TXX-6212, Forwards Addl Info in Response to Violations Noted in Insp Rept 50-446/85-11,per NRC 861230 Request.Corrective Action: Training Program for S&W Pipe Support Organization Verified & Engineering Supervisor No Longer Active in Organization

From kanterella
(Redirected from TXX-6212)
Jump to navigation Jump to search
Forwards Addl Info in Response to Violations Noted in Insp Rept 50-446/85-11,per NRC 861230 Request.Corrective Action: Training Program for S&W Pipe Support Organization Verified & Engineering Supervisor No Longer Active in Organization
ML20212Q385
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/19/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-6212, NUDOCS 8702020241
Download: ML20212Q385 (2)


Text

- ,

.'.. Log # TXX-6212 File # 10130 IR 85-14 TEXAS UTILITIES GENERATING COMPANY 85-11 SKt 4/AY TOWER . 400 NORTH OLIVE STREPT.1.B. SB . DALLAS, TEXAS 7MSI January 19, 1987 r, j

' . m "c , ; ; . , ,

'p : ; -/ n .2  ;

~

I" 'E' JAN 2 31987 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects

, hg U. S. Nuclear Regulatory Commission __ .__i l 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS.: 50-445/85-14 AND 50-446/85-11 SUPPLEMENTAL REQUEST FOR INFORMATION TO NRC NOTICE OF VIOLATION (N0V) ITEM D.

REF: 1) TUGC0 Letter TXX-4779 from W. G. Counsil to E. H. Johnson dated May 16, 1936,

2) TUGC0 Letter TXX-4955 from W. G. Counsil to E. H. Johnson dated August 14, 1986.

Dear Mr. Johnson:

We have reviewed your letter dated December 30, 1986, requesting additional information to our responses referenced above regarding NOV 446/8511-V-03 (Item D). We hereby respond to the request for supplemental information in the attachment to this letter.

Very truly yours, l'70 W. G. Counsil RSB/amb:lw Attachment c - NRC Region IV (0 + 1 copy)

Director, Inspection and Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. V. S. Noonan Mr. D. L. Kelley 8702020241 870119 PDR ADOCK 0500044h o eor j gn /

4 . , , , , , , . , . , , , , - , , , . . . . , , , - . . . . . . , . .

Ill

. . ' . Attachment to TXX-6212 January 19, 1987 Page 1 of 1 NOTICE OF VIOLATION ITEM (446/8511-V-03)

SUPPLEMENTAL REQUEST FOR INFORMATION As a result of review made during followup inspection of your corrective actions, we find that a clarification is required relative to your response to Item D in the Notice of Violation. Specifically, the stated reason for the violation correctly indicated that TUGCo Nuclear Engineering (TNE) Procedure TNE-AD-4 was not followed concerning maintenance of duplicate copies of engineering documents. The response does not address or consider, however, that the NRC inspector was informed by an engineering supervisor during the inspection that, due to organizational changes, Procedure CP-EI-18.0-4, Revision 0, had been deleted and shipment was made without a procedure being in effect. In that this information is believed to have a bearing on the scope of required steps to avoid recurrence (i.e., was training given to engineering personnel concerning procedures in existence in the organization to which they transferred?)...

SUPPLEMENTAL RESPONSE TO ITEM D In our previous response, we noted the creation of an engineering instruction, TNE-AD-4-6, to specifically control the transmittal and duplicate retention of pipe support calculations and measures to assure accountability. These actions have been completed. We have verified that the training of the personnel who implemented TNE-AD-4-6 was conducted and covered the period of implementation of the procedure.

We have verified that the training program of the SWEC pipe support organization includes newly transferred employees. In examining the circumstances surrounding the statement by the engineering supervisor interviewed by the NRC inspector, we have concluded the supervisor was not trained in the requirements of TNE-AD-4 until December 1985 due to the period of transition. Subsequent corrective measure: involving the specific supervisor are no longer appropriate as the individual is no longer active within the engineering organization.