Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K6141990-09-17017 September 1990 Submits Documentation of 900906 Telcon Re Addl Util Candidate for Licensed Operator Generic Fundamentals Exam Section ML20059G8761990-09-10010 September 1990 Forwards Rev 8 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20059F8461990-09-0404 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0705.Corrective action:OPT-467A Changed to Provide Addl Prerequisite Info Re Solid State Protection Sys Switch Lineup During Testing ML20059E4981990-08-31031 August 1990 Forwards Revised Radial Peaking Factor Limit Rept for Cycle 1 Per Tech Specs Through Amend 1 & ML20059E4201990-08-30030 August 1990 Forwards Objectives & Guidelines for 1990 Emergency Preparedness Exercise Scheduled for 901113 ML20028G8281990-08-29029 August 1990 Forwards Comanche Peak Unit 1 Semiannual Radioactive Effluent Release Rept,900403-0630 & ODCM TXX-9030, Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-1311990-08-27027 August 1990 Forwards Endorsements 40 & 4 to Nelia Policy NF-274 & Maelu Policy M-90,respectively & Endorsements 10,11,12,13,14 & 15 to Maelu Policy MF-131 ML20059F4381990-08-23023 August 1990 Forwards Public Version of Revised Emergency Plan & Corporate Emergency Response Procedures,Consisting of Rev 1 to EPP-313,Rev 7 to CERP-101,Rev 7 to CERP-102 & Revised Forms.W/Dh Grimsley 900906 Release Memo TXX-9029, Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents1990-08-20020 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57.Corrective Actions:Storage Facilities for Instrumentation & Control Work Packages Improved to Provide Acceptable Protection for Documents ML20058P0571990-08-13013 August 1990 Forwards, Comanche Peak Steam Electric Station Unit 1 Control Room Simulator 10CFR55 Certification Initial Rept ML20058N2311990-08-0909 August 1990 Forwards First Half 1990 fitness-for-duty Program Performance Data,Per 10CFR26.71(d).Point of Contact for Personnel,Random Testing Program Results & Confirmed Positive Tests Summary & Mgt Summary Included in Data ML20059A5831990-08-0404 August 1990 Responds to Info Request Made During 900802 Meeting Re Inadvertent Safety Injections on 900726 & 30 & Results of 100% Power Plateau Testing TXX-9024, Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel1990-08-0303 August 1990 Provides Status of Exam Activity & Revised Completion Schedule for Portion of Exam.Util Deferred Preoperational Testing of Facility Spent Fuel Pool Cooling & Cleanup Sys Until Prior to First Off Loading of Spent Fuel TXX-9022, Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station1990-07-31031 July 1990 Forwards Detailed Descriptions of Changes in Amend 79 to FSAR for Comanche Peak Steam Electric Station TXX-9027, Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required1990-07-30030 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required ML20055J1571990-07-27027 July 1990 Submits Info Re Replacement of Borg-Warner/Intl Pump,Inc Check Valve Swing Arms,Per .Swing Arms in ASME Code Class 2 Check Valves Will Be Replaced During First Refueling Outage ML20056A0461990-07-24024 July 1990 Requests Regional Waiver of Compliance for Containment Pressure Transmitter 1-PT-934 During Coming Outage TXX-9023, Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility1990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Subj Transmitters in Existence at Facility ML20055G6351990-07-17017 July 1990 Submits Results of Remote Shutdown Panel Environ Survey ML20055F9391990-07-13013 July 1990 Advises That Operators Have Gained Significant Experience in Operating Plant Under Wide Range of Conditions & Have Demonstrated Necessary Proficiency to Safely Operate Unit ML20055F9371990-07-13013 July 1990 Submits Info Re Revised Acceptance Criteria for THERMO-LAG Fire