Pages that link to "05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl"
Jump to navigation
Jump to search
The following pages link to 05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl:
Displayed 50 items.
- 05000336/LER-1998-020, Forwards LER 98-020-00 Re SI Recirculation Header Piping Components Not Fully Satisfying ISI Requirements IAW ASME Code Section XI Criterion.Commitments Made within Ltr Also Encl (← links)
- 05000423/LER-1998-038, Forwards LER 98-038-00 Re Manual Rt Due to High Conductivity in Condensate Sys on 980915.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-037, Forwards LER 98-037-00,re TS 3.0.3 Entry Due to Both SW Trains Declared Inoperable Following Failure of Check Valves Associated with Injection of Sodium Hypochlorite on 980910 & 18.Util Commitments Contained in Attachment 1 to (← links)
- 05000336/LER-1998-021, Forwards LER 98-021-00,documenting Condition That Was Discovered at Mnps,Unit 2,on 980825.Commitments Made by Util,Encl (← links)
- 05000336/LER-1998-019, Forwards LER 98-019-00,re Potential Inability to Close AFW Regulator Valves After Helb,Discovered on 980826.Util Commitments,Encl (← links)
- 05000336/LER-1998-018, Forwards LER 98-018-00,re Condition That Was Discovered at Millstone Unit 2 on 980818.Commitments Made by Util Also Encl (← links)
- 05000336/LER-1998-024, Forwards LER 98-024-00 Re 981030 Potential Leakage Path Through Containment Pressure Instrument.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-043, Forwards LER 98-043-00,re Manual Rt Due to High Conductivity in Condensate Sys.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-042, Forwards LER 98-042-00,re Licensing & Design Basis Review of Lpms Which Identified That TS Definition of Acot Was Not Met.Determined Event Reportable on 981020.Special Rept Dtd 980909,is Supplemented.Commitments Included in Att (← links)
- 05000336/LER-1998-023, Forwards LER 98-023-00,re Failure to Adequately Test Containment Air Recirculation Fans IAW TS SR 4.6.2.1.2(a) on 980924.LER Submitted Beyond 30-day Discovery Time Period. Licensee Commitments Also Included (← links)
- 05000423/LER-1998-041, Forwards LER 98-041-00,re Failure to Enter Action Statement for Inoperable SG Water Level Channel IAW TSs on 981016. Commitments Made by Util Also Encl (← links)
- 05000423/LER-1998-040, Forwards LER 98-040-00,documenting Condition That Was Determined Reportable on 981017.Attachment 1 Contains Commitments Made in Response to Event (← links)
- 05000423/LER-1998-039, Forwards LER 98-039-00,documenting Event That Occurred on 981001 at Millstone Unit 3.Commitments Made by Util,Encl (← links)
- 05000336/LER-1998-002, Forwards LER 98-002-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980109,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1998-001, Forwards LER 98-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980108.LER Being Submitted Per 10CFR50.73(a)(2)(ii) Requirements. Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1998-025, Forwards LER 98-025-00,documenting Condition Discovered at Mnps,Unit 2,on 981111.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-045, Forwards LER 98-045-00,re Rt Due to MSIV Closure During Partial Stroke Testing Due to Solenoid Valve Failure on 981211.Commitments,encl (← links)
- 05000336/LER-1998-017, Forwards LER 98-017-01,re Fire Protection Program Deficiencies That Were Discovered on 980812.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-022, Forwards LER 98-022-01 Re AFW DC Power Supply Failure That Was Not Considered in Safety Analysis on 980910.Commitments Made in Ltr Encl (← links)
- 05000423/LER-1998-044, Forwards LER 98-044-00,re Rt Due to High Differential Pressure Between a & B Condensers on 981111.Util Commitments in Response to Event Contained within Attachment 1 of Ltr (← links)
- ML20203A791 (redirect page) (← links)
- 05000245/LER-1998-001 (redirect page) (← links)
- 05000245/LER-1996-063, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted (← links)
- 05000245/LER-1997-003, Forwards LER 97-003-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970306,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-017, Submits List of Commitments Re LER 97-017-00 Re Event on 970222 (← links)
- 05000245/LER-1997-021, Forwards LER 97-021-00,documenting Event Occurred at Unit 1 on 970228.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1997-020, Forwards LER 97-020-00,documenting Event Occurred at Unit 1 on 970227.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1997-018, Forwards LER 97-018-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970224.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-011, Forwards LER 97-011-00,documenting Event Occurred at Unit 1 on 970214.Commitment Made within Ltr Submitted as Listed (← links)
- 05000245/LER-1997-010, Forwards LER 97-010-00,documenting Event Occurred at Unit 1 on 970214.Commitments Made within Ltr Submitted as Listed (← links)
- 05000245/LER-1996-020, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated (← links)
- 05000245/LER-1997-009, Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-012, Provides List of Commitments Made Re LER 97-012-00 (← links)
- 05000245/LER-1996-037, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) (← links)
- 05000245/LER-1997-025, Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1979-036, Forwards LER 79-036/03L-0 (← links)
- 05000245/LER-1978-021, Forwards LER 78-021/03L-0 (← links)
