Safety Injection Pump and Valve Test" (for "C"pump); and,*STP-105.006, "Safety Injection / Residual Heat Removal Monthly Flow PathVerification Test."


====b. Findings====
====b. Findings====
No findings of significance were identified.1R23Temporary Plant Modifications
No findings of significance were identified.
{{a|1R23}}
==1R23 Temporary Plant Modifications==


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the following equipment change that was considered atemporary modification. The inspectors evaluated the change documents and the associated 10 CFR 50.59 screening against the system design basis documentationand FSAR to verify that the change did not adversely affect the safety function of important safety systems. In addition, the inspectors verified that the changes weredeveloped and implemented in accordance with licensee procedure SAP-148,
The inspectors reviewed the following equipment change that was considered atemporary modification. The inspectors evaluated the change documents and the associated 10 CFR 50.59 screening against t he system design basis documentationand FSAR to verify that the change did not adversely affect the safety function of important safety systems. In addition, the inspectors verified that the changes weredeveloped and implemented in accordance with licensee procedure SAP-148, "Temporary Bypass, Jumper, and Lifted Lead Control."
"Temporary Bypass, Jumper, and Lifted Lead Control."


*Bypass Authorization Request (BAR) 06-03, isolation of BISI indication for "C"component cooling water pump status due to failed circuit board (CER 0-C-06-1440).
12Enclosure*Bypass Authorization Request (BAR) 06-03, isolation of BISI indication for "C"component cooling water pump status due to failed circuit board (CER 0-C-06-1440).


====b. Findings====
====b. Findings====
Line 188: Line 225:


====a. Inspection Scope====
====a. Inspection Scope====
On May 24, 2006, the inspectors reviewed and observed the performance of anEmergency Planning Drill that involved a simulated station loss of offsite and onsiteelectrical AC power followed by a reactor coolant pump seal loss-of-coolant accident and total loss of emergency feedwater makeup (EPP-06-02B, "Emergency Planning Drill," Revision 0). The inspectors assessed emergency procedure usage, emergencyplan classification, notifications and the licensee's identification and entrance of drillproblems into their CAP. This inspection evaluated the adequacy of the licensee's conduct of the drill and critique performance. Drill issues were captured by the licenseein CERs 0-C-06-1838 through 0-C-06-1843 and were reviewed by the inspectors.
On May 24, 2006, the inspectors reviewed and observed the performance of anEmergency Planning Drill that involved a simulated station loss of offsite and onsiteelectrical AC power followed by a reactor coolant pump seal loss-of-coolant accident and total loss of emergency feedwater makeup (EPP-06-02B, "Emergency Planning Drill," Revision 0). The inspectors assessed emergency procedure usage, emergencyplan classification, notifications and the licensee's identification and entrance of drillproblems into their CAP. This inspection evaluated the adequacy of the licensee's conduct of the dr ill and critique performance. Drill issues were captured by the licenseein CERs 0-C-06-1838 through 0-C-06-1843 and were reviewed by the inspectors.


====b. Findings====
====b. Findings====
Line 211: Line 248:
A Green NRC-identified non-cited violation (NCV) of 10 CFR Part 50,Appendix B, Criterion XVI, "Corrective Action," was identified for the failure to take adequate and timely corrective actions to preclude repetition of a significant condition adverse to quality to prevent the spurious tripping of safety-related molded case circuit breakers due to asymmetrical in-rush current.Description. In July 1992, the NRC issued Information Notice (IN) 92-51,"Misapplication and Inadequate Testing of Molded-Case Circuit Breakers (MCCBs)."
A Green NRC-identified non-cited violation (NCV) of 10 CFR Part 50,Appendix B, Criterion XVI, "Corrective Action," was identified for the failure to take adequate and timely corrective actions to preclude repetition of a significant condition adverse to quality to prevent the spurious tripping of safety-related molded case circuit breakers due to asymmetrical in-rush current.Description. In July 1992, the NRC issued Information Notice (IN) 92-51,"Misapplication and Inadequate Testing of Molded-Case Circuit Breakers (MCCBs)."


This notice informed addressees about problems that can cause certain MCCBs to trip when starting their safety-related motor loads due to in-rush transient (asymmetrical)currents. This IN was later supplemented in April 1994 with more specific guidance concerning recommended industry test methods. The inspectors noted that the licensee's evaluation of IN 92-51 and its supplement, concluded that the issue did not affect Virgil C. Summer Nuclear Station and that no actions were necessary. In February of 1999, during investigation and evaluation of a spurious trip of the "B"Control Room (CR) Emergency Filtering System Fan (XFN0030B-M), the licensee documented in CER 0-C-99-0084 that several (36) safety-related motors supplied by molded case circuit breakers were "susceptible," (i.e., calculated minimum trip to maximum locked rotor current ratio of 2.0 or less), to spurious tripping caused by asymmetrical in-rush currents. Of those 36 susceptible motor loads, nine of them were subsequently evaluated as "most susceptible," (i.e., calculated minimum trip to maximum locked rotor current ratio of 1.38 or less), to spurious tripping caused by asymmetrical in-rush currents. The ratio of 1.38 or less was arbitrarily chosen based upon the fact that the "B" CR Emergency Filtering System Fan motor had experienced the spurious trip with a ratio of 1.38. Several options were discussed including replacing the magnetic-only breakers with thermal-magnetic breakers that have a higherinstantaneous trip value. After discussions with the Electrical Shop Supervision, the most cost effective solution was determined to be elimination of the lower half of the present breaker setting acceptance criteria. The setpoint tolerance was +/- 15%;
This notice informed addressees about problems that can cause certain MCCBs to trip when starting their safety-related motor loads due to in-rush transient (asymmetrical)currents. This IN was later supplemented in April 1994 with more specific guidance concerning recommended industry test methods. The inspectors noted that the licensee's evaluation of IN 92-51 and its supplement, concluded that the issue did not affect Virgil C. Summer Nuclear Station and that no actions were necessary. In February of 1999, during investigation and evaluation of a spurious trip of the "B"Control Room (CR) Emergency Filtering System Fan (XFN0030B-M), the licensee documented in CER 0-C-99-0084 that several
: (36) safety-related motors supplied by molded case circuit breakers were "susceptible," (i.e., calculated minimum trip to maximum locked rotor current ratio of 2.0 or less), to spurious tripping caused by asymmetrical in-rush currents. Of those 36 susceptible motor loads, nine of them were subsequently evaluated as "most susceptible," (i.e., calculated minimum trip to maximum locked rotor current ratio of 1.38 or less), to spurious tripping caused by asymmetrical in-rush currents. The ratio of 1.38 or less was arbitrarily chosen based upon the fact that the "B" CR Emergency Filtering System Fan motor had experienced the spurious trip with a ratio of 1.38. Several options were discussed including replacing the magnetic-only breakers with thermal-magnetic breakers that have a higherinstantaneous trip value. After discussions with the Electrical Shop Supervision, the most cost effective solution was determined to be elimination of the lower half of the present breaker setting acceptance criteria. The setpoint tolerance was +/- 15%;
however, for these selected breakers, the new tolerance was changed to -0% to +15%
however, for these selected breakers, the new tolerance was changed to -0% to +15%
to correct the spurious tripping condition/susceptibility.
to correct the spurious tripping condition/susceptibility.


Though all four of the EDG room ventilation supply fans were identified during thatevaluation as being "susceptible," no corrective actions were taken to preclude any spurious trips due to asymmetrical in-rush currents at that time due to their calculated minimum trip to maximum locked rotor current ratio being 1.47. In June, 2004, the breaker for "A" EDG room ventilation supply fan (XFN0075A), was found tripped.
14EnclosureThough all four of the EDG room ventilation supply fans were identified during thatevaluation as being "susceptible," no corrective actions were taken to preclude any spurious trips due to asymmetrical in-rush currents at that time due to their calculated minimum trip to maximum locked rotor current ratio being 1.47. In June, 2004, the breaker for "A" EDG room ventilation supply fan (XFN0075A), was found tripped.


