Integrated Inspection Report 05000395/2023001
ML23131A351
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/12/2023
From: David Dumbacher
Division Reactor Projects II
To: Stoddard D
Dominion Energy Co
References
IR 2023001
Download: ML23131A351 (10)


See also: IR 05000395/2023001

Text

Daniel G. Stoddard

Senior Vice President and Chief Nuclear Officer

Dominion Energy

Innsbrook Technical Center

5000 Dominion Blvd., Floor: IN-2SW

Glenn Allen, VA 23060

SUBJECT:

VIRGIL C. SUMMER - INTEGRATED INSPECTION REPORT

05000395/2023001

Dear Daniel G. Stoddard:

On March 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at Virgil C. Summer. On May 9, 2023, the NRC inspectors discussed the results of this

inspection with Mr. Robert Justice and other members of your staff. The results of this

inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

David E. Dumbacher, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Docket No. 05000395

License No. NPF-12

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

May 12, 2023

Signed by Dumbacher, David

on 05/12/23

ML23131A351

X SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

RII/DRP

RII/DRP

RII/DRP

RII/ DRP

RII/ DRP

RII/ DRP

NAME

S. Sandal

A. Hutto

J. Hamman S. Janicki

M. Read

N. Childs

DATE

05/10/23

05/10/23

05/10/23

05/10/23

05/10/23

05/11/23

OFFICE

RII/DRP

NAME

D. Dumbacher

DATE

05/12/23

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000395

License Number:

NPF-12

Report Number:

05000395/2023001

Enterprise Identifier:

I-2023-001-0048

Licensee:

Dominion Energy

Facility:

Virgil C. Summer

Location:

Jenkinsville, SC

Inspection Dates:

January 01, 2023 to March 31, 2023

Inspectors:

D. Bacon, Senior Operations Engineer

P. Gresh, Emergency Preparedness Inspector

J. Hamman, Senior Project Engineer

A. Hutto, Senior Project Engineer

S. Janicki, Acting Senior Resident Inspector

M. Norris, Senior Emergency Preparedness Specialist

M. Read, Senior Resident Inspector

S. Sandal, Senior Reactor Analyst

J. Walker, Senior Emergency Preparedness Inspector

Approved By:

David E. Dumbacher, Chief

Reactor Projects Branch 3

Division of Reactor Projects

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Virgil C. Summer, in accordance with the

Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for

overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

3

PLANT STATUS

The unit operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed activities described in IMC 2515,

Appendix D, Plant Status, observed risk-significant activities, and completed on-site portions of

IPs. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel to assess licensee performance and compliance with Commission rules

and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated the adequacy of the overall preparations to protect risk-

significant systems from impending severe weather on January 5, 2023 (Tornado

Watch & Thunderstorm Warning).

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1)

Residual heat removal system, on January 4, 2023

(2)

Emergency feedwater system, on January 17, 2023

(3)

Electro-hydraulic control system following oil addition, on February 9, 2023

(4)

Auxiliary building ventilation system, on February 24, 2023

(5)

Charging and high head safety injection system B, on March 21, 2023

(6)

Emergency diesel generator A protected train walkdown during emergent

maintenance for emergency diesel generator B, on March 30, 2023

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated system configurations during a complete walkdown of the

emergency diesel generator 'B' system during an extended maintenance outage on

January 23, 2023.

4

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

(1)

Service water booster pump air handler rooms, on January 17, 2023

(2)

Intermediate building elevation, 412 feet on January 17, 2023

(3)

Diesel generator building, on January 23, 2023

(4)

Spent fuel pool area, on February 13, 2023

(5)

Intermediate building chiller rooms, on February 27, 2023

(6)

Service water pump house, on March 1, 2023

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated the onsite fire brigade training and performance during an

announced fire drill on March 22, 2023.

