Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000395/ 2022012
ML22314A183
Person / Time
Site: Summer 
Issue date: 11/14/2022
From: James Baptist
NRC/RGN-II/DRS/EB1
To: Stoddard D
Dominion Energy Co
References
IR 2022012
Download: ML22314A183 (1)


Text

Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Innsbrook Technical Center 5000 Dominion Blvd., Floor: IN-2SW Glen Allen, VA 23060

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION - TRIENNIAL INSPECTION OF EVALUATION OF CHANGES, TESTS AND EXPERIMENTS BASELINE INSPECTION REPORT 05000395/2022012

Dear Mr. Stoddard:

On October 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station and discussed the results of this inspection with Mr. George Lippard and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 05000395 License No. NPF-12

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV November 14, 2022 Signed by Baptist, James on 11/14/22

ML22314A183 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DRS RII/DRS RII/DRS RII/DRS NAME J. Parent B. Bowker B. Bishop J. Baptist DATE 11/10/2022 11/10/2022 11/10/2022 11/14/2022

Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:

05000395 License Number:

NPF-12 Report Number:

05000395/2022012 Enterprise Identifier:

I-2022-012-0012 Licensee:

Dominion Energy Facility:

Virgil C. Summer Nuclear Station Location:

Jenkinsville, SC Inspection Dates:

October 24, 2022 to October 27, 2022 Inspectors:

B. Bishop, Senior Project Engineer B. Bowker, Reactor Inspector P. Carman, Senior Reactor Inspector D. Parent, Project Engineer Approved By:

James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial inspection of evaluation of changes, tests and experiments baseline inspection at Virgil C. Summer Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY 71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01) (20 Samples)

The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from October 1, 2019 until July 8, 2022.

(1) 50.59 Evaluation: ECR 50585W, Replacement of Chiller B, 8/15/2018 (2) 50.59 Evaluation: ECR 50799L, Reactor Coolant Pump Seal Replacement, 11/11/21 (3) 50.59 Evaluation: ECR 72587, Penetration Area Exhaust Damper Control from Automatic to Manual, Rev. 7 (4) 50.59 Evaluation: ECR 72616, FSAR Chapter 15 Analyses with Updated RCS Initial Condition Uncertainties, Rev. 0 (5) 50.59 Screening: ECR 50544, XIT5936 and XIT5937 Replacement, Rev. 7 (6) 50.59 Screening: ECR 50884H, Open Phase Condition (OPC) Strategy for the GDC-17 Offsite Power Sources, 2/20/2020 (7) 50.59 Screening: ECR 50912A, Modification to Platform SWP-1, 11/26/2018 (8) 50.59 Screening: ECR 50933G, CC HX SW Return Throttle Valve Installation - B Train, 12/18/2019 (9) 50.59 Screening: ECR 50940, Spent Fuel Cooling Pump Alternate Power, 10/26/2020 (10) 50.59 Screening: ECR 50941A, B Core Subcooling Margin Monitor Replacement, Rev. 1 (11) 50.59 Screening: ECR 72124, Boric Acid Tank Level Transmitter Span Change, Rev.

7 (12) 50.59 Screening: ECR 72321, Development of IFS07100A/B Uncertainty Calculations, Rev. 16 (13) 50.59 Screening: ECR 72546, Replacement of Obsolete Allied MSIV Solenoids, 3/24/2020 (14) 50.59 Screening: ECR 72611, Update of CN-SCS-04-75, Rev. 0 (15) 50.59 Screening: ECR 72629, ILS03920A Setpoint Calibration Tolerance Change, Rev. 8 (16) 50.59 Screening: ECR 72656, Setpoint Change for Steam and Feedwater Flows Associated with ETBT72436, 2/28/2020 (17) 50.59 Screening: ECR 72692, Seismic Qualification of Replacement Microswitch CMC and PT Switches, Rev. 16 (18) 50.59 Screening: ECR 72763, Quantity of Scaffold Stored in Containment, Rev. 0

4 (19) 50.59 Screening: VC-20-00003, Deaerator Storage Tank Level Switch Upgrade, Rev.

4 (20) 50.59 Applicability Determination: ECR 72750, Time to Boil Enhancements, Rev. 0 INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.

On October 27, 2022, the inspectors presented the triennial inspection of evaluation of changes, tests and experiments baseline inspection results to Mr. George Lippard and other members of the licensee staff.

