IR 05000395/2021401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000395/2021401
ML21106A143
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/16/2021
From: Otis Smith
Division of Reactor Safety II
To: Stoddard D
Dominion Energy Co
References
IR 2021401
Download: ML21106A143 (7)


Text

April 16, 2021

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000395/2021401

Dear Mr. Stoddard:

On March 5, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Otis Smith, Jr, Sr., Acting Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000395 License No. NPF-12

Enclosure:

As stated

Inspection Report

Docket Number:

05000395

License Number:

NPF-12

Report Number:

05000395/2021401

Enterprise Identifier: I-2021-401-0026

Licensee:

Dominion Energy South Carolina (DESC)

Facility:

Virgil C. Summer Nuclear Station

Location:

Jenkinsville, SC

Inspection Dates:

February 28 - March 4, 2021 (Onsite)

Inspectors:

J. Justice, Senior Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Otis Smith, JR, Sr. Physical Security Inspector

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Virgil C. Summer Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following inspection elements:

(1) Tier I: All Requirements Tier II: No Requirements Tier III: 1 Requirement (02.10 (a))

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

(1) Tier I: All Requirements

Tier II: No Requirements Tier III: No Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision 18 to 19 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)

(1) February 2020 through February

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 4, 2021, the inspectors presented the security baseline inspection results to Daniel Stoddard and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

SCP-113

TWO PERSON RULE

Revision 1

71130.02

Procedures

SCP-114

SECURITY FORCE RESPONSIBILITIES DURING

EMERGENCIES

Revision 17

71130.02

Procedures

SPP-201

PERSONNEL ACCESS

Revision 9

71130.02

Procedures

SPP-202

PROTECTED AREA

VEHICLE ACCESS REQUIREMENTS

Revision 13

71130.02

Procedures

SPP-203

PERSONNEL, VEHICLE AND MATERIALS SEARCH

REQUIREMENTS

Revision 12

71130.02

Procedures

SPP-210

SECURITY LOCK AND KEY CONTROL

Revision 10

71130.02

Procedures

SPP-213

SECURITY IDENTIFICATION BADGE FABRICATION

AND CONTROL

Revision 23

71130.02

Procedures

SPP-214

SECURITY IDENTIFICATION BADGE ISSUANCE

Revision 15

71130.02

Procedures

SPP-236

OPERATION OF THE VEHICLE BARRIER SYSTEM

CHECKPOINT

Revision 2

71130.02

Procedures

SPP-236

OWNER CONTROLLED AREA

PERSONNEL ACCESS

Revision 2

71130.05

Procedures

SPP-301

SECURITY TRAINING AND QUALIFICATION PROGRAM:

QUALIFICATION

Revision 9

71130.05

Procedures

SPP-302

SECURITY DRILL AND EXERCISE PROGRAM

Revision 2

71130.05

Procedures

SY-AA-TR-203

Composite Adversary Team

Revision 3

71130.09

Procedures

SY-AA-TR-126

Regulatory Assessment Performance Indicator Data

Reporting

Revision 1