{{#Wiki_filter:REQULA 3Y INFORi~)ATION DISTR IBUTI SYSTEN (R IDS)ACCESSION NBR: 8610140257 DOC.DATE: 86/09/2V NOTARIZED:
NO FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 50-26i H.B.Robinson Plant~Unit 2i Carolina Power~<Light C AUTH.NANE AUTHOR AFFILIATION ZINNERNAN>
S.R.Carolina Power Zc Light Co.RECIP.NANE RECIPIENT AFFILIATION RUBENSTEINi L.S.PWR ProJect Directorate 2
 
==SUBJECT:==
Requests approval to provide NRC w/NPDES permit 5 any authorized changes to enable adequate notiFication oF signiFicant environ events.DIBTRIDOTION CODE: BOEID COPIEB RECEIVED: LTR J ENCL 0 SIZE: TITLE: OR/Licensing Submittal:
Combined General Distribution NOTES:*p p l i cat i on For p ermi t r enewa l F i I ed.DOCKET I 05000400 0500026i 05000400 RECIPIENT ID CODE/NAl'IE PWR-A ADTS PWR-*EICSB PWR-A PD2 LA BUCKLEY>B Oi PWR-A PSB INTERNAL: ADN/LFI lB NRR BWR ADTS NRR PWR-B ADTS NRR/GRAS RQN2 COPIES LTTR ENCL R IPIENT ID"ODE/NANE PWR-A EB PWR-A FOB PWR-A PD2 PD 05 REGUAr Q Oi PWR~A RSB ELD/HDSi NRR PWR-A ADTS NRR/DSRO DIR LE 04 MIB CO<IES LTTR ENCL EXTERNAl: LPDR NSIC 03 06 NRC PDR 02 PNL QRUELIR TOTAL NUi'}BER OF COPIES REGUIRED: LTTR 26 ENCL'J l I II l Carolina Power 8 Light Company SEP 2 9 1986 SERIAL: NLS-86-367 Director of Nuclear Reactor Regulation Attention:
Mr.Lester S.Rubenstein, Director PWR Project Directorate
$32 Division of PWR Licensing-A United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 DOCKET NO.50-000 H B ROBINSON STEAM ELECTRIC PLANT~UNIT NO 2 DOCKET NO.50-261/LICENSE NO.DPR-23 ENVIRONMENTAL TECHNICAL SPECIFICATIONS
 
==Dear Sir:==
The NRC, by letter dated September 13, 1985, has asked the H.B.Robinson Steam Electric Plant, Unit No.2 (HBR2), to submit Environmental Technical Specifications.
In response, by letter dated October 18, 1985, Carolina Power R Light Company (CPttt:L)roposed a resolution for HBR2 similar to the resolution for Brunswick Steam Electric lant (BSEP).With the issuance of an operating license for the Shearon Harris Nuclear Power Plant (SHNPP)expected in the near future, the subject of Environmental Technical Specifications is also relevant for that plant.It is CPdcL's position that the NPDES Permit provides the benchmark for determining significant environmental issues.The NPDES Permit is issued after a thorough review of applicable state and federal environmental regulations.
The implication is that operating in accordance with the NPDES Permit would not result in a significant adverse impact to the environment.
Accordingly, CPRL contends that the NRC can adequately fulfill its obligations under NEPA bykelng kept informed of those activities covered by the NPDES Permit.Therefore, providing the NRC with copies of the NPDES Permit and any authorized changes thereto, as well as copies of reports filed in accordance with the NPDES Permit, provides the NRC with adequate notification of significant environmental events.This approach was approved for our Brunswick Plant by NRC letter dated March 1 1, 1983 (D.B.Vassallo to E.E.Utley).In the interest of consistency and the avoidance of duplication of effort in maintaining two programs with no added benefit, we request approval of this approach for HBR2 and SHNPP.Questions regarding this matter may be referred to me at (919)836-6202.Yours very truly, S.R im erman ger Nuclear Licensing Section 3SK/vaw (50003SK)cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
Dr.3.Nelson Grace (NRC-RII)Mr.G.Requa (NRC)Mr.H.Krug (NRC Resident Inspector-RNP)411 Favettevilte stre~t>p~o.Box 1551 o Raleigh, N, c.27602 Sb10140257 Bb0929 PDR ADQCK 05000400.~A PDR g)P~}}