Further investigation attributed the cause to asymmetrical in-rush current. As a result of this event, all four EDG room ventilation supply fans breaker setting acceptance criteria was adjusted to change the as-left tolerances from +/- 15% to -0% to +15%. On April 28, 2006, the breaker for "A" EDG room ventilation supply fan "B" (XFN0075B), was found tripped. Subsequent investigation attributed the cause to asymmetrical in-rush current. Post trip calibration results revealed that the "as-found" trip setting of the breaker was within the previously modified tolerance range of -0% to +15%. The inspectors determined that the licensee's corrective actions to date to address the industry known issue with spurious tripping of magnetic only MCCBs due to asymmetrical in-rush currents have been ineffective. The licensee has entered this issue in its CAP for resolution.Analysis. This finding is more than minor because it affected the mitigating systemscornerstone attribute of equipment performance (i.e., Emergency Diesel Generator) and adversely affected the cornerstone objective of ensuring the availability, reliability andcapability of systems that respond to initiating events. On an emergency start of theEDGs, both ventilation cooling fans in each EDG room are designed to auto-start to provide room cooling. If either fan experienced a spurious trip due to the in-rush current phenomenon, the operators would be immediately alerted to the condition via fan tripalarms in the control room. The inspectors reviewed alarm response procedures and determined that adequate guidance and time existed for the operators to reset the fanmotor breakers located in the EDG rooms and restart the fans prior to exceeding design basis room temperatures that might challenge the capability of the EDGs to performtheir designed safety function. Thus, a SDP Phase 1 analysis characterized the finding as being of very low safety significance because it did not result in a loss of safety function of one or more trains of the EDGs and was not potentially risk-significant due to possible external events. The direct cause of this finding involved the cross-cutting area of Problem Identification and Resolution, in that, the identified corrective actions were not adequate to resolve the fans tripping due to asymmetrical in-rush current.Enforcement. 10 CFR 50, Appendix B, Criterion XVI, "Corrective Action," requires, inpart, that measures be established to assure that conditions adverse to quality are promptly identified and corrected. In addition, for significant conditions adverse to quality, measures shall assure that the cause of the condition is determined and corrective actions be taken to preclude repetition. Contrary to this, the licensee failed to take adequate corrective actions and prevent repetition following the failure of CR Emergency Filtering System Fan "B" (XFN0030B-M) in February of 1999, CR Emergency Filtering System Fan "A" (XFN0030A-M) in August of 2000, and "A" EDG room ventilation supply fan "A" (XFN0075A) on June 9, 2004. As a result, a repetitive condition was discovered on April 28, 2006, with the "A" EDG room ventilation supply fan "B" (XFN0075B) tripping due to the same conditions identified for the "A" EDG fan in 2004. Because the finding is of very low safety significance and has been entered into  
Further investigation attributed the cause to asymmetrical in-rush current. As a result of this event, all four EDG room ventilation supply fans breaker setting acceptance criteria was adjusted to change the as-left tolerances from +/- 15% to -0% to +15%. On April 28, 2006, the breaker for "A" EDG room ventilation supply fan "B" (XFN0075B), was found tripped. Subsequent investigation attributed the cause to asymmetrical in-rush current. Post trip calibration results revealed that the "as-found" trip setting of the breaker was within the previously modified tolerance range of -0% to +15%. The inspectors determined that the licensee's corrective actions to date to address the industry known issue with spurious tripping of magnetic only MCCBs due to asymmetrical in-rush currents have been ineffective. The licensee has entered this issue in its CAP for resolution.Analysis. This finding is more than minor because it affected the mitigati ng systemscornerstone attribute of equipment performance (i.e., Emergency Diesel Generator) and adversely affected the cornerstone objective of ensuring the availability, reliability andcapability of systems that respond to initiating events. On an emergency start of theEDGs, both ventilation cooling fans in each EDG room are designed to auto-start to provide room cooling. If either fan experienced a spurious trip due to the in-rush current phenomenon, the operators would be immediately alerted to the condition via fan tripalarms in the control room. The inspectors reviewed alarm response procedures and determined that adequate guidance and time existed for the operators to reset the fanmotor breakers located in the EDG rooms and restart the fans prior to exceeding design basis room temperatures that might challenge the capability of the EDGs to performtheir designed safety function. Thus, a SDP Phase 1 analysis characterized the finding as being of very low safety significance because it did not result in a loss of safety function of one or more trains of the EDGs and was not potentially risk-significant due to possible external events. The direct cause of this finding involved the cross-cutting area of Problem Identification and Resolution, in that, the identified corrective actions were not adequate to resolve the fans tripping due to asymmetrical in-rush current.Enforcement. 10 CFR 50, Appendix B, Criterion XVI, "Corrective Action," requires, inpart, that measures be established to assure that conditions adverse to quality are promptly identified and corrected. In addition, for significant conditions adverse to quality, measures shall assure that the cause of the condition is determined and corrective actions be taken to preclude repetition. Contrary to this, the licensee failed to take adequate corrective actions and prevent repetition following the failure of CR Emergency Filtering System Fan "B" (XFN0030B-M) in February of 1999, CR Emergency Filtering System Fan "A" (XFN0030A-M) in August of 2000, and "A" EDG room ventilation supply fan "A" (XFN0075A) on June 9, 2004. As a result, a repetitive condition was discovered on April 28, 2006, with the "A" EDG room ventilation supply fan "B" (XFN0075B) tripping due to the same conditions identified for the "A" EDG fan in 2004. Because the finding is of very low safety significance and has been entered into 15Enclosurethe licensee's CAP as CER 0-C-06-1449, this violation is being treated as a NCV,consistent with Section VI.A of the NRC Enforcement Policy: NCV 05000395/2006003-01, Failure to Take Adequate and Timely Corrective Actions to Preclude Repetitive Spurious Tripping of Safety Related Molded Case Circuit Breakers.
 
the licensee's CAP as CER 0-C-06-1449, this violation is being treated as a NCV,consistent with Section VI.A of the NRC Enforcement Policy: NCV 05000395/2006003-01, Failure to Take Adequate and Timely Corrective Actions to Preclude Repetitive Spurious Tripping of Safety Related Molded Case Circuit Breakers.


===.3 Semi-Annual Trend Review===
===.3 Semi-Annual Trend Review===
Line 232: Line 268:


===.1 (Closed)===
===.1 (Closed)===
Unresolved Item (URI) 05000395/2004009-02: Tornado Missile Vulnerabilitiesof Outdoor ComponentsAs described in URI 05000395/2004009-02, NRC inspectors identified several outdoorcomponents that were important for safe shutdown not protected from potential tornadomissile damage. The licensee had not evaluated the tornado missile vulnerability ofthose outdoor components as apparently described in the FSAR. This URI was left open for further NRC review of the related licensing basis requirements. Upon further review, the NRC determined that FSAR Section 3.5.1.4, describes thelicensing basis used at the station for evaluating specific missile types generated by the design tornado. In addition, based on the equation described in the FSAR, the NRC determined that the licensee was required to consider the tornado missile vulnerability ofboth indoor and outdoor safe shutdown components.  (The evaluation performed by the  
Unresolved Item (URI) 05000395/2004009-02: Tornado Missile Vulnerabilitiesof Outdoor ComponentsAs described in URI 05000395/2004009-02, NRC inspectors identified several outdoorcomponents that were important for safe shutdown not protected from potential tornadomissile damage. The licensee had not evaluated the tornado missile vulnerability ofthose outdoor components as apparently described in the FSAR. This URI was left open for further NRC review of the related licensing basis requirements. Upon further review, the NRC determined that FSAR Section 3.5.1.4, describes thelicensing basis used at the station for evaluating specific missile types generated by the design tornado. In addition, based on the equation described in the FSAR, the NRC determined that the licensee was required to consider the tornado missile vulnerability ofboth indoor and outdoor safe shutdown components.  (The evaluation performed by the 16Enclosurelicensee prior to the inspection only considered the tornado missile vulnerability ofindoor safe shutdown components.)  In addition, per the FSAR, this cumulative probability was to be less than 1 E-7 per year.The licensee's failure to include the risk of tornado missile damage to unprotectedoutdoor components represented a finding and a violation of 10 CFR 50, Appendix B,Criterion III, Design Control. The inspector reviewed the licensee's corrective actions as documented in CER 0-C-04-3637 and CER 0-C-04-3778. On May 3, 2006, the inspector made a site visit and walked down the unprotected outdoor components. In addition, the inspector reviewed the licensee's preliminary calculation for the cumulative missile strike probability for all indoor and outdoor components and discussed the issuewith licensee engineers. The inspector found that this revised cumulative missile strike probability, including the indoor and outdoor components, was substantially below theFSAR threshold of 1 E-7 per year. Because the consideration of outdoor components did not cause the overall missile strike probability for safe shutdown components toexceed the value specified in the FSAR, this finding was of minor significance. URI 05000395/2004009-02 is closed.
 