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1)

Intermediate building from the service water booster pumps, on January 9, 2023

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1)

'A' emergency diesel generator heat exchangers, on January 23, 2023

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

The inspectors observed and evaluated licensed operator performance in the control room

during:

(1)

Main turbine valve testing on January 4, 2023, and solid-state protection system time

response testing on March 1, 2023

5

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following

structures, systems, and components (SSCs) remain capable of performing their intended

function:

(1)

Reactor building purge exhaust radiation monitor (RM-A14) failures, review

completed on March 31, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1)

Elevated risk during a tornado watch while performing a unit down power for turbine

driven emergency feedwater testing, on January 5, 2023

(2)

Elevated risk during planned turbine driven emergency feedwater pump maintenance,

on January 17, 2023

(3)

Yellow risk during planned solid state protection system testing, on January 20, 2023

(4)

Elevated risk during planned maintenance for emergency diesel generator B, on

January 27, 2023

(5)

Elevated risk due to planned main control board testing, on March 27, 2023

(6)

Elevated risk during corrective maintenance for Parr Hydro 13.8 kW alternate AC

power line, on March 29, 2023

(7)

Elevated risk during emergent emergency diesel generator maintenance, on March

30, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1)

CR 1217542, Diesel fuel oil sample results above limits, on March 13, 2023

(2)

CR 1221620, XEG0001B-E (EDG 'B') fuel oil pipe fitting crack, on March 23, 2023

(3)

CR 1221899, XEG0001B-E (EDG B) fuel oil accumulator low level due to check

valve leak-by, on March 31, 2023

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

6

(1)

ECR-71514, 'A' emergency diesel generator speed switch replacement, on

March 1, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system

operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1)

STP-220.002, turbine driven emergency feedwater pump testing following scheduled

maintenance, on January 17, 2023

(2)

STP-123.003A, service water valve testing following check valve maintenance, on

January 25, 2023

(3)

STP 205.003, charging and safety injection valve stroke timing, on March 21, 2023

Surveillance Testing (IP Section 03.01) (3 Samples)

(1)

STP-345.043, round trip delay time response testing for the solid-state protection

system, on March 1, 2023

(2)

Instrument air surveillance to place an additional air compressor in service to support

maintenance, on March 8, 2023

(3)

STP 302.041, uncompensated power range nuclear instrument detector current

testing, on March 16, 2023

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1)

Flex 480/V generator, on February 10, 2023

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1)

The inspectors evaluated the biennial emergency plan exercise during the week of

March 6, 2023. The exercise scenario began with concurrent simulated loose parts

and high radiation monitor alarms. An Alert was declared when Chemistry provided a

reactor coolant system sample above the dose equivalent iodine threshold. A design

basis loss of coolant accident concurrent with reactor building radiation alarms

resulted in the declaration of a Site Area Emergency based on loss or potential loss

of two fission product barriers. Afterward, containment pressure increased above

threshold and the alpha service water booster pump trips. With the bravo reactor

building spray pump out of service, there was less than one full train of containment

depressurization equipment, therefore meeting the criteria to satisfy simulated

conditions for a General Emergency. This allowed the Offsite Response

Organizations to demonstrate their ability to implement emergency actions.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

7

(1)

The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and

Emergency Plan Implementing Procedure changes during the week of

March 6, 2023. This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1)

A training drill involving the loss of one emergency electrical bus, a generator tube

rupture and fault, and a of radioactive materials on January 10, 2023.

71114.08 - Exercise Evaluation - Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1)

The inspectors reviewed and evaluated in-office, the proposed scenario for the

biennial emergency plan exercise at least 30 days prior to the day of the exercise.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1)

January 1, 2022, through December 31, 2022

EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13)

(1 Sample)

(1)

January 1, 2022, through December 31, 2022

EP03: Alert and Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)

(1)

January 1, 2022, through December 31, 2022

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On May 9, 2023, the inspectors presented the integrated inspection results to Mr. Robert

Justice and other members of the licensee staff.

On March 9, 2023, the inspectors presented the Emergency Preparedness Exercise

inspection results to Mr. Don Shue and other members of the licensee staff.

8

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

FP1SWPH-425

Service Water Pump House

0

71111.05

Drawings

FP1SWPH-436

Service Water Pump House

0

71111.15

Work Orders

WO 88201689019

EDG B Fuel oil pipe fitting crack

STP-302.041

NIS Power Range N44 Operational Test

14

71111.24

Procedures

STP-345.043

RTD Time Response Testing

9