Revision as of 00:32, 11 September 2018

Requests Approval to Provide NRC W/Npdes Permit & Any Authorized Changes to Enable Adequate Notification of Significant Environ Events
ML18022A445
Person / Time
Site: Harris, Robinson  Duke Energy icon.png
Issue date: 09/29/1986
From: ZIMMERMAN S R
CAROLINA POWER & LIGHT CO.
To: RUBENSTEIN L S
Office of Nuclear Reactor Regulation
References
NLS-86-367, NUDOCS 8610140257
Download: ML18022A445 (4)


Text

REQULA 3Y INFORi~)ATION DISTR IBUTI SYSTEN (R IDS)ACCESSION NBR: 8610140257 DOC.DATE: 86/09/2V NOTARIZED:

NO FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 50-26i H.B.Robinson Plant~Unit 2i Carolina Power~<Light C AUTH.NANE AUTHOR AFFILIATION ZINNERNAN>

S.R.Carolina Power Zc Light Co.RECIP.NANE RECIPIENT AFFILIATION RUBENSTEINi L.S.PWR ProJect Directorate 2

SUBJECT:

Requests approval to provide NRC w/NPDES permit 5 any authorized changes to enable adequate notiFication oF signiFicant environ events.DIBTRIDOTION CODE: BOEID COPIEB RECEIVED: LTR J ENCL 0 SIZE: TITLE: OR/Licensing Submittal:

Combined General Distribution NOTES:*p p l i cat i on For p ermi t r enewa l F i I ed.DOCKET I 05000400 0500026i 05000400 RECIPIENT ID CODE/NAl'IE PWR-A ADTS PWR-*EICSB PWR-A PD2 LA BUCKLEY>B Oi PWR-A PSB INTERNAL: ADN/LFI lB NRR BWR ADTS NRR PWR-B ADTS NRR/GRAS RQN2 COPIES LTTR ENCL R IPIENT ID"ODE/NANE PWR-A EB PWR-A FOB PWR-A PD2 PD 05 REGUAr Q Oi PWR~A RSB ELD/HDSi NRR PWR-A ADTS NRR/DSRO DIR LE 04 MIB CO<IES LTTR ENCL EXTERNAl: LPDR NSIC 03 06 NRC PDR 02 PNL QRUELIR TOTAL NUi'}BER OF COPIES REGUIRED: LTTR 26 ENCL'J l I II l Carolina Power 8 Light Company SEP 2 9 1986 SERIAL: NLS-86-367 Director of Nuclear Reactor Regulation Attention:

Mr.Lester S.Rubenstein, Director PWR Project Directorate

$32 Division of PWR Licensing-A United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 DOCKET NO.50-000 H B ROBINSON STEAM ELECTRIC PLANT~UNIT NO 2 DOCKET NO.50-261/LICENSE NO.DPR-23 ENVIRONMENTAL TECHNICAL SPECIFICATIONS

Dear Sir:

The NRC, by letter dated September 13, 1985, has asked the H.B.Robinson Steam Electric Plant, Unit No.2 (HBR2), to submit Environmental Technical Specifications.

In response, by letter dated October 18, 1985, Carolina Power R Light Company (CPttt:L)roposed a resolution for HBR2 similar to the resolution for Brunswick Steam Electric lant (BSEP).With the issuance of an operating license for the Shearon Harris Nuclear Power Plant (SHNPP)expected in the near future, the subject of Environmental Technical Specifications is also relevant for that plant.It is CPdcL's position that the NPDES Permit provides the benchmark for determining significant environmental issues.The NPDES Permit is issued after a thorough review of applicable state and federal environmental regulations.

The implication is that operating in accordance with the NPDES Permit would not result in a significant adverse impact to the environment.

Accordingly, CPRL contends that the NRC can adequately fulfill its obligations under NEPA bykelng kept informed of those activities covered by the NPDES Permit.Therefore, providing the NRC with copies of the NPDES Permit and any authorized changes thereto, as well as copies of reports filed in accordance with the NPDES Permit, provides the NRC with adequate notification of significant environmental events.This approach was approved for our Brunswick Plant by NRC letter dated March 1 1, 1983 (D.B.Vassallo to E.E.Utley).In the interest of consistency and the avoidance of duplication of effort in maintaining two programs with no added benefit, we request approval of this approach for HBR2 and SHNPP.Questions regarding this matter may be referred to me at (919)836-6202.Yours very truly, S.R im erman ger Nuclear Licensing Section 3SK/vaw (50003SK)cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Dr.3.Nelson Grace (NRC-RII)Mr.G.Requa (NRC)Mr.H.Krug (NRC Resident Inspector-RNP)411 Favettevilte stre~t>p~o.Box 1551 o Raleigh, N, c.27602 Sb10140257 Bb0929 PDR ADQCK 05000400.~A PDR g)P~