licensee prior to the inspection only considered the tornado missile vulnerability ofindoor safe shutdown components.)  In addition, per the FSAR, this cumulative probability was to be less than 1 E-7 per year.The licensee's failure to include the risk of tornado missile damage to unprotectedoutdoor components represented a finding and a violation of 10 CFR 50, Appendix B,Criterion III, Design Control. The inspector reviewed the licensee's corrective actions as documented in CER 0-C-04-3637 and CER 0-C-04-3778. On May 3, 2006, the inspector made a site visit and walked down the unprotected outdoor components. In addition, the inspector reviewed the licensee's preliminary calculation for the cumulative missile strike probability for all indoor and outdoor components and discussed the issuewith licensee engineers. The inspector found that this revised cumulative missile strike probability, including the indoor and outdoor components, was substantially below theFSAR threshold of 1 E-7 per year. Because the consideration of outdoor components did not cause the overall missile strike probability for safe shutdown components toexceed the value specified in the FSAR, this finding was of minor significance. URI 05000395/2004009-02 is closed.


===.2 (Closed) Licensee Event Report (LER) 50-395/2005-002-01: Mode 3 Entry with anInoperable Emergency Feedwater Pump, Supplement 1The inspectors reviewed the subject LER and CER 0-C-05-2300 to verify the accuracyof the LER and the appropriateness of the corrective actions.===
===.2 (Closed) Licensee Event Report (LER) 50-395/2005-002-01: Mode 3 Entry with anInoperable Emergency Feedwater Pump, Supplement 1The inspectors reviewed the subject LER and CER 0-C-05-2300 to verify the accuracyof the LER and the appropriateness of the corrective actions.===
Line 244: Line 278:
"Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants."  Documents reviewed are listed in the Attachment. Appropriate documentation of the results of this inspection was provided to NRC headquarters staff for furtheranalysis, as required by the TI. This completes the Region II inspection TI requirements for the Virgil C. Summer Nuclear Station.
"Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants."  Documents reviewed are listed in the Attachment. Appropriate documentation of the results of this inspection was provided to NRC headquarters staff for furtheranalysis, as required by the TI. This completes the Region II inspection TI requirements for the Virgil C. Summer Nuclear Station.


OA6Meetings, Including ExitExit Meeting SummaryThe inspectors presented the inspection results to Mr. Thomas Gatlin and othermembers of the licensee staff on July 11, 2006. The inspectors confirmed that proprietary information was not provided or examined during the inspection.4OA7Licensee-Identified ViolationsThe following finding of very low safety significance (Green) was identified by thelicensee and is a violation of NRC requirements which met the criteria of Section VI ofthe NRC Enforcement Policy, NUREG-1800, for being dispositioned as an NCV.*TS 6.8.1.a requires, in part, that written procedures be established, implementedand maintained covering activities listed in Regulatory Guide 1.33, Rev. 2, Appendix A, February 1978, which includes procedures for conducting calibrations of equipment required by TS (Section 8.b). Surveillance TestProcedure STP-360.031, "Control Room Supply Air Atmospheric Radiation Monitor RMA0001 Calibration," Rev. 8, was written to accomplish TS required calibrations of control room isolation radiation monitor RM-A1. Step 7.6.4 of theprocedure directed "B" Train CR ventilation system to be placed in "emergency"mode while testing of the "A" Train CR ventilation system. Contrary to therequirements of STP-360.031, on May 17, 2006, the Control Building operatorsecured the "B" Train CR ventilation system from emergency mode during "A"Train ventilation testing. The system was restored nineteen minutes later afterthe Shift Supervisor became aware that the system had been secured from theemergency mode. At the time of the event, RM-A1 was already considered inoperable and the licensee was maintaining the "B" Train CR ventilation systemin emergency mode as part of the requirements of Action Statement 29 of TS 3.3.3.1. The licensee determined that during the nineteen minutes that the "B"CR ventilation was not in service, they were in violation of the requirements of TS 3.3.3.1. This finding is of very low safety significance because of the short duration that the system was not in its required configuration. This issue wasentered into the licensee's CAP as CER 0-C-06-1648.ATTACHMENT:   
17Enclosure4OA6Meetings, Including ExitExit Meeting SummaryThe inspectors presented the inspection results to Mr. Thomas Gatlin and othermembers of the licensee staff on July 11, 2006. The inspectors confirmed that proprietary information was not provided or examined during the inspection.4OA7Licensee-Identified ViolationsThe following finding of very low safety significance (Green) was identified by thelicensee and is a violation of NRC requirements which met the criteria of Section VI ofthe NRC Enforcement Policy, NUREG-1800, for being dispositioned as an NCV.*TS 6.8.1.a requires, in part, that written procedures be established, implementedand maintained covering activities listed in Regulatory Guide 1.33, Rev. 2, Appendix A, February 1978, which includes procedures for conducting calibrations of equipment required by TS (Section 8.b). Surveillance TestProcedure STP-360.031, "Control Room Supply Air Atmospheric Radiation Monitor RMA0001 Calibration," Rev. 8, was written to accomplish TS required calibrations of control room isolation radiation monitor RM-A1. Step 7.6.4 of theprocedure directed "B" Train CR ventilati on system to be placed in "emergency"mode while testing of the "A" Train CR ventilation system. Contrary to therequirements of STP-360.031, on May 17, 2006, the Control Building operatorsecured the "B" Train CR ventilation system from emergency mode during "A"Train ventilation testing. The system was restored nineteen minutes later afterthe Shift Supervisor became aware that the system had been secured from theemergency mode. At the time of the event, RM-A1 was already considered inoperable and the licensee was maintaining the "B" Train CR ventilation systemin emergency mode as part of the requirements of Action Statement 29 of TS 3.3.3.1. The licensee determined that during the nineteen minutes that the "B"CR ventilation was not in service, they were in violation of the requirements of TS 3.3.3.1. This finding is of very low safety significance because of the short duration that the system was not in its required configuration. This issue wasentered into the licensee's CAP as CER 0-C-06-1648.ATTACHMENT:   


