TXX-6223, Forwards Revs 1 to Comanche Peak Response Team Results Repts Isap I.a.1,ISAP I.b.4,ISAP Ii.C,Isap V.D & Isap VII.a.3

From kanterella
Jump to navigation Jump to search
Forwards Revs 1 to Comanche Peak Response Team Results Repts Isap I.a.1,ISAP I.b.4,ISAP Ii.C,Isap V.D & Isap VII.a.3
ML20212H301
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/16/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML20212H304 List:
References
CPRT-806, TXX-6223, NUDOCS 8701210346
Download: ML20212H301 (3)


Text

.

CPRT-806 LOG NO. TXX-6223 FILE NO. 10068 TEXAS UTILITIES GENERATING COMPANY MEYWAY FOWER . 400 NORT98 OtJVE 8BTERET. L.E. S & . EDALLAS. TEXAS 78901 wwwa January 16, 1987

.mo ... m.cou.a...n, Director of Nuclear Reactor Regulation ATTN: Mr. V. S. Noonan, Director Comanche Peak Project Division of Licensing V. S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 CPRT RESULTS REPORTS

Dear Mr. Noonan:

We transmit herewith the following SRT approved Results Reports:

I.a.1 Heat-Shrinkable Cable Insulation Sleeves, Revision 1 I.b.4 Barrier Removal, Revision 1 II.c Maintenance of Air Gap Between Concrete Structures, Revision 1 i

VII.a.3 Document Control, Revision 1 I V.d Plug Welds, Revision 1 l These reports should be placed in sequence behind the tab " Electrical" for I.a.1 and I.b.4; " Civil / Structural" for II.c; "QA/QC" for VII.a.3; and " Mechanical" for V.d in the results reports binders previously transmitted. Also, enclosed is a revised Table of Contents reflecting the issuance of these reports.

The files which contain supporting documentation for these Results Reports have been reproduced in their entirety and are available for public inspection in our Dallas office. Anyone wishing to inspect these files should contact Ms,. Susan Palmer (214/979-8242).

We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.

Very truly yours, j j/g l

. G. Counsil n' 3 WGC:tj 00 Enclosures

,. A DEVENION UV TEXAN UTELITIEN ELEtTNIC (DMPANY 8701210346 870116 PDR ADOCK 05000445 O JPT@ . . . .

e TABLE OF CONTENTS COLLECTIVE SIGNIFICANCE REPORT

- Later -

COLLECTIVE EVALUATION REPORTS

- Later -

RESULTS REPORTS Electrical l 1.a.1 Heat-Shrinkable Cable Insulation Sleeves -

Revision I.a.3 Butt-SpIice Qualification - Revision 1

~

1.a.4 Agreement Between Drawings and Field Terminations

- Revision 2 I.a.5 NCR's on Vendor Installed Amp Terminal Lugs .

- Revision 1 I.b.1 Flexible Conduit to Flexible Conduit Separation O

- Revision 1 I.b.2 Flexible Conduit to Cable Separation - Revision 1 I.b.3 Conduit to Cable Tray Separation Revision 1 I,b.4 Barrier Removal - Revision 1 Civil / Structural II.b Concrete Compression Strength - Revision 1 II.c Maintenance of Air Gap Between Concrete Structures

- Revision 1 Testina III.a.2 JTG Approval of Test Data - Revision 0 III.a.3 Technical Specification for Deferred Tests

- Revision 0 III.a.4 Traceability of Test Equipment - Revision 0 III.d Preoperational Testing - Revision 1

. J

k ~

TABLE OF CONTENTS (cont.)

Mechanical V.a Inspection for Certain Types of Skewed Welds in NF Supports - Revision 1 V.c Design Consideration for Piping Systems Between Seismic Category I and Non-Seismic Category I Buildings - Revision 1 V.d Plug Welds - Revision 1 V.e Installation of Main Steam Pipes - Revision 1 0A/0C I.d.2 Guidelines for Administration of QC Inspector Test

- Revision 1 I.d.3 Craft Personnel Training - Revision 1 VII.a.3 Document Control - Revision 1 O VII.a.4 Audit Program and Auditor Qualification -

Revision 1 -

VII.a.5 Periodic Review of QA Program - Revision 1 VII.a.6 Exit Interviews - Revision 1 VII.a.7 Housekeeping and System Cleanliness - Revision 1 VII.a.8 Fuel Pool Liner Documentation - Revision 1 VII,b.2 Valve Disassembly - Revision 1 DSAPs i

- Later -