Barrier,Per 900705 Telcon.On Exposure to Heat Flux at Surface of Barrier,Listed Mechanisms Activated.Fire Testing Demonstrates That Panels Qualified W/Variation in Thickness ML20044A7001990-06-26026 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Util Will Implement for Unit 2 Activities Performed for Unit 1 ML20044A1411990-06-20020 June 1990 Forwards Endorsements 4 & 5 to Nelia Certificate N-90, Endorsements 5 & 6 to Maelu Certificate M-90 & Endorsements 34,35,36,37,38 & 39 to Nelia Policy NF-274 ML20043H7031990-06-18018 June 1990 Discusses Mod/Rework to Auxiliary Feedwater Sys Check Valves Mfg by Bw/Ip Intl,Inc.All But One Affected Check Valve modified.Motor-driven Auxiliary Feedwater Pump Discharge Valve Check Valve Body Replaced ML20043H2181990-06-15015 June 1990 Forwards Response to 900515 Request for Addl Info on Emergency Preparedness.Ongoing Emergency Preparedness Programs Address Concerns Raised by Citizens for Fair Util Regulation ML20043G3131990-06-15015 June 1990 Forwards Addl Info Re Pressurizer Surge Line Thermal Stratification & leak-before-break Evaluation & Nonproprietary Suppl 3 to WCAP-12247, Supplementary Assessment... & Proprietary Suppl 3 to WCAP-12248 ML20043C5671990-06-0101 June 1990 Discusses Identification of Slave Relays Tested Using Alternative Methodology,Per 900402 Commitment.Encl Tabulation Identifies Test Type,Applicable Procedures & Equipment & Impact of Improper Documentation ML20043E7131990-06-0101 June 1990 Responds to NRC 900517 Notice of Violation & Imposition of Civil Penalty in Amount of $25,000.Corrective Action:Qc Mgt Counseled Level III Inspector & QC Supervisor on Importance of Good Communications W/Receipt Inspectors ML20043C4501990-05-31031 May 1990 Advises That Util Revised FSAR Section 15.1.2 & Question/ Response 32.108,per 10CFR50.59 ML20043B5471990-05-25025 May 1990 Provides Status of Facility Design & Const Activities,Per Request.Detailed Design Work Will Resume in June 1990.Const Activities Expected to Increase Signficantly by Jan 1991 ML20043B5481990-05-23023 May 1990 Provides Clarification of 890710 Commitment Re Power Ascension Program.Cooldown Portion of Remote Shutdown Test Performed During Preoperational Testing,Per FSAR & Reg Guide 1.68.2 ML20043D1711990-05-21021 May 1990 Forwards Public Version of Revised Emergency Plan Procedures,Including Rev 8 to EPP-109,Rev 7 to EPP-112,Rev 4 to EPP-116 & Rev 6 to EPP-121.W/DH Grimsley 900604 Release Memo TXX-9018, Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment1990-05-21021 May 1990 Advises of Completion of Implementation of Requirements of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety- Related Equipment ML20043B0981990-05-15015 May 1990 Forwards Radial Peaking Factor Limit Rept for Cycle 1, Containing F(Xy) Limits for All Core Planes Containing Bank D Control Rods & All Unrodded Core Planes ML20042F2851990-05-0303 May 1990 Supplemental Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. ML20042F3861990-05-0303 May 1990 Responds to NRC 900410 Ltr Re Violations Noted in Insp Repts 50-445/90-10 & 50-446/90-10 on 900206-07 & 0226-0302. Corrective Action:Memo Issued Emphasizing That Discrepancies Should Be Brought to Attention of Site Organizations ML20042F3021990-05-0202 May 1990 Responds to NRC 900402 Ltr Re Violations Noted in Insp Repts 50-445/89-23 & 50-446/89-23.Util Does Not Believe That Circumstances Described in 900402 Ltr Constitutes Violation of 10CFR50.9(a) ML20042F3051990-05-0202 May 1990 Provides Revised Response to Generic Ltr 88-17 Re Loss of DHR ML20042E4581990-04-12012 April 1990 Responds to Inconsistencies in Terminology & Labelling Identified During NRC 890118 & 19 Audit of Facility Dcrdr. Util Believes Control Room Inventory Requirement of Suppl 1 to NUREG-0737,satisfied ML20042E0701990-04-10010 April 1990 