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
Licensee
: [[contact::J. Archie]], Vice President, Nuclear Operations
: [[contact::F. Bacon]], Manager, Chemistry Services
: [[contact::M. Browne]], Manager, Quality Systems
: [[contact::A. Cribb]], Acting Supervisor, Nuclear Licensing
: [[contact::M. Findlay]], Manager, Nuclear Protection Services
: [[contact::M. Fowlkes]], General Manager, Engineering Services
: [[contact::D. Gatlin]], General Manager, Nuclear Plant Operations
: [[contact::D. Lavigne]], General Manager, Organizational Effectiveness Training
: [[contact::G. Lippard]], Manager, Operations
: [[contact::G. Moffit]], Manager, Nuclear Operations Training
: [[contact::P. Mothena]], Acting Manager, Health Physics and Safety Services
: [[contact::J. Nesbitt]], Manager, Materials and Procurement
: [[contact::K. Nettles]], General Manager, Nuclear Support Services
: [[contact::R. Stokes]], Manager, Design Engineering
: [[contact::W. Stuart]], Manager, Plant Support Engineering
: [[contact::R. Sweet]], Manager, Nuclear Licensing
: [[contact::A. Torres]], Manager, Planning / Scheduling and Project Management
: [[contact::S. Zarandi]], Manager, Maintenance Services
==ITEMS OPENED, CLOSED, AND DISCUSSED==
===Opened===
NoneOpened and
===Closed===
: [[Closes finding::05000395/FIN-2006003-01]]NCVFailure to Take Adequate and Timely Corrective Actions toPreclude Repetitive Spurious Tripping of Safety Related
: Molded Case Circuit Breakers (Section 4OA2.2)
===Closed===
: [[Closes finding::05000395/FIN-2006003-01]]NCVFailure to Take Adequate and Timely Corrective Actions toPreclude Repetitive Spurious Tripping of Safety Related
: Molded Case Circuit Breakers (Section 4OA2.2)
===Discussed===
None
A-2Attachment
==LIST OF DOCUMENTS REVIEWED==
==Section 1R04: Equipment AlignmentSOP-211, "Emergency Feedwater System"SOP-306, "Emergency Diesel Generator"==
: SOP-307, "Diesel Generator Fuel Oil System"
: SOP-117, "Service Water System" Drawing D-302-221, Service Water Cooling Drawing D-302-222, Service Water Cooling Service Water System Design Basis Document
==Section 1R07: Heat Sink PerformanceProceduresES-560.211, Service Water Heat Exchanger Performance, Rev. 8PTP-213.002, Service Water System Heat Exchanger Data Collection, Rev. 1Section 1R07A:==
===Procedures===
and Completed Procedures (Testing Data)PMTS
: 0601936, Service Water HX Performance For 110% Run (Intercooler HX), 03/29/2006Work Orders Associated With "B" EDG Intercooler
: HXES-560.211, Service Water System Heat Exchanger Performance, Rev. 8PTP-213.002, Service Water System Heat Exchanger Data Collection, Rev. 1Diesel Generator HX Performance Testing Trends Condition Evaluation Reports0-C-06-1091, Intercooler Heat Exchanger (XHE0017B-HE3) does not meet the Design BasisLimiting Conditions of
: ES-560.211 due to apparent fouling on the shell side.
: A-3Attachment
==LIST OF ACRONYMS==
ABAuxiliary BuildingACAlternating Current
BARBypass Authorization Request
BISIBypass Inoperable Status Indication
CAPCorrective Action Program
CERCondition Evaluation Report
CFRCode of Federal Regulations
CRControl Room
ECREngineering Change Request
EDGEmergency Diesel Generator
EOPEmergency Operating Procedure
EPPEmergency Plan Procedure
ESEngineering Services Procedure
FSARFinal Safety Analysis Report
GTPGeneral Test Procedure
HVACHeating, Ventilation, and Air Conditioning
IBIntermediate Building
IMCInspection Manual Chapter
INInformation Notice
LERLicensee Event Report
MCCBMolded Case Circuit Breaker
MDEFWMotor Driven Emergency Feedwater
MPFFMaintenance Preventable Functional Failures
MRMaintenance Rule
MWRMaintenance Work Request
NCVNon-Cited Violation
NRCNuclear Regulatory Commission
OAPOperations Administrative Procedure
OOSOut-of-Service
PMTPost-Maintenance Testing
RBReactor Building
RHRResidual Heat Removal
ROPReactor Oversight Process
RTPRated Thermal Power
SAPStation Administrative Procedure
SDPSignificance Determination Process
SOPSystem Operating Procedure
SSCStructures, Systems, or Components
STPSurveillance Test Procedure
SWService Water
SWBPService Water Booster Pump
SWPHService Water Pumphouse
TDEFWTurbine Driven Emergency Feedwater
TSTechnical Specification
: [[URIU]] [[nresolved Item]]
}}
}}

Revision as of 21:52, 26 October 2018

IR 05000395-06-003; 04/01/2006 - 07/01/2006; Virgil C. Summer Nuclear Station; Identification and Resolution of Problems
ML062080420
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/27/2006
From: Landis K D
NRC/RGN-II/DRP/RPB5
To: Archie J B
South Carolina Electric & Gas Co
References
IR-06-003
Download: ML062080420 (25)


Text

July 27, 2006

South Carolina Electric & Gas CompanyATTN: Mr. Jeffrey Vice President, Nuclear OperationsVirgil C. Summer Nuclear Station

P. O. Box 88 Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTIONREPORT 05000395/2006003

Dear Mr. Archie:

On July 1, 2006, the United States Nuclear Regulatory Commission (NRC) completed aninspection at your Virgil C. Summer Nuclear Station. The enclosed integrated inspection reportdocuments the inspection results, which were discussed on July 11, 2006, with Mr. Thomas Gatlin and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, one NRC-identified finding of very low safetysignificance was identified. This finding was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it was entered into your corrective action program, the NRC is treating this finding as a non-cited violation(NCV) consistent with Section VI.A of the NRC Enforcement Policy. In addition, one licensee-identified violation, which was determined to be of very low safety significance, is listed in Section 4OA7 of this report. If you contest any NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk,Washington, DC 20555-0001, with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Virgil C. Summer Nuclear Station.

SCE&G2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in theNRC Public Document Room or from the Publicly Available Records (PARS) com ponent ofNRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/Kerry D. Landis, Chief Reactor Projects Branch 5 Division of Reactor ProjectsDocket No.: 50-395License No.: NPF-12

Enclosure:

NRC Integrated Inspection Report 05000395/2006003

w/Attachment:

Supplemental Informationcc w/encl: (See page 2)

_________________________OFFICERII:DRPRII:DRPRII:DRPRII:DRPSIGNATUREJXZ per phoneLXC per phoneTLH4 forLXGNAMEJZeilerMCainRTaylorLGarnerDATE07/27/200607/27/200607/27/200607/27/2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO SCE&G3cc w/encl:R. J. White Nuclear Coordinator (Mail Code 802)

S.C. Public Service Authority Virgil C. Summer Nuclear Station Electronic Mail DistributionKathryn M. Sutton, Esq.Morgan, Lewis & Bockius LLP Electronic Mail DistributionHenry J. Porter, DirectorDiv. of Radioactive Waste Mgmt.

Dept. of Health and Environmental Control Electronic Mail DistributionR. Mike GandyDivision of Radioactive Waste Mgmt.

S. C. Department of Health and Environmental Control Electronic Mail DistributionRobert G. Sweet, ManagerNuclear Licensing (Mail Code 830)

South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionRobert M. Fowlkes, General ManagerEngineering Services South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionThomas D. Gatlin, General ManagerNuclear Plant Operations (Mail Code 303)

South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail DistributionDavid A. Lavigne, General ManagerOrganization Development South Carolina Electric & Gas Company Vigil C. Summer Nuclear Station Electronic Mail DistributionDistribution w/encl: (See page 4)

SCE&G4Report to from Kerry D. Landis dated July 27, 2006

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTIONREPORT 05000395/2006003Distribution w/encl

R. Martin, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC EnclosureU. S. NUCLEAR REGULATORY COMMISSIONREGION IIDocket No.:50-395 License No.:NPF-12 Report No.:05000395/2006003 Licensee:South Carolina Electric & Gas (SCE&G) Company Facility:Virgil C. Summer Nuclear Station Location:P. O. Box 88Jenkinsville, SC 29065Dates:April 1, 2006 - July 1, 2006 Inspectors:J. Zeiler, Senior Resident Inspector M. Cain, Resident Inspector R. Taylor, Reactor Inspector, RII (Section 4OA5.1)Approved by:K. D. Landis, ChiefReactor Projects Branch 5 Division of Reactor Projects Enclosure

SUMMARY OF FINDINGS

IR 05000395/2006003; 04/01/2006 - 07/01/2006; Virgil C. Summer Nuclear Station;Identification and Resolution of Problems.The report covered a three-month period of inspection by resident inspectors and oneannounced inspection by a regional inspector. One Green

NRC-identified non-cited violation(NCV) was identified. The significance of most findings is indicated by their color (Green,

White, Yellow, Red) using IMC 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercialnuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 3,dated July 2000.A.

NRC-Identified and Self-Revealing Findings

Cornerstone: Mitigating Systems

Green.

The inspectors identified a non-cited violation of 10 CFR 50 Appendix BCriterion XVI was identified for the licensee's failure to take adequate and timely corrective actions to preclude repetition of a significant condition adverse to quality. Specifically, the licensee failed to prevent the spurious tripping of safety-related molded case circuit breakers for the Emergency Diesel Generator (EDG)room ventilation supply fans due to asymmetrical in-rush current. The licensee has entered this issue in its corrective action program for resolution.This finding is more than minor because it is associated with the MitigatingSystems Cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability and capability ofthe EDGs. The finding is of very low safety significance because it did not result in a loss of safety function of one or more EDG trains and was not potentially risk-significant due to possible external events. The direct cause of this finding involved the cross-cutting area of Problem Identification and Resolution, in that, the identified corrective actions were not adequate to resolve the fans tripping due to asymmetrical in-rush current (Section 4OA2.2).

