TXX-6685, Forwards Rev 1 to Comanche Peak Response Team Results Rept Issue-Specific Action Plan Rept Iii.C, Prerequisite Testing

From kanterella
(Redirected from TXX-6685)
Jump to navigation Jump to search
Forwards Rev 1 to Comanche Peak Response Team Results Rept Issue-Specific Action Plan Rept Iii.C, Prerequisite Testing
ML20237H234
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/25/1987
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237H238 List:
References
CPRT-988, TXX-6685, NUDOCS 8709030179
Download: ML20237H234 (4)


Text

_ _ .

P

, . L llllllll:' = Log # TXX-6685 L- 4 CPRT-988 E E File # 10068 1UELECTRIC wmum c. coumii Decutne %ce hnkkmt August 25, 1987 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 CPRT RESVLTS REPORT Gentlemen:

We transmit herewith the following SRT Results Report:

Ill.c. Prerequisite Testing - Revision 1 This report should be placed in sequence behind the tab " Testing" in the results reports binders previously transmitted. Also, enclosed is a revised lable of Contents reflecting the issuance of this report.

The files which contain supporting documentation for this Results Report have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms. Susan Palmer (214/812-8242).

We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.  ;

Very truly yours, u) c. w W. G. Counsil By:

Jp/hnW. Beck 0709030179 870825 Vice President l gDR ADOCK 0500 S Nuclear Engineering i l

lLS/mgt l c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)

DoVI MJO North Olne Street I.B 88 Dallas. Texas 7201 J

t-I

-s TABLE OF CONTENTS V

C_0_LLECTIVE SIGNIFICANCE REPORT

- Later -

COLLECTIVE EVALUATION REPORTS

- Later -

RESULTS REPORTS Electrical I.a.1 Heat-Shrinkable Cable Insulation Sleeves -

Revision 1 1.a.2 Inspection Reports on Butt-Splices, Revision 1 1.a.3 Butt-Splice Qualification - Revision 1 I.a.4 Agreement Between Drawings and Field Terminations

- Revision 2 1.a.5 NCR's on Vendor Installed Amp Terminal Lugs r- - Revision 1

('-' 'N l l.b.1 Flexible Conduit to Flexible Conduit Separation

- Revision 1 1.b.2 Flexible Conduit to Cable Separation - Revision 1 1.b.3 Conduit to Cable Tray Separation - Revision 1 1.b.4 Barrier Removal - Revision 1 Civil / Structural II.b Concrete Compression Strength - Revision 1 II.c Maintenance of Air Gap Between Concrete Structures

- Revision 1 7

Q,

i ht' - -

l

'~

Testing III.a.1 Hot Functional Testing - Revision 1 III.a.2 JTG Approval of Test Data - Revision 0 III.a.3 Technical Specification for Deferred Tests

- Revision 0 III.a.4 Traceability of Test Equipment - Revision 0 III.a.5 Preoperational Test Review and Approval of Results, Revision 1 III.b Conduct of the CILRT - Revision 0 III.c Prerequisite Testing - Revision 1 III.d Preoperational Testing - Revision 1 Mechanical

,_s V.a inspection for Certain Types of Skewed Welds in NF l ) Supports - Revision 1

,j V.c Design Consideration for Piping Systems Between Seismic Category I and Non-Seismic Category I Buildings - Revision 1 V.d Plug Welds - Revision 1 V.c Installation of Main Steam Pipes - Revision 1 VI.a Gap between Reactor Pressure Vessel Reflective Insulation and the Biological Shield Wall, Revision 1 9

Sqt .

f~3 i!a QA/QC 1.d.2 Guidelines for Administration of QC Inspector Test

- Revision 1 1.d.3 Craft Personnel Training - Revision 1 VII.a.1 Material Traceability - Revision 1 VII.a.2 Nonconformance and Corrective Action System -

Revision 1 VII.a.3 Document Control - Revision 1 VII.a.4 Audit Program and Auditor Qualification -

Revision i Vll.a.5 Periodic Review of QA Program - Revision 1 Vll.a.6 Exit Interviews - Revision i VII.a.7 Housekeeping and System Cleanliness - Revision i VII.a.8 Fuel Pool Liner Documentation - Revision 1

(;. Vll.b.1 Onsite Fabrication - Revision 1 O

VII b.2 Valve Disassembly - Revision 1 VII.b.4 Hilti Anchor Bolt Installation - Revision 1 j DSAPs

- Later -

,, ~\