August 5, 2021

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000395/2021402

Dear Mr. Stoddard:

On July 15, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station, Unit 1 and discussed the results of this inspection with Mr.

George Lippard and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000395 License No. NPF-12

Enclosure:

As stated

Inspection Report

Docket Number:

05000395

License Number:

NPF-12

Report Number:

05000395/2021402

Enterprise Identifier: I-2021-402-0017

Licensee:

Dominion Energy South Carolina (DESC)

Facility:

Virgil C. Summer Nuclear Station, Unit 1

Location:

Jenkinsville, SC 29065

Inspection Dates:

July 12, 2021 to July 15, 2021

Inspectors:

A. Richardson, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Virgil C. Summer Nuclear Station,

Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated [date].

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 4 Requirements (02.09 a-b, 02.11 a-b)
  • Tier III: 2 Requirements (02.15 a, c)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 6 Requirements (02.05 a - d, 02.06 b, 02.07 a)
  • Tier III: 5 Requirements (02.11 a, 02-12 a, 02.13 a-c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 15, 2021, the inspectors presented the security baseline inspection results to Mr George Lippard and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

CR-21-00500

Contact vendor to evaluate potential upgrades to hardwire

equipment

71130.04

Corrective Action

Documents

CR-21-0090

Security weapon did not meet criteria described in procedure

SPP-240 "Firearms Cleaning, Maintenance and Repair"

71130.04

Procedures

SMP-001

Metal Detection Equipment

Revision 3

71130.04

Procedures

SMP-003

X Ray Equipment

Revision 6

71130.04

Procedures

SMP-006

Microwave Intrusion Detection Equipment

Revision 4

71130.04

Procedures

SMP-009

Closed Circuit Television Equipment

Revision 4

71130.04

Procedures

SMP-011

Perifield-M Perimeter Detection Equipment

Revision 1

71130.04

Procedures

SMP-012

Protected Area Vehicle Barrier System

Revision 1

71130.04

Procedures

SMP-013

Handheld Metal Detection Equipment

Revision 1

71130.04

Procedures

SMP-014

Trace Explosive Detection Equipment

Revision 0

71130.04

Procedures

SMP-015

N-Smart Access Control Systems

Revision 0

71130.04

Procedures

SMP-016

Owner Controlled Area Vehicle Barrier System

Revision 0

71130.04

Procedures

SMP-023

Cargo X-Ray Equipment

Revision 0

71130.04

Procedures

SPP-222

Operational Testing of Security System Components

Revision 3

71130.04

Procedures

SPP-223

Security Surveillance System Operational Testing

Revision 7

71130.04

Procedures

SPP-224

Operational Testing Of Security Access Control And Intrusion

Detection Systems

Revision 3

71130.04

Procedures

SPP-225

Perimeter Intrusion Detection System Operational Testing

Revision 6

71130.04

Procedures

SPP-226

Operational Testing Of Security Communication Systems

Revision 4

71130.04

Procedures

SPP-227

Special Security Equipment Operational Testing

Revision 0

71130.04

Procedures

SPP-228

Search Equipment Operational Test Procedure

Revision 6

71130.04

Procedures

SPP-229

Operational Testing Of Duress Alarm Devices

Revision 1

71130.04

Procedures

SPP-230

Security Lighting System Inspection

Revision 0

71130.04

Procedures

SPP-231

Security Barrier And Lock System Operational Test or

Inspection

Revision 4

71130.04

Procedures

SPP-238

Security Equipment Accountability

Revision 1

71130.04

Procedures

SPP-239

Firearms Control And Accountability

Revision 2

71130.04

Procedures

SPP-240

Firearms Cleaning, Maintenance and Repair

Revision 3

71130.04

Procedures

SPP-241

OCA Early Warning System Operational Testing

Revision 0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.07

Procedures

SPP-300

Security Training and Qualification Program: Training

Revision 9

71130.07

Procedures

SPP-301

Security Training and Qualification Program: Qualification

Revision 9