5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date DC00020-002 Passive Heat Sink Models Rev. 3 DC00020-198 Heat-Up Model For Water in the SFP, Reactor Cavity, and the Reactor Vessel Rev. 5 DC0316G-023 Seismic Design of Scaffolding Pole Storage Rack at Reactor Building 436 Rev. 3 DC0396H-049 Develop RRS for Seismic Testing of Replacement Microswitch CMC and PT Switches Rev. 0 DC0396H-051 Seismic Qualification Of Replacement CMC, Selector, And Pushbutton Switches Rev. 0 DC09320-029 Boric Acid Tank Levels Scaling (ILT00106, ILT00108, ILT00161, IL T00161A, ILT00163, IL T00163A)

Rev. 5 DC09610-068 Booster Pumps Component Cooling Water Flow Switch (IFS07100A and IFS07100B) Uncertainties Rev. 5 DC09620-004 Tech Spec Volumes for RWST, Condensate Storage Tank &

Boric Acid Tank Rev. 5 DC09620-015 Boric Acid Tank Level Instruments (ILT00106, ILT00108, ILT00161, ILT00161A, ILT00163)

Rev. 5 Calculations DC09670-010 RCP Undervoltage and Underfrequency Uncertainty Rev. 1 1603424 ILS03920A, Instrument Calibration 04/19/2017 1603425 ILS 03920B, Instrument Calibration 04/18/2017 1603426 ILS 03920C, Instrument Calibration 04/19/2017 1710528 ILS 03920A, Instrument Calibration 10/16/2018 1710529 ILS 03920B, Instrument Calibration 10/16/2018 Calibration Records 1710530 ILS 03920C, Instrument Calibration 10/16/2018 CR 18-02706 Pinhole leak below field weld (FW-1), downstream of XVB03123B.

7/2/18 CR 18-02797 NRC identified a small pinhole leak (~30 drops/min) in the pipe tee approximately 1 foot downstream of the weld below XVB03123A-SW 7/10/18 CR 18-02857 Pinhole leak in the Service Water System downstream of XVB03123A-SW 7/12/18 71111.17T Corrective Action Documents CR 19-01330 Pin hole leak from the service water piping downstream of 4/9/19

6 Inspection Procedure Type Designation Description or Title Revision or Date XVB03123B-SW, CC Heat Exc CR 20-02300 Reactor engineering and supplemental staff held an RF-25 outage critique 6/30/2020 CR1211170 Maximo contains incorrect information for ILS03920A 10/25/2022 CR1211309 NRC Identified: Brass Tube Fitting in Boric Acid Tank Room 10/26/2022 CR1211313 Dry chromate deposit discovered on instrument manifold valve for IFS07100A 10/26/2022 Corrective Action Documents Resulting from Inspection CR1211389 Flexible conduit routed to ILS03920B is not clamped in the flexible elbow adapter 10/27/2022 1MS-54-660 Piping and Instrumentation Drawing Train B Tag Number:

XHX0001B, XHX0001C; Sheet Number 1B Rev. 0A 1MS-54-660 Piping and Instrumentation Drawing Train B Tag Number:

XHX0001B, XHX0001C; Sheet Number 2B Rev. 0A B-814-551 I&C Instrument Diagram Auxiliary Building Roof Elevation 511' East and West Penetration Access Areas HVAC Flow Transmitter FT-9812 Rev. 0 D-302-841 FSAR Figure 9.4-22 Rev. 38 E-206-005 Simplified Plan Electrical Distribution Rev. 33 Drawings E-206-052 Electrical AC Low Voltage Power Panel Rev. 6 Engineering Evaluations EIR 82607 M&TE Guidance for RCP UF/UV and 7.2kV DV/LOV Surveillance Test Procedures 11/20/2019 1MS-94B-1879 GUTOR 80kVA UPS Rev. 5 ICP-240.033 Setpoint Data Sheet ILS03920A 10/18/2022 ICP-240.033 Setpoint Data Sheet ILS03920B 10/18/2022 Miscellaneous ICP-240.033 Setpoint Data Sheet ILS03920C 10/18/2022 ARP-016-XCP-6210-LCB3 HVAC Panel Rev. 2 Procedures SAP-0107 10CFR50.59 and 10CFR72.48 Review Process Rev. 8 2002904 ILT00106 Instrument Loop Calibration 01/27/2021 2002905 ILT00108 Instrument Loop Calibration 02/10/2021 2002906 ILT00163 Instrument Loop Calibration 02/15/2021 2005723 Inverter XIT5936 Post Modification Testing 09/16/2020 Work Orders 2007392 Spent Fuel Cooling Pump Alternate Power Supply Testing 09/08/2021

7 Inspection Procedure Type Designation Description or Title Revision or Date 2110313 IFS07100A, Flow Switch Calibration 10/20/2021 2110314 IFS07100B, Flow Switch Calibration 10/20/2021 88101027933 ILT00161 Instrument Loop Calibration 05/26/2022 88101039862 ILT00163A Instrument Loop Calibration 07/05/2022 88101042279 ILT00108 Instrument Loop Calibration 05/26/2022 WO 1904084-001 Post Maintenance Testing - STP0130.004D, MS Isolation Valve Full Stroke Testing 4/11/2020