B.Licensee-Identified Violations

One violation of very low safety significance, which was identified by the licensee, hasbeen reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensee's corrective action program. This violation and the associated corrective action tracking number is listed in Section 4OA7 of this report.

Enclosure

REPORT DETAILS

Summary of Plant StatusThe unit began the inspection period at 100 percent rated thermal power (RTP). On May 26,power was reduced to 75 percent to replace a leaking inboard bearing seal on the "C" feedwater booster pump. The unit was returned to 100 percent RTP on May 29. On June 16, power was reduced to 85 percent to replace a leaking inboard bearing seal on the "C" feedwater booster pump. The unit was returned to 100 percent RTP on June 19 and remained at or near full power for the remainder of the inspection period.1.REACTOR SAFETYCornerstones: Initiating Events, Mitigating Systems, Barrier Integrity1R01Adverse Weather Protection

.1 Seasonal Weather Susceptibilities

a. Inspection Scope

The inspectors performed one adverse weather inspection for readiness of extreme hotweather. The inspectors evaluated the licensee's implementation of OperationsAdministrative Procedure (OAP)-109.1, "Guidelines for Severe Weather," for placing the service water pumphouse building's heating, ventilation and air conditioning (HVAC)cooling coils into service, and operator monitoring of large motor stator temperatures.

The inspectors reviewed the licensee's corrective action program (CAP) database to verify that high temperature weather related problems were being identified at theappropriate level, entered into the CAP, and appropriately resolved.

b. Findings

No findings of significance were identified.

.2 Unexpected Weather Conditions

a. Inspection Scope

The inspectors evaluated the licensee's response to an emergent adverse weathercondition involving the April 26, Tornado Warning declared for the surrounding county with the potential to affect the Virgil C. Summer Nuclear Station. The inspectors monitored the licensee's overall response and implementation of adverse weather procedure OAP-109.1, "Guidelines for Severe Weather."

b. Findings

No findings of significance were identified.

5Enclosure1R04Equipment Alignment

.1 Partial System Walkdowns

a. Inspection Scope

The inspectors conducted three partial equipment alignment walkdowns (listed below) toevaluate the operability of selected redundant trains or backup systems wit h the othertrain or system inoperable or out-of-service (OOS). Correct alignment and operatingconditions were determined from the applicable portions of drawings, system operatingprocedures (SOPs), Final Safety Analysis Report (FSAR), and technical specifications (TS). The inspections included review of outstanding maintenance work requests (MWRs) and related Condition Evaluation Reports (CERs) to verify that the licensee had properly identified and resolved equipment alignment problems that could impact mitigating system availability. Documents reviewed are listed in the Attachment.*"A" emergency diesel generator (EDG) while the "B" EDG was OOS duringscheduled maintenance for intercooler performance troubleshooting;*"A" service water (SW) and service water booster pump (SWBP) while the "B"SW/SWBP was OOS for scheduled maintenance; and,*"A" reactor building (RB) spray pump while the "B" RB spray pump was OOS forscheduled maintenance.

b. Findings

No findings of significance were identified.

.2 Complete System Walkdown

a. Inspection Scope

The inspectors performed a detailed review and walkdown of the SWBPs and relatedpiping system to identify any discrepancies between the current operati ng syst emequipment lineup and the designed lineup. This walkdown included accessible areas outside the containment. In addition, the inspectors reviewed completed surveillanceprocedures, outstanding MWRs, system health reports, and SWBP related CERs toverify that the licensee had properly identified and resolved equipment problems thatcould affect the availability and operability of the system. Documents reviewed arelisted in the Attachment.

b. Findings

No findings of significance were identified.

6Enclosure1R05Fire Protection

a. Inspection Scope

The inspectors reviewed recent CERs, MWRs, and impairments associated with the firesuppression system. The inspectors reviewed surveillance activities to determinewhether they supported the operability and availability of the fire protection system. Theinspectors assessed the material condition of the active and passive fire protection systems and features and observed the control of transient combustibles and ignitionsources. The inspectors conducted routine inspections of the following nine areas (respective fire zones also noted):*"A" and "B" EDG rooms (fire zones DG-1.1/1.2 and DG-2.1/2.2);*"A" and "B" HVAC chilled water pump rooms (fire zones IB-7.2, IB-9, IB-23.1);*"A" and "B" component cooling water pumps/heat exchangers and service waterbooster pump room (fire zones IB-25.1.1, IB-1.2, IB-1.3, and IB-1.5);*Turbine driven emergency feedwater pump (TDEFW) room (fire zone IB-25.2);

  • SW pumphouse (fire zones SWPH-1, SWPH-3, and SWPH-5.1/5.2);
  • Relay room solid state protection system instrumentation and inverter (fire zonesCB-6, CB-10, CB-12);*1DB switchgear rooms and HVAC rooms (fire zones IB-16, IB-17, IB-22.2);
  • "A" and "B" battery and charger rooms (fire zones IB-2, 3, 4, 5, and 6); and,

b. Findings

No findings of significance were identified.

1R06 Flood Protection Measures

a. Inspection Scope

The inspectors reviewed and walked down two areas (i.e., service water pumphouse and auxiliary building AB-374' elevation) regarding internal flood protection features andequipment to determine consistency with design requirements, FSAR, and flood analysis documents. Risk significant structures, systems, and components in theseareas included the service water pumps and related switchgear, residual heat removal (RHR), and RB spray pumps. The inspectors reviewed the licensee's CAP database toverify that internal flood protection problems were being identified at the appropriate level, entered into the CAP, and appropriately resolved.

b. Findings

No findings of significance were identified.

7Enclosure1R07Heat Sink PerformanceAnnual Review

a. Inspection Scope

On April 10, the inspectors observed heat exchanger testing for the "B" EDG intercooler. The inspectors specifically examined, by direct inspection, the performance of the service water system heat exchanger performance test associated with the "B" EDGintercooler heat exchanger. The inspectors also reviewed the test results and subsequent evaluation by the licensee. The review verified that heat exchangerperformance problems were adequately identified and entered into the licensee's CAP and that the frequency of testing was sufficient and established acceptance criteria wereappropriate to detect any potential deficiencies. Trending analysis, test frequency, and future testing plans for the EDG heat exchangers were discussed with the systemengineer responsible for monitoring heat exchanger performance. Documents reviewed are listed in the Attachment.

b. Findings

No findings of significance were identified.

1R11 Licensed Operator Requalification Program

a. Inspection Scope

On June 21, the inspectors observed performance of senior reactor operators andreactor operators on the plant simulator during licensed operator requalification training. The training scenario (LOR-ST-010) involved a dropped rod combined with a continuous rod withdrawal event at 25 percent power, middle-of-life. The inspectors verified that training included risk-significant operator actions and implementation of emergency classification and the emergency plan. The inspectors assessed overall crew performance, communications, oversight of supervision, and the evaluators' critique.

The inspectors verified that any training issues were appropriately captured in the licensee's CAP.

b. Findings

No findings of significance were identified.

1R12 Maintenance Effectiveness

a. Inspection Scope

The inspectors evaluated two equipment issues described in the CERs listed below toverify the licensee's effectiveness of the corresponding preventive or corrective maintenance associated with structures, systems or components (SSCs). The 8Enclosureinspectors reviewed maintenance rule (MR) implementation to verify that componentand equipment failures were identified, entered, and scoped within the MR program. Selected SSCs were reviewed to verify proper categorization and classification in accordance with 10 CFR 50.65. The inspectors examined (a)(1) corrective action plans to determine if the licensee was identifying issues related to the MR at an appropriate threshold and that corrective actions were established and effective. The inspectors' review also evaluated if maintenance preventable functional failures (MPFF) or other MR findings existed that the licensee had not identified. The inspectors reviewed thelicensee's controlling procedures, i.e., engineering services procedure (ES)-514, "Maintenance Rule Implementation," and the Virgil C. Summer "Important ToMaintenance Rule System Function and Performance Criteria Analysis" to verify consistency with the MR requirements.*CER 0-C-06-0537, jumpered thermal overload found in "B" boric acid transferpump breaker; and,*CER 0-C-06-1449, "A" EDG room cooling fan, XFN0075B, tripped.

b. Findings

No findings of significance were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control

a. Inspection Scope

The inspectors reviewed the licensee's assessments of the risk impacts of removingfrom service those components associated with planned and emergent work items. Theinspectors evaluated the five selected work activities listed below for:

(1) theeffectiveness of the risk assessments performed before maintenance activities wereconducted;
(2) the management of risk;
(3) that, upon identification of an unforseensituation, necessary steps were taken to plan and control the resulting emergent work activities; and
(4) that emergent work problems were adequately identified and resolved.

