IR 05000395/2021403

From kanterella
Jump to navigation Jump to search
Target Set Inspection Report 05000395/2021403
ML21189A228
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/08/2021
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Stoddard D
Dominion Energy Co
References
IR 2021403
Download: ML21189A228 (6)


Text

July 08, 2021

SUBJECT:

V.C. SUMMER NUCLEAR STATION UNIT 1 - TARGET SET INSPECTION REPORT 05000395/2021403

Dear Mr. Stoddard:

On June 2, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at V.C. Summer Nuclear Station Unit 1 and discussed the results of this inspection with Mr.

George Lippard, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket No. 05000395 License No. NPF-12

Enclosure:

Inspection Report

Docket Number:

05000395

License Number:

NPF-12

Report Number:

05000395/2021403

Enterprise Identifier: I-2021-403-0008

Licensee:

Dominion Energy

Facility:

V.C. Summer Nuclear Station Unit 1

Location:

Jenkinsville, SC

Inspection Dates:

June 01, 2021 to June 02, 2021

Inspectors:

E. Coffman, Reactor Inspector

Approved By:

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Target Set Inspection at V.C. Summer Nuclear Station Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were

===evaluated:

Review of Power Reactor Target Sets===

(1) All requirements: 02.02 (a-f), 02.03, 02.04 (a-b), and

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 2, 2021, the inspectors presented the Target Set Inspection results to Mr.

George Lippard, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.14

Corrective Action

Documents

CR-18-01982

5/15/2018

CR-18-02461

6/14/2018

CR-18-02524

6/20/2018

CR-18-03105

8/1/2018

CR-18-2415

6/12/2018

CR-19-02615

7/22/2019

CR-19-03344

9/19/2019

CR-19-04373

2/10/2019

CR-20-00543

2/20/2020

CR-20-03753

11/18/2020

CR-20-03755

11/18/2020

CR-21-00351

2/10/2021

CR-21-01034

4/20/2021

Procedures

SAP-0999

Rev. 19C

SAP-1308

Rev. 0C

SPP-0124

Rev. 0C

VCS-EPP-0027

Rev. 2B