TXX-3618, Forwards Analysis of Intermediate Cover Size 3 Inch,Type JHF,11 - Stage Pacific Pump Safety Injection Svc, Per 840414 10CFR50.55(e) Rept

From kanterella
Jump to navigation Jump to search
Forwards Analysis of Intermediate Cover Size 3 Inch,Type JHF,11 - Stage Pacific Pump Safety Injection Svc, Per 840414 10CFR50.55(e) Rept
ML20091P588
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/01/1983
From: John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Burwell S
Office of Nuclear Reactor Regulation
Shared Package
ML20091P591 List:
References
TXX-3618, NUDOCS 8406130107
Download: ML20091P588 (1)


Text

TEXAS UTILITIES SERVICES INC. Log # TXX-3618-wi mim rowen nau.asrexas 2n20i File # 10110 February 1, 1983 Mr. S. B. Burwell Licensing Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 PACIFIC PUMP MULTI-VANE DIFFUSER LINEAR INDICATIONS

Dear Mr. Burwell:

On April 14, 1982 Texas Utilities Generating Company verbally described a finding to the CPSES NRC resident inspector which was potentially reportable under 10 CFR 50.55(e). Subsequently, a meeting was held in Bethesda, on November 10, 1982 involving the NRC Staff, Texas Utilities, Westinghouse and Pacific Pumps for the purpose of presenting the results of an evaluation performed by Pacific Punps. At the meeting Texas Utilities committed to providing a report to the NRC containing the results of this evaluation.

Enclosed are five (5) copies of the Pacific Pumps report. Should you have any questions on this matter, please contact me directly.

Sincerely, J. S. Marshall

'BSD:tls Enclosures (i l' g18 p$l 1 4

sg6 8 _ _ gg74g, 68 3.M

~k 1 -

__ PR