Discusses 900305 Meeting W/Nrc in Rockville,Md Re Offsite Power Availability for Automatic Switch Co Solenoids for MSIV in Event of Nonmechanistic Main Steam Line Crack in Superpipe Region ML20012F5011990-04-0303 April 1990 Forwards Corrections to 891016 Response to Emergency Diesel Generator Engine Requirements.Lengths of Two Pairs of Bolts Above Crankpin Shall Be Measured Ultrasonically Before Detensioning & Disassembly of Bolts ML20012F3221990-04-0202 April 1990 Discusses ESF Sys Slave Relay Alternate Test Methodology. Implementation Schedule for Design Mods to Relay Will Be Submitted by 900601 ML20042D8081990-03-29029 March 1990 Forwards Proposed Change to FSAR Section 13.4 Re Station Operations Review Committee.Similar Change Submitted in 900328 Ltr for Chapter 6 of Facility Tech Specs ML20012F0411990-03-28028 March 1990 Forwards marked-up Pages of Facility Draft Tech Specs & Bases (NUREG-1381) Provided W/Low Power OL ML20012E6051990-03-27027 March 1990 Forwards Endorsements 1-4 to Maelu Certificate M-90, Endorsements 1-9 to Maelu Policy MF-131,Endorsements 29-33 to Nelia Policy NF-274 & Endorsements 1-3 to Nelia Certificate N-90 ML20012E6531990-03-27027 March 1990 Provides Final Response to Reporting Requirement 2 of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to RCS, for Unit.Nde Requirements of Action 2 Not Considered Applicable to Unit ML20012E1911990-03-23023 March 1990 Forwards Comanche Peak Steam Electric Station Unit 1 Cycle 1 Startup Physics Tests Control Rod Worth Predictions Utilizing TU Electric Control Rod Swap Methodology. ML20012E1581990-03-23023 March 1990 Clarifies 880624 Response to NRC Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. ML20012D0201990-03-19019 March 1990 Advises That Allegations Provided to NRC by Former Util Employee Unsubstantiated,Based on Investigation by Util Safeteam Organization ML20012E2181990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Util Determined That Loss of safety-related Inverters 1 or 2 Would Involve Coincidental Opening of Main Feedwater Valves 1990-09-04
[Table view] |
Text
_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1*
l Log # TXX-4494 :
! TEXAS UTILITIES GENERATING COMPANY File # 10035 m M V WAT 1s tW k e$
- 4teet Ne BN TH $l1.8% M MI Nkki, l..It. all S isAl.l. Ate.1 k nam 1334e1 i
+
J
- 'S.",",.* ,,",l,*, ,a June 14, 1985 1 :
Mr. Hugh L. Thompson, Jr.
Director 9 l Division of Licensing !
j U. S. Nuclear Regulatory Commission Washington, D.C. 20555 r i <
.l
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
- 90CKET NOS. 50-445 AND 50-446 1 NRC GENERIC LETTER 85-02 t
e
Dear Mr. Thompson:
Attached is the CPSES response to NRC Generic Letter 85-02, " Staff Recommended Actions Stemming from NRC Integrated Program for the Resolution (
}
of Unresolved Safety Issues Regarding Steam Generator Tube Integrity".
l t
l Sincerely, ,
! b Al
/
M -
l John W. Beck '
I RWH:grr i i Attachment i
i I I
I l
l I
i I
I l
45 t l PM "
l i
1
- h A llhl'$R$$5N $$Y $$$kN $'$$$.$$h5N $$=5$"$N$$ $ $5N$ kNY
COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO NRC GENERIC LETTER 85-02 (ENCLOSURE 1) 1.a PREVENTATION AND DETECTION OF LOOSE PARTS (INSPECTIONS) i NRC Comment: Visual inspections should be performed on the steam ,
generator secondary side in the vicinity of the tube sheet, both along the entire periphery of the tube bundle and along the tube line, for purposes of identifying loose ,
parts or foreign objects on the tubesheet, and external [
damage to peripheral tubes just above the tubesheet. An appropriate optical device should be used (e.g., mini-TV ;
camera, fiber optics). Loose parts or foreign objects ;
which are found should be removed from the steam generators. Tubes observed to have visual damage should be eddy current inspected and plugged if found to be defective.