- 05000245/LER-1997-013, Forwards LER 97-013-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-028, Forwards LER 97-028-00 Which Documents an Event That Occurred on 970424.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-027, Forwards LER 97-027-00 Per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr (← links)
- 05000245/LER-1996-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr (← links)
- 05000245/LER-1997-026, Forwards LER 97-026-00 Per 10CFR50.73(a)(2)(ii).Also Includes Commitments Made in Ltr (← links)
- 05000245/LER-1996-054, Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date (← links)
- 05000245/LER-1997-029, Forwards LER 97-029-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970513.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-024, Forwards LER 97-024-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970409.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-046, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed (← links)
- 05000245/LER-1997-006, Forwards LER 97-006-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 1 on 970131, Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed (← links)
- 05000245/LER-1997-007, Forwards LER 97-007-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970131,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii). Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-008, Forwards LER 97-008-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970203,per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1994-020, Forwards LER 94-020-01 Which Documents Event That Occurred on 940527,per 10CFR50.73(a)(2)(ii).Commitments,listed (← links)
- 05000245/LER-1997-004, Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr (← links)
- 05000245/LER-1997-005, Forwards LER 97-005-01,documenting Closure of Commitment B16236-2 & B16236-3,including Commitments Made within Ltr (← links)
- 05000245/LER-1997-016, Forwards LER 97-016-00,which Documents an Event That Occurred at Mnps,Unit 1 on 970401.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1997-019, Forwards LER 97-019-00 Which Documents Event That Occurred at Mnps,Unit 1 on 970326.Commitments Made within Ltr, Submitted (← links)
- 05000245/LER-1997-015, Forwards LER 97-015-00,documenting Event at Plant on 970321 & Licensee Commitments (← links)
- 05000245/LER-1996-055, Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted (← links)
- 05000245/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed (← links)
- 05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement (← links)
- 05000245/LER-1996-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-049, Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed (← links)
- 05000245/LER-1996-003, Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted (← links)
- 05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted (← links)
- 05000245/LER-1996-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident (← links)
- 05000245/LER-1996-060, Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed (← links)
- 05000245/LER-1996-061, Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode (← links)
- 05000245/LER-1995-008, Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted (← links)
- 05000245/LER-1996-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed (← links)
- 05000245/LER-1996-051, Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis (← links)
- 05000245/LER-1996-031, Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16 (← links)
- 05000245/LER-1996-059, Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements (← links)
- 05000245/LER-1996-057, Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 961230 (← links)
- 05000245/LER-1997-023, Forwards LER 97-023-00 Per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Submitted (← links)
- 05000245/LER-1997-039, Forwards LER 97-039-00,documenting Event That Occurred at Facility on 971031.Commitments Made by Util Listed (← links)
- 05000245/LER-1997-038, Forwards LER 97-038-00,documenting Event That Occurred at Plant,Unit 1 on 971008,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr Submitted (← links)
- 05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl (← links)
- 05000245/LER-1997-040, Forwards LER 97-040-00,documenting an Event That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 971103.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1993-011, Responds to NRC 981002 Request to Counsel That NNECO Waive Any Assertion of Statue of Limitations for 60-90 Days with Respect to NRC Ability to Initiate Civil Penalty Action Based on Apparent Violation of 10CFR50.59 Re LER 93-0 (← links)
- 05000245/LER-1997-037, Forwards LER 97-037-00,documenting Event Which Occurred on 970930 at Millstone Nuclear Power Station,Unit 1.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-022, Forwards LER 97-022-01,documenting Event That Occurred at Unit 1 on 971001.Commitments Made within Ltr,Listed.All Other Statements Made within Ltr for Info Only (← links)
- 05000245/LER-1996-023, Forwards LER 96-023-01,documenting Condition Discovered at Millstone,Unit 1 on 960306.Attachment 1 Contains Commitments Made within Ltr (← links)
- 05000245/LER-1998-005, Forwards LER 98-005-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 980330.LER Being Submitted Per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-014, Forwards Suppl LER 97-014-02,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Rept Includes Addl Deficiencies in IST Program That Have Been Identified as Reportable (← links)
