IR 05000395/2021403
| ML21189A228 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 07/08/2021 |
| From: | Scott Shaeffer NRC/RGN-II/DRS/EB2 |
| To: | Stoddard D Dominion Energy Co |
| References | |
| IR 2021403 | |
| Download: ML21189A228 (6) | |
Text
July 08, 2021
SUBJECT:
V.C. SUMMER NUCLEAR STATION UNIT 1 - TARGET SET INSPECTION REPORT 05000395/2021403
Dear Mr. Stoddard:
On June 2, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at V.C. Summer Nuclear Station Unit 1 and discussed the results of this inspection with Mr.
George Lippard, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket No. 05000395 License No. NPF-12
Enclosure:
Inspection Report
Docket Number:
05000395
License Number:
Report Number:
Enterprise Identifier: I-2021-403-0008
Licensee:
Dominion Energy
Facility:
V.C. Summer Nuclear Station Unit 1
Location:
Jenkinsville, SC
Inspection Dates:
June 01, 2021 to June 02, 2021
Inspectors:
E. Coffman, Reactor Inspector
Approved By:
Scott M. Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Target Set Inspection at V.C. Summer Nuclear Station Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the Security Target Set Program. The following elements were
===evaluated:
Review of Power Reactor Target Sets===
- (1) All requirements: 02.02 (a-f), 02.03, 02.04 (a-b), and
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 2, 2021, the inspectors presented the Target Set Inspection results to Mr.
George Lippard, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-18-01982
5/15/2018
CR-18-02461
6/14/2018
CR-18-02524
6/20/2018
CR-18-03105
8/1/2018
CR-18-2415
6/12/2018
CR-19-02615
7/22/2019
CR-19-03344
9/19/2019
CR-19-04373
2/10/2019
CR-20-00543
2/20/2020
CR-20-03753
11/18/2020
CR-20-03755
11/18/2020
CR-21-00351
2/10/2021
CR-21-01034
4/20/2021
Procedures
Rev. 19C
Rev. 0C
SPP-0124
Rev. 0C
VCS-EPP-0027
Rev. 2B