These visual inspections should be performed: (1) for all steam generators at each plant at the next planned outage for eddy current testing, (2) after any secondary side modifications, or repairs, to steam generator internals, ,
and (3) where eddy current indications are found in the i free span portion of peripheral tubes, unless it has been '
established that the indication did not result from damage ,
by a loose part or foreign object. '
For PWR OL applicants, such inspections should be part of !
the preservice inspection. !
\
CPSES Response: The preservice inspection (PSI) of steam generators ;
conducted by CPSES meets the staff recommendations for PWR '
OL applicants. All four steam generators were preservice [
inspected for loose parts through the four 2" 1.D. !
inspection openings used for sludge lancing, j t
The PSI techniques utilized a 35mm camera in conjunction !
with a 9 ft. x 8 mm fiberscope. The accessible areas were searched through the fiberscope. Photographs were taken i
of foreign objects in the original position in which they were located on the tubesheet. No damaged tubes were ;
identified and all foreign objects which were found as a result of this preservice inspection were removed from the
! steam generators.
i l
i In addition to the PSI for loose parts, CPSES elected to ,
i install a digital loose part locator (DLPL) to detect the ;
presence of loose parts and foreign objects. The CLPL l utilizes an array of 20 loose parts monitoring sensors :
l Installed in the nuclear steam system; 8 of which are ,
i installed in the steam generators. i l :
- NRC Comment
- For steam generator models where certain segments of the peripheral region can De shown not to be accessible to an appropriate optical device, licensees and applicants l should implement alternative actions to address these '
inaccesstale areas, as appropriate.
1 CPSES Response: Both the D-4 and 0-5 model steam generators designed by
! Westinghouse and installed in units 1 and 2 respectively, may be visually inspected in the peripheral region 1 (annulus) above the tubesheet with fiberoptics, by entering through the sludge lance ports.
NRC Comment: Licensees thould take appropriate precautions to minimize
- the potential for corrosion while the tube bundle is
- exposed to air. The presence of chemical species such as
- sulfur may aggravate this potential, and may make exposure to the atmosphere inadvisable until appropriate remedial
- measures are taken, l
l CPSES Response: It is not anticipated that the tube bundles will be exposed to air except when the 2" inspection ports are
- open for scheduled sludge lancing during each refueling.
It is estimated that the sludge lancing activity will take approximately 41 hours4.74537e-4 days <br />0.0114 hours <br />6.779101e-5 weeks <br />1.56005e-5 months <br /> total for all four generators; therefore, tube exposure to air will be kept to a minimum.
i 1.b PREVENTION AND DETECTION OF LOOSE PARTS (QUALITY ASSURANCE)
NRC Comment: Quality Assurance / Quality Control procedures for steam
- generators should be reviewed and revised as rocessary to ensure that an effective system exists to preclude introduction of foreign objects into either the primary or secondary side of the steam generator whenever it is l' opened (e.g., for maintenance, sludge lancing, repairs, inspection operations, modifications). As a minimum, such procedures should include: (1) detailed accountability procedures for all tools and equipment used during an operation, (2) appropriate controls on foreign objects
- such as eye glasses and film badges, (3) cleanliness requirements, and (4) accountablity procedures for l components and parts removed from the internals of major i components (e.g., reassembly of cut and removed j components).