- 05000245/LER-1997-031, Forwards LER 97-031-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970730.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1997-036, Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1996-066, Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments (← links)
- 05000245/LER-1998-002, Forwards LER 98-002-00,documenting Condition That Was Discovered at Millstone,Unit 1 on 980211.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-033, Forwards LER 97-033-00,documenting Event That Occurred at Unit 1 on 970801.Commitment Listed (← links)
- 05000245/LER-1997-032, Forwards LER 97-032-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970731,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-039, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided (← links)
- 05000245/LER-1998-004, Forwards LER 98-004-00,documenting Condition That Was Discovered at Unit 1 on 980311.Util Commitments Made within Rept,Encl (← links)
- 05000245/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided (← links)
- 05000245/LER-1995-033, Forwards LER 95-033-02,documenting Event That Occurred at Unit 1 on 950623.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-034, Forwards LER 97-034-00 Documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970812.Listed Commitments Made within Ltr (← links)
- 05000245/LER-1997-030, Forwards LER 97-030-00,documenting Event That Occurred at Unit 1 on 970724.Util Commitments Made within Ltr Listed (← links)
- 05000245/LER-1996-035, Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug (← links)
- 05000245/LER-1982-014, Forwards LER 82-014/03L-0.Detailed Event Analysis Encl (← links)
- 05000245/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis Encl (← links)
- 05000245/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Encl (← links)
- 05000245/LER-1993-006, Forwards Updated LER 93-006-01 Which Was Previously Submitted W/O Rev Bars (← links)
- 05000245/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl (← links)
- 05000423/LER-1998-004, Forwards LER 98-004-00,re Event Which Occurred at Millstone Unit 3 on 980114.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-005, Forwards LER 98-005-00,documenting Condition That Was Determined to Be Reportable at Millstone,Unit 3 on 980116. Commitments Made by Ltr,Listed (← links)
- 05000423/LER-1998-001, Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-003, Forwards LER 98-003-00,documenting Condition That Was Determined to Be Reportable at Millstone Nuclear Power Station,Unit 3 on 980114.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-026, Forwards LER 98-026-00,re Exceeded Pressurizer Spray Line Fatigue Limits Due to Insufficient Thermal Effects Analysis. Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-012, Forwards LER 98-012-01,documenting Addl Info Pertaining to Condition That Was Determined Reportable on 980218. Attachment 1 Contains Commitments in Response to Event (← links)
- 05000336/LER-1998-005, Forwards LER 98-005-01 Re HELB Deficiencies for Piping Inside Containment on 980318.Commitments,encl (← links)
- 05000423/LER-1998-036, Forwards LER 98-036-00,which Discusses ESF Bldg Sump Pump Design Deficiencies.Commitments Made in Rept,Encl (← links)
- 05000336/LER-1998-016, Forwards LER 98-016-00,which Discusses Inadequate Administrative Controls on Safety Injection Valve. Commitments Made within Rept,Encl (← links)
- 05000423/LER-1998-031, Forwards LER 98-031-00,re Event Which Was Determined Reportable on 980526.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-013, Forwards LER 98-013-00,re Event Which Occurred at Millstone Unit 2 on 980526.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-009, Forwards Revised Commitments Contained in LER 98-009-00 for Mnps,Unit 3, Containment Radiation Monitor CMS*22 Setpoints Non-Conservative W/Respect to Conforming W/Commitments Made to Reg Guide 1.45 within Fsar (← links)
- 05000336/LER-1998-012, Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-011, Forwards LER 98-011-00,documenting Event That Occurred at Unit 2 on 980502.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000423/LER-1998-030, Forwards LER 98-030-00,documenting Condition Determined Reportable at Mnps,Unit 3,on 980515.Commitments Made by Util Are Contained in Attachment 1 to Ltr (← links)
- 05000423/LER-1998-028, Forwards LER 98-028-00,documenting Condition Determined Reportable at Unit 3 on 980513.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-029, Forwards LER 98-029-00,supplementary Leak Collection & Release Sys Bypass Leakage May Result in Unaccounted Control Room & TSC Doses.Attachment 1 Contains Commitments Made in Ltr (← links)
- 05000336/LER-1998-010, Forwards LER 98-010-00,documenting Event That Occurred at Unit 2 on 980508.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1998-009, Forwards LER 98-009-00,documenting Event Which Occurred at Millstone Unit 3 on 980501.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-025, Forwards LER 98-025-00,documenting Event at Millstone Unit 3 on 980427,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-008, Forwards LER 98-008-00,re Event Which Occurred at Millstone Unit 2,on 980423,per 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-007, Forwards Corrected LER 98-007-00