The inspectors evaluated the licensee's work prioritization and risk characterization to determine, as appropriate, whether necessary steps were properly planned, controlled, and executed for the planned and emergent work activities listed below:*Work Week 2006-14, risk assessment for troubleshooting excessive turbineinboard bearing oil leakage from the TDEFW and investigation of "B" EDG reduced intercooler heat exchanger performance;*Work Week 2006-16, risk assessment for "B" EDG intercooler and lube oil coolerthermostatic control valve inspections with "B" EDG and "C" circulating water pump OOS;*Work Week 2006-17, risk assessment for emergent maintenance due tounexpected "B" EDG trip on high crankcase pressure during surveillance testing;*Work Week 2006-18, risk assessment for scheduled switchyard work, "B"SW/SWBP OOS for scheduled maintenance, "B" motor driven emergency 9Enclosurefeedwater pump OOS for scheduled testing, and "B" RB spray pump OOS forscheduled maintenance; and,*Work Week 2006-19, risk assessment for "A" EDG OOS for scheduledmaintenance, "C" SW pump OOS for scheduled motor rewind and traveling screen replacement, and "C" circulating water pump OOS.

b. Findings

No findings of significance were identified.

1R14 Operator Performance During Non-Routine Evolutions and Events

a. Inspection Scope

The inspectors evaluated operator initial response and recovery actions for the listed non-routine event to ensure they were appropriate and in accordance with required alarm response, abnormal and emergency procedures. The inspectors also evaluated performance and equipment problems to ensure that they were entered into the CAP.*May 6, unexpected de-energization of "A" Train alternating current (AC) 7200volt emergency bus 1EA and entry into 8-hour limiting condition for operation action statement of TS 3.8.3.1 (CER 0-C-06-1537).

b. Findings

No findings of significance were identified1R15Operability Evaluations

a. Inspection Scope

The inspectors reviewed five operability evaluations affecting risk significant mitigatingsystems to assess, as appropriate:

(1) the technical adequacy of the evaluations; (2)whether operability was properly justified and the subject component or systemremained available, such that no unrecognized increase in risk occurred;
(3) whether other existing degraded conditions were considered;
(4) where compensatory measures were involved, whether the compensatory measures were in place, would work as intended, and were appropriately controlled; and
(5) the impact on TS limiting conditions for operations and the risk significance in accordance with the Significance Determination Process (SDP). Also, the inspectors verified that the operabilityevaluations were performed in accordance with station administrative procedure (SAP)-999, "Corrective Action Program."*CER 0-C-06-1091, "B" EDG intercooler heat exchanger (XHE0017B-HE3) doesnot meet the design basis limiting condition of ES-560.211, "SW Heat ExchangerPerformance;"

10Enclosure*CER 0-C-06-1135, 7300 process instrumentation and control system circuitbreakers found to be 35 amps versus recommended 30 amps;*CER 0-C-06-1252, hot spots identified during thermography of pressurizerbackup heater power panel;*CER 0-C-06-1500, foreign substance found on post-accident monitoringinstrumentation isolation circuit boards; and,*CER 0-C-06-1974, "B" component cooling water heat exchanger degraded heattransfer capability.

b. Findings

No findings of significance were identified.

1R19 Post-Maintenance Testing

a. Inspection Scope

For the six maintenance activities listed below, the inspectors reviewed the associatedpost-maintenance testing (PMT) procedures and witnessed either the testing and/or reviewed test records to assess whether:

(1) the effect of testing on the plant had been adequately addressed by control room and/or engineering personnel;
(2) testing was adequate for the maintenance performed;
(3) test acceptance criteria were clear and adequately demonstrated operational readiness consistent with design and licensing basis documents;
(4) test instrumentation had current calibrations, range, and accuracy consistent with the application;
(5) tests were performed as written with applicable prerequisites satisfied;
(6) jumpers installed or leads lifted were properly controlled; (7)test equipment was removed following testing; and
(8) equipment was returned to the status required to perform its safety function. The inspectors verified that these activities were performed in accordance with general test procedure (GTP)-214, "Post Maintenance Testing Guideline."*PMT for investigating excessive turbine inboard bearing oil leakage on TDEFWpump (MWR 0603864);*PMT for "B" EDG following inspections of intercooler heat exchanger and repairof associated thermostatic control valve (MWRs 0604121 and 0604130);*PMT for "B" EDG following emergent repair from high crankcase pressure trip(MWR 0605499);*PMT for "B" RB spray pump following scheduled preventive maintenance (MWRs0522148 and 0526652);*PMT for emergent replacement of failed isolator circuit board in the BypassInoperable Status Indication (BISI) system resulting in de-energization of 7200volt safety-related electrical bus (MWR 0605610); and,*PMT for "C" SW pump following motor and traveling screen replacement (MWR0601586).

b. Findings

No findings of significance were identified.

1R22 Surveillance Testing

a. Inspection Scope

The inspectors observed and/or reviewed the five surveillance tests listed below to verifythat TS surveillance requirements were followed and that test acceptance criteria were properly specified to ensure that the equipment could perform its intended safety function. The inspectors verified that proper test conditions were established as specified in the procedures, that no equipment preconditioning activities occurred, and that acceptance criteria had been met.In-Service Tests

  • STP-225.001A, "Diesel Generator B Support System Pump and Valve Test(Group B)" Reactor Coolant System Leakage Tests
  • STP-125.013B, "Diesel Generator B Semiannual Operability Test;"*STP-2005.003, "Charging / Safety Injection Pump and Valve Test" (for "C"pump); and,*STP-105.006, "Safety Injection / Residual Heat Removal Monthly Flow PathVerification Test."

b. Findings

No findings of significance were identified.

1R23 Temporary Plant Modifications

a. Inspection Scope

The inspectors reviewed the following equipment change that was considered atemporary modification. The inspectors evaluated the change documents and the associated 10 CFR 50.59 screening against t he system design basis documentationand FSAR to verify that the change did not adversely affect the safety function of important safety systems. In addition, the inspectors verified that the changes weredeveloped and implemented in accordance with licensee procedure SAP-148, "Temporary Bypass, Jumper, and Lifted Lead Control."

12Enclosure*Bypass Authorization Request (BAR) 06-03, isolation of BISI indication for "C"component cooling water pump status due to failed circuit board (CER 0-C-06-1440).

b. Findings

No findings of significance were identified.Cornerstone: Emergency Preparedness 1EP6Drill Evaluation

a. Inspection Scope

On May 24, 2006, the inspectors reviewed and observed the performance of anEmergency Planning Drill that involved a simulated station loss of offsite and onsiteelectrical AC power followed by a reactor coolant pump seal loss-of-coolant accident and total loss of emergency feedwater makeup (EPP-06-02B, "Emergency Planning Drill," Revision 0). The inspectors assessed emergency procedure usage, emergencyplan classification, notifications and the licensee's identification and entrance of drillproblems into their CAP. This inspection evaluated the adequacy of the licensee's conduct of the dr ill and critique performance. Drill issues were captured by the licenseein CERs 0-C-06-1838 through 0-C-06-1843 and were reviewed by the inspectors.

b. Findings

No findings of significance were identified.4.OTHER ACTIVITIES4OA2Identification and Resolution of Problems

.1 Daily Screening of Corrective Action Items

a. Inspection Scope

As required by Inspection Procedure 71152, "Identification and Resolution of Problems,"and in order to help identify repetitive equipment failures or specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the licensee's corrective action program. This review was accomplished by either attending daily screening meetings that briefly discussed major CERs, or accessing the licensee's computerized corrective action database and reviewing each CER that was initiated.

b. Findings

No findings of significance were identified.