CPSES Response: When a pressure boundary is breached at CPSES, j housekeeping / cleanliness control requirements are 1 established commensurate with the system's importance to
! safety. Procedures impicmenting requirements for
! personnel, material and tool accountability for these designated areas are in force. Access and agress from l zones requiring personnel and/or material and tool i accountability is controlled and monitored by an individual assigned reponsibility for this function. in i
l ;
1
addition, it is the responsibility of the QA section
' personnel to verify the housekeeping / cleanliness control requirements are being maintained according to established procedural requirements.
i 2.a INSERVICE INSPECTION PROGRAM (FULL LENGTH TUBE INSPECTIONS)
! NRC Comment: The Standard Technical Specifications (STS) and Regulatory Guide 1.83, Part C.2.f, currently define a U-tube inspection as meaning an inspection of the steam generator tube from the point of entry on the hot-leg side I
completely around the U-bend to the top support of the
- cold-leg side. The staff recommends that tube inspections i
should include an inspection of the entire length of the tube (tube end to tube end) including the hot leg side, U-bend, and cold leg side. -
This recommended action does not mean that the hot leg inspection sample and the cold leg inspection sample should necessarily involve the same tubes. That is, it does not preclude making separate entries from the hot and cold leg sides and selecting different tubes on the hot and cold leg sides to meet the minimum sampling requirements for inspection.
Consistent with the current STS requirement, supplemental
- sample inspections (after the initial 3% sample) under this staff recommended action may be limited to a partial length inspection provided the inspection includes those a portions of the tube length where degradation was found during initial sampling.
CPSES Response: Preservice baseline inspection of the steam generator 2
tubes was established by eddy current testing the full length of each tube.
Inservice eddy current tests will include an inspection of the entire length of the tube (tube end to tube end) including the hot leg side, U-bend and cold leg side consistent with the NRC staff's recommendation. The
! number and location of tubes selected will be consistent with the CPSES Technical Specifications. Tube selection will also take into account the modification made in the pre-heater region of the cold leg (i.e., 140 tubes were expanded in the baffle plates to reduce potential tube j vibrations). The potential for tube degradation is higher l in this region and will continue to be monitored during each scheduled inservice inspection.
The hot leg inspection sample and cold leg inspection j sample will normally be associated with the same tubes.
When tube location precludes the performance of " tube end to tube end" inspections, separate entries from the hot l
3
i <
i -
i i l and cold leg sides and selection of different tubes on the !
hot and cold leg sides to meet the minimum sampling [
requircents for inspection will be considered by l engineering on a case by case basis.
l 2.b INSERVICE INSPECTION PROGRAM (INSPECTION INTERVAL) r NRC Comment: The maximum allowable time between oddy current f inspections of an individual steam generator should be ;
limited in a manner consistent with Section 4.4.5.3 of the j
- Standard Technical Specifications, and in addition t.hould !
not extend beyond 72 months. ;
j CPSES Response: The CPSES Technical Specification limits for maximum
- allowable time between eddy current inspections of an
) individual steam generator are in agreement with the !
j Westinghouse Standard Technical Specifications (NUREG-0452 Revision 4). CPSES recognizes Section 4.4.5.3 of the ;
Standard Technical Specifications allows the time between i cddy current inspections of an individual steam generator 1 j to be extended beyond 72 months. At present. CPSES is l evaluating the inspection intervals between oddy current l i inspections of individual steam generators prescribed by i the Standard Technical Specifications. j i
3.a SECONDARY WATER CHEMISTRY PROGRAM ;
NRC Connent: Licensees and applicants shuuld have a secondary water l
- chemistry program (SWCP) to minimize steam generator tube !
! degradation.
l The specific plant program should incorporate the secondary water chemistry guidelines in SG0G Special 4
Report EPRl-NP-2704, "PWR Secondary Water Chemistry
- Guidelines", October 1982, and should address measures taken to minimize steam generator corrosion, including
- materials selection, chemistry limits, and control j methods.
1' CPSES Response: The CPSES program incorporates the secondary water l chemistry guidelines specified by the Steam Generators
- Owner Group in Special Report EPRI-NP-2104, "PWR Secondary i i Water Chemistry Guidelines", Revision 1, June 1984. The program addresses the chemistry control measures taken to establish limits for those parameters or control agents l Which are or could be detrimental to the construction ;
l ,
materials used in the steam generators and balance of i
! steam cycle components.
NRC Comnent: In addition, the specific plant procedures should include
, progressively more stringent corrective actions for out-J of-specification water chemistry conditions. These l l i f
t
{
i
I *
. l 2
i corrective actions should include power reductions and j shutdowns, as appropriate when excessively corrosive I conditions exist. l I
CPSES Response: The CPSES procedures are in agreement with the NRC l
- comments, providing progressively more stringent actions i for out-of-specification water chenistry conditions.
} Included in these actions are the appropriate power ,
reductions and shutdowns commensurate with the conditions, t i :
i NRC Connent: Specific functional individuals should be identified as j having the responsibility / authority to interpret plant
- water chemistry information and initiate appropriate plant 1 actions to adjust chemistry, as necessary.
I CPSES Response: The CPSES procedures identify the personnel responsible i for the interpretation of data as well as the personnel i
{ with authority to initiate corrective action. l t !
I t
j 3.b CONDENSER INSERVICE INSPECTION PROGRAM
- l l NRC Comment: Licensees should implement a condenser inservice !
, inspection program. The program should be defined in l
{ plant specific safety related procedures and include: !
- 1. Procedures to implement a condenser inservice
! inspection program that will be initiated if condenser 1 leakage is of such a magnitude that a power reduction j corrective action is required more than once por three l j month period; t
! CPSES Response: The incidence of condenser leakage is trended in j
] accordance with CPSES procedures, in the event that ,
i excessive tube leakage is identified, an engineering !
I evaluation is done to provide reconnended corrective ;
j actions. ;
\ l
! NRC Comment: 2. Identification and location of leakage source (s), l
} cither water or air; i CPSES Response: CPSES procedures are in place that provide instructions to
- Identify the chemistry control parameters and limits that l are adversely affected by air or water in-leakage. Onco '
- in leakage is determined, CPSES procedures provide i direction to locate the source of in leakage.
I i NRC Connent: 3. Methods of repair of leakage; !
l CPSES Response Methods of repair of leakage are determined from :
manuf acturer reconnendations and/or good mechanical l practice and are implemented by work requests and work ;
- orders.
l l )
l 6 j l !
4
. t
)1 NRC Comment: 4. Methodology for determining the cause(s) of leakage; CPSES Response: Appropriate plant individuals are identified in the CPSES I procedures with responsibility for reviewing data and j determining the cause(s) of in-leakage. ;
j NRC Comment: S. A preventative maintenance program, f
- , p
! CPSES Response: Present Preventative Maintenance (PM) guidelines reflect l that CPSES will schedule (1) shell examinations of all (
waterboxes every outage. (2) eddy current examination of ,
j 10% of tubes in each waterbox every other outage, and (3) t i eddy current examination of 100% of tubes in one waterbox every other outage. Such PM activities are implemented in ,
accordance with Preventative Maintenance Program 1 procedures.
l A design modification is being implemented to replace the i j main condenser copper nickel tubes with titanium modules.
ihe purpose of this modification is to reduce the copper ;
, content in the entire secondary system. The change out is ;
i scheduled to be complete by the end of the first refueling i i outage. Subsequent to the modification, the condenser PM i I program will be evaluated to determine its applicability l to the new design condenser due to the material upgrade !
Involved. !
I
- 4. PRIMARY TO SECONDARY LEAKAGE LIMIT l
! NRC Comment: All PWRs that have Technical Specification limits for !
- primary to secondary leakage rates which are less restrictive than the Standard Technical Specifications j (STS) limits should implement the STS limits. i i
- CPSES Response The CPSES Technical Specification limits for primary to !
! secondary leakage rates are in agreement with the [
- Westinghouse Standard Technical Specifications (NUREG 0452 ;
! Revision 4), f
- b. COOLANT 10 DINE ACTIVITY LIMIT t
! NRC Comment PWRs that have Technical Specification limits and >
I surveillance for coolant todino activity that are less
- restrictive than the Standard Technical Specifications t i (STS) should implemont tho STS limits. Those plant l identiflod above that also have low head high pressure i safoty injection pumps should olthers (1) implement fodino
- limits which are 20% of the STS valuos, or (2) implomont f reactor coolant pump trip critorld which will ensure that !
i if offsito power is rotained, no loss of forced roactor I coolant system flow will occur for steam generator tubo rupture ovents up to and including the design basis ,
i i !
6 j l
i t
i l t
double-ended break of a single steam generator tube, and
, implement iodine limits consistent with the STS.
i CPSES Response: The CPSES Technical Specification limits and surveillance L for coolant iodine activity are in agreement with the <
Westinghouse Standard Technical Specifications (NUREG-0452 i Revision 4),
I -
- 6. SAFETY INJECil0N SIGNAL RESET I l NRC Comment: The control logic associated with the safety injection f
) pump suction flow path should be reviewed and modified as i necessary, by licensees, to minimize the loss of safety !
sl function associated with safety injection reset during an SGTR event. Automatic switchover of safety injection pump I suction from the boric acid storage tanks (BAST) to the [
{ refueling water storage tanks should be evaluated with ;
j respect to whether the switchover should be made on the l j basis of low BAST level alone without consideration of the f
- condition of the 51 signal. [
i t
! CP5ES Response: The CPSES Safety injection (SI) pumps take suction [
- directly from the Refueling Water Storage Tank, in the
- presence of a Safety injection signal. There is no .
i suction path between the 51 pumps and the Doric Acid !'
- Storage Tanks; consequently, there is no need for changes to the control logic associated with tne $1 pumps.
r 1
L l
I i i
1
- i 1 ,
I l l l
l c
3 l {
I l i l
! 1 l r
i' l
COMANCHE PEAK STEAM ELECTRIC STATION RESPONSE TO GENERIC LETTER 85-02 l (ENCLOSURE 2)
RF0 VEST 'OR INFORMATION CONCERNING CATEGORY C-2 STEAM GENERATOR TUBE ,
d INSPI-NRL e oit: The enclosed draft NUREG-0844 Section 2.2.1.2 describes .
certain limitations which the staff believes to be I inherent in the present Technical Specification steam generator 151 requirements portaining to Category C-2 I inspection results. Licensees and applicants are f requested to provide a description of their current policy and actions relative to this issue and any recommendations '
they have concerning how existing Technical Specification steam generator 151 requirements portaining to Category l C-2 inspection results could be improved to better ensure (
that adequate inspections will be performed. This description should include a response tn the following l questions: j
- 1. What factors do, or would, the licensoo or applicant considor in dotormining (a) whether additional tubos should be inspected beyond what is required by the Technical Specifications, (b) whether all steam generators should bo included in the inspection ;
program, and (c) when the steam generators should bo ;
reinspectod? j
- 2. To what entent do those factors includo consideration of the degradation mechanism itself and its potential j for causing a tuDo to be vulnerable to rupture during {
severe transtonts or postulated accident before rupture !
Or lookage of that tubo occurs during normal operation?
CPSES Responso: Deing an applicant for an operating licenso CPSES has not !
performodsteamgeneratorinterviceinspectlonsthowever, !
the necessary programs, procedures and instructions are in !
place, and therefore, form the balls for datormining [
currentpoItcyrelativetothisissue. It should bo noted i that evolution of the current policy described in this f responso may occur based upon further evaluation, .
implementation foodback and additional input from !
applicable sourcos. !
If dofoctivo tubos are found, a failure analysis and !
disposition of the nonconforming condition would load CPSES plant personnol to contidoration of the following !
factors to dotormino whether actions such as those '
doscribed in question No. 1 are requirodt t r
- 1. Past inspection rotults and failuros (history trending) }
- 2. Industry expertonce '
i
.d.
l
- 3. Cause of failure (degradation method)
Performance of a failure analysis requires determination of appropriate action required to prevent a recurrence of the same failure (termination of the ability of a tube to perform its Intended function due to degradation). As a result, evaluation of the potential future offects of the degradation mechanism would encompass an evaluation of the current condition of the other uninspected tubes (refer to NRC question No. 2 above).
Currently, CPSES feels that the present Technical Specification steam generator 151 requirements pertaining to Category C-2 inspection results for the first sample inspection should be used. If the required second sample also yields a Category C-2 inspection result, then additional action should be considered.
( 9-I
-