TXX-6744, Advises That Completion Date for Ncr E85-101983 Cable Rework Revised to 871001 Due to Deficiencies Noted in Cables,Per NRC Notice of Violation Item A(2) Noted in Insp Repts 50-445/86-06 & 50-446/86-04

From kanterella
(Redirected from TXX-6744)
Jump to navigation Jump to search
Advises That Completion Date for Ncr E85-101983 Cable Rework Revised to 871001 Due to Deficiencies Noted in Cables,Per NRC Notice of Violation Item A(2) Noted in Insp Repts 50-445/86-06 & 50-446/86-04
ML20234C842
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/14/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-6744, NUDOCS 8709210434
Download: ML20234C842 (1)


Text

_ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ _ _ _ - _ - _ _

l

-1 l

l H

=== 9 Log # TXX-6744 File # 10130 C. . .= IR 86-06

= = 1R 86-04 7t# ELECTRIC Ref # 10 CFR 2.201

! .wmiam c. counsa September 14, 1987

( Executne Vwe President U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Wa.shington, D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 i INSPECTION REPORT NO. 50-445/86-06 AND 50-446/86-04 REVISED DATE OF COMPLIANCE TO NOTICE OF VIOLATION (N0V) ITEM A(2)

REFERENCE:

1) TUGCo Letter TXX-5037 from W. G. Counsil to E. H. Johnson dated October 9, 1986
2) TUGCo letter TXX-6071 from W. G. Counsil to l E. H. Johnson dated October 31, 1986
3) TUGCo Letter TXX-6213 from W. G. Counsil to '

E. H. Johnson dated January 22, 1987

4) TV Electric letter TXX-6387 from W. G. Counsil to NRC dated May 8, 1987
5) TV Electric Letter TXX-6481 from W. G. Counsil to NRC dated June 30, 1987 Referer,ce (4) provided our revised response to NOV 446/8604-V-02 Item A(2).

In our response we stated that the cable rework associated with NCR E85-101983 would be completed by July 1,1987. In Reference (5) we stated that, due to a conflict with Unit 1 switchgear rework, the completion date for NCR E85-101983 cable rework was extended to September 1, 1987.

During the rework process, deficiencies (unrelated to those described in the NOV) were noted on some of the cables. As a result of these deficiencies, the rework of approximately 10 of the 160 cables was incomplete as of September 1, 1987. Our completion date for the cable rework associated with NCR E85-101983 (which has been transferred to NCR CE-87-7481) is therefore revised to be October 1, 1987. This matter was discussed with Mr. P. Wagner and Mr. I.

Barnes of your office on September 1,1987.

Very Truly Yours

. .f, W. G. Counsil RS8/tgj c- Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) /j 8709210434 870914 PDR ADOCK 00000445,,-

4 [g{

G PDR ;

400 North Obve Street LB 81 Dallas, Texas 7.U01