.2 Annual Sample Review

a. Inspection Scope

The inspectors reviewed one issue in detail to evaluate the effectiveness of thelicensee's corrective actions for important safety issues documented in CER 0-C-99-0084, CER 0-C-04-1799 and CER 0-C-06-1449. These CERs were associated with licensee efforts to address spurious tripping of safety-related molded case circuit breakers due to "asymmetrical" in-rush currents. The inspectors assessed whether the licensee adequately addressed all of the applicable causal factors and identified effective corrective actions. Also, the inspectors verified the issue was processed in accordance with SAP-999, "Corrective Action Program."

b. Findings

Introduction.

A Green NRC-identified non-cited violation (NCV) of 10 CFR Part 50,Appendix B, Criterion XVI, "Corrective Action," was identified for the failure to take adequate and timely corrective actions to preclude repetition of a significant condition adverse to quality to prevent the spurious tripping of safety-related molded case circuit breakers due to asymmetrical in-rush current.Description. In July 1992, the NRC issued Information Notice (IN) 92-51,"Misapplication and Inadequate Testing of Molded-Case Circuit Breakers (MCCBs)."

This notice informed addressees about problems that can cause certain MCCBs to trip when starting their safety-related motor loads due to in-rush transient (asymmetrical)currents. This IN was later supplemented in April 1994 with more specific guidance concerning recommended industry test methods. The inspectors noted that the licensee's evaluation of IN 92-51 and its supplement, concluded that the issue did not affect Virgil C. Summer Nuclear Station and that no actions were necessary. In February of 1999, during investigation and evaluation of a spurious trip of the "B"Control Room (CR) Emergency Filtering System Fan (XFN0030B-M), the licensee documented in CER 0-C-99-0084 that several

(36) safety-related motors supplied by molded case circuit breakers were "susceptible," (i.e., calculated minimum trip to maximum locked rotor current ratio of 2.0 or less), to spurious tripping caused by asymmetrical in-rush currents. Of those 36 susceptible motor loads, nine of them were subsequently evaluated as "most susceptible," (i.e., calculated minimum trip to maximum locked rotor current ratio of 1.38 or less), to spurious tripping caused by asymmetrical in-rush currents. The ratio of 1.38 or less was arbitrarily chosen based upon the fact that the "B" CR Emergency Filtering System Fan motor had experienced the spurious trip with a ratio of 1.38. Several options were discussed including replacing the magnetic-only breakers with thermal-magnetic breakers that have a higherinstantaneous trip value. After discussions with the Electrical Shop Supervision, the most cost effective solution was determined to be elimination of the lower half of the present breaker setting acceptance criteria. The setpoint tolerance was +/- 15%;

however, for these selected breakers, the new tolerance was changed to -0% to +15%

to correct the spurious tripping condition/susceptibility.

14EnclosureThough all four of the EDG room ventilation supply fans were identified during thatevaluation as being "susceptible," no corrective actions were taken to preclude any spurious trips due to asymmetrical in-rush currents at that time due to their calculated minimum trip to maximum locked rotor current ratio being 1.47. In June, 2004, the breaker for "A" EDG room ventilation supply fan (XFN0075A), was found tripped.

Further investigation attributed the cause to asymmetrical in-rush current. As a result of this event, all four EDG room ventilation supply fans breaker setting acceptance criteria was adjusted to change the as-left tolerances from +/- 15% to -0% to +15%. On April 28, 2006, the breaker for "A" EDG room ventilation supply fan "B" (XFN0075B), was found tripped. Subsequent investigation attributed the cause to asymmetrical in-rush current. Post trip calibration results revealed that the "as-found" trip setting of the breaker was within the previously modified tolerance range of -0% to +15%. The inspectors determined that the licensee's corrective actions to date to address the industry known issue with spurious tripping of magnetic only MCCBs due to asymmetrical in-rush currents have been ineffective. The licensee has entered this issue in its CAP for resolution.Analysis. This finding is more than minor because it affected the mitigati ng systemscornerstone attribute of equipment performance (i.e., Emergency Diesel Generator) and adversely affected the cornerstone objective of ensuring the availability, reliability andcapability of systems that respond to initiating events. On an emergency start of theEDGs, both ventilation cooling fans in each EDG room are designed to auto-start to provide room cooling. If either fan experienced a spurious trip due to the in-rush current phenomenon, the operators would be immediately alerted to the condition via fan tripalarms in the control room. The inspectors reviewed alarm response procedures and determined that adequate guidance and time existed for the operators to reset the fanmotor breakers located in the EDG rooms and restart the fans prior to exceeding design basis room temperatures that might challenge the capability of the EDGs to performtheir designed safety function. Thus, a SDP Phase 1 analysis characterized the finding as being of very low safety significance because it did not result in a loss of safety function of one or more trains of the EDGs and was not potentially risk-significant due to possible external events. The direct cause of this finding involved the cross-cutting area of Problem Identification and Resolution, in that, the identified corrective actions were not adequate to resolve the fans tripping due to asymmetrical in-rush current.Enforcement. 10 CFR 50, Appendix B, Criterion XVI, "Corrective Action," requires, inpart, that measures be established to assure that conditions adverse to quality are promptly identified and corrected. In addition, for significant conditions adverse to quality, measures shall assure that the cause of the condition is determined and corrective actions be taken to preclude repetition. Contrary to this, the licensee failed to take adequate corrective actions and prevent repetition following the failure of CR Emergency Filtering System Fan "B" (XFN0030B-M) in February of 1999, CR Emergency Filtering System Fan "A" (XFN0030A-M) in August of 2000, and "A" EDG room ventilation supply fan "A" (XFN0075A) on June 9, 2004. As a result, a repetitive condition was discovered on April 28, 2006, with the "A" EDG room ventilation supply fan "B" (XFN0075B) tripping due to the same conditions identified for the "A" EDG fan in 2004. Because the finding is of very low safety significance and has been entered into 15Enclosurethe licensee's CAP as CER 0-C-06-1449, this violation is being treated as a NCV,consistent with Section VI.A of the NRC Enforcement Policy: NCV 05000395/2006003-01, Failure to Take Adequate and Timely Corrective Actions to Preclude Repetitive Spurious Tripping of Safety Related Molded Case Circuit Breakers.

.3 Semi-Annual Trend Review

a. Inspection Scope

As required by Inspection Procedure 71152, "Identification and Resolution of Problems,"the inspectors performed a review of the licensee's corrective action program and associated documents to identify trends that could indicate the existence of a moresignificant safety issue. The review was focused on repetitive equipment issues, but also considered trends in human performance errors, the results of daily inspector corrective action item screening discussed in Section 4OA2.1 above, licensee trending efforts, and licensee human performance results. The review nominally considered the six-month period of January 2006 through June 2006. Documents reviewed included licensee monthly and quarterly corrective action trend reports, engineering systemhealth reports, department self-assessment activities, and quality assurance audit reports.

b. Findings

No findings of significance were identified. The inspectors evaluated the licensee'strending methodology and observed that the licensee had performed a detailed review.

The licensee routinely reviewed the cause codes, involved organizations, key words, and system links to identify potential trends in their corrective action program data. Theinspectors compared the licensee's reviews with the results of the inspectors' daily screening and did not identify any discrepancies or potential trends in the data which thelicensee had failed to identify.4OA5Other

.1 (Closed)

Unresolved Item (URI) 05000395/2004009-02: Tornado Missile Vulnerabilitiesof Outdoor ComponentsAs described in URI 05000395/2004009-02, NRC inspectors identified several outdoorcomponents that were important for safe shutdown not protected from potential tornadomissile damage. The licensee had not evaluated the tornado missile vulnerability ofthose outdoor components as apparently described in the FSAR. This URI was left open for further NRC review of the related licensing basis requirements. Upon further review, the NRC determined that FSAR Section 3.5.1.4, describes thelicensing basis used at the station for evaluating specific missile types generated by the design tornado. In addition, based on the equation described in the FSAR, the NRC determined that the licensee was required to consider the tornado missile vulnerability ofboth indoor and outdoor safe shutdown components. (The evaluation performed by the 16Enclosurelicensee prior to the inspection only considered the tornado missile vulnerability ofindoor safe shutdown components.) In addition, per the FSAR, this cumulative probability was to be less than 1 E-7 per year.The licensee's failure to include the risk of tornado missile damage to unprotectedoutdoor components represented a finding and a violation of 10 CFR 50, Appendix B,Criterion III, Design Control. The inspector reviewed the licensee's corrective actions as documented in CER 0-C-04-3637 and CER 0-C-04-3778. On May 3, 2006, the inspector made a site visit and walked down the unprotected outdoor components. In addition, the inspector reviewed the licensee's preliminary calculation for the cumulative missile strike probability for all indoor and outdoor components and discussed the issuewith licensee engineers. The inspector found that this revised cumulative missile strike probability, including the indoor and outdoor components, was substantially below theFSAR threshold of 1 E-7 per year. Because the consideration of outdoor components did not cause the overall missile strike probability for safe shutdown components toexceed the value specified in the FSAR, this finding was of minor significance. URI 05000395/2004009-02 is closed.

.2 (Closed) Licensee Event Report (LER) 50-395/2005-002-01: Mode 3 Entry with anInoperable Emergency Feedwater Pump, Supplement 1The inspectors reviewed the subject LER and CER 0-C-05-2300 to verify the accuracyof the LER and the appropriateness of the corrective actions.

The supplement to this LER provide revision to the corrective actions following additional licensee management review and revision to the root cause report. No new findings of significance were identified. The regulatory significance of this issue was previously discussed in NRC Integrated Inspection Report 05000395/2005004.

.3 (Closed) Temporary Instruction (TI) 2515/165: Operational Readiness of Offsite Power(OSP) and Impact on Plant RiskThe inspectors reviewed licensee procedures and controls, and interviewed operationsand maintenance personnel, to verify these documents contained specific attributes

delineated in the TI to ensure the operational readiness of offsite power systems inaccordance with plant Technical Specifications; the design requirements provided in 10 CFR 50, Appendix A, General Design Criterion 17, "Electric Power Systems," and the impact of maintenance on plant risk in accordance with 10 CFR 50.65(a)(4),

"Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." Documents reviewed are listed in the Attachment. Appropriate documentation of the results of this inspection was provided to NRC headquarters staff for furtheranalysis, as required by the TI. This completes the Region II inspection TI requirements for the Virgil C. Summer Nuclear Station.

17Enclosure4OA6Meetings, Including ExitExit Meeting SummaryThe inspectors presented the inspection results to Mr. Thomas Gatlin and othermembers of the licensee staff on July 11, 2006. The inspectors confirmed that proprietary information was not provided or examined during the inspection.4OA7Licensee-Identified ViolationsThe following finding of very low safety significance (Green) was identified by thelicensee and is a violation of NRC requirements which met the criteria of Section VI ofthe NRC Enforcement Policy, NUREG-1800, for being dispositioned as an NCV.*TS 6.8.1.a requires, in part, that written procedures be established, implementedand maintained covering activities listed in Regulatory Guide 1.33, Rev. 2, Appendix A, February 1978, which includes procedures for conducting calibrations of equipment required by TS (Section 8.b). Surveillance TestProcedure STP-360.031, "Control Room Supply Air Atmospheric Radiation Monitor RMA0001 Calibration," Rev. 8, was written to accomplish TS required calibrations of control room isolation radiation monitor RM-A1. Step 7.6.4 of theprocedure directed "B" Train CR ventilati on system to be placed in "emergency"mode while testing of the "A" Train CR ventilation system. Contrary to therequirements of STP-360.031, on May 17, 2006, the Control Building operatorsecured the "B" Train CR ventilation system from emergency mode during "A"Train ventilation testing. The system was restored nineteen minutes later afterthe Shift Supervisor became aware that the system had been secured from theemergency mode. At the time of the event, RM-A1 was already considered inoperable and the licensee was maintaining the "B" Train CR ventilation systemin emergency mode as part of the requirements of Action Statement 29 of TS 3.3.3.1. The licensee determined that during the nineteen minutes that the "B"CR ventilation was not in service, they were in violation of the requirements of TS 3.3.3.1. This finding is of very low safety significance because of the short duration that the system was not in its required configuration. This issue wasentered into the licensee's CAP as CER 0-C-06-1648.ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

J. Archie, Vice President, Nuclear Operations
F. Bacon, Manager, Chemistry Services
M. Browne, Manager, Quality Systems
A. Cribb, Acting Supervisor, Nuclear Licensing
M. Findlay, Manager, Nuclear Protection Services
M. Fowlkes, General Manager, Engineering Services
D. Gatlin, General Manager, Nuclear Plant Operations
D. Lavigne, General Manager, Organizational Effectiveness Training
G. Lippard, Manager, Operations
G. Moffit, Manager, Nuclear Operations Training
P. Mothena, Acting Manager, Health Physics and Safety Services
J. Nesbitt, Manager, Materials and Procurement
K. Nettles, General Manager, Nuclear Support Services
R. Stokes, Manager, Design Engineering
W. Stuart, Manager, Plant Support Engineering
R. Sweet, Manager, Nuclear Licensing
A. Torres, Manager, Planning / Scheduling and Project Management
S. Zarandi, Manager, Maintenance Services

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

NoneOpened and

Closed

05000395/FIN-2006003-01NCVFailure to Take Adequate and Timely Corrective Actions toPreclude Repetitive Spurious Tripping of Safety Related
Molded Case Circuit Breakers (Section 4OA2.2)

Closed

05000395/FIN-2006003-01NCVFailure to Take Adequate and Timely Corrective Actions toPreclude Repetitive Spurious Tripping of Safety Related
Molded Case Circuit Breakers (Section 4OA2.2)

Discussed

None

A-2Attachment

LIST OF DOCUMENTS REVIEWED

Section 1R04: Equipment AlignmentSOP-211, "Emergency Feedwater System"SOP-306, "Emergency Diesel Generator"

SOP-307, "Diesel Generator Fuel Oil System"
SOP-117, "Service Water System" Drawing D-302-221, Service Water Cooling Drawing D-302-222, Service Water Cooling Service Water System Design Basis Document

Section 1R07: Heat Sink PerformanceProceduresES-560.211, Service Water Heat Exchanger Performance, Rev. 8PTP-213.002, Service Water System Heat Exchanger Data Collection, Rev. 1Section 1R07A:

Procedures

and Completed Procedures (Testing Data)PMTS

0601936, Service Water HX Performance For 110% Run (Intercooler HX), 03/29/2006Work Orders Associated With "B" EDG Intercooler
HXES-560.211, Service Water System Heat Exchanger Performance, Rev. 8PTP-213.002, Service Water System Heat Exchanger Data Collection, Rev. 1Diesel Generator HX Performance Testing Trends Condition Evaluation Reports0-C-06-1091, Intercooler Heat Exchanger (XHE0017B-HE3) does not meet the Design BasisLimiting Conditions of
ES-560.211 due to apparent fouling on the shell side.
A-3Attachment

LIST OF ACRONYMS

ABAuxiliary BuildingACAlternating Current

BARBypass Authorization Request

BISIBypass Inoperable Status Indication

CAPCorrective Action Program

CERCondition Evaluation Report

CFRCode of Federal Regulations

CRControl Room

ECREngineering Change Request

EDGEmergency Diesel Generator

EOPEmergency Operating Procedure

EPPEmergency Plan Procedure

ESEngineering Services Procedure

FSARFinal Safety Analysis Report

GTPGeneral Test Procedure

HVACHeating, Ventilation, and Air Conditioning

IBIntermediate Building

IMCInspection Manual Chapter

INInformation Notice

LERLicensee Event Report

MCCBMolded Case Circuit Breaker

MDEFWMotor Driven Emergency Feedwater

MPFFMaintenance Preventable Functional Failures

MRMaintenance Rule

MWRMaintenance Work Request

NCVNon-Cited Violation

NRCNuclear Regulatory Commission

OAPOperations Administrative Procedure

OOSOut-of-Service

PMTPost-Maintenance Testing

RBReactor Building

RHRResidual Heat Removal

ROPReactor Oversight Process

RTPRated Thermal Power

SAPStation Administrative Procedure

SDPSignificance Determination Process

SOPSystem Operating Procedure

SSCStructures, Systems, or Components

STPSurveillance Test Procedure

SWService Water

SWBPService Water Booster Pump

SWPHService Water Pumphouse

TDEFWTurbine Driven Emergency Feedwater

TSTechnical Specification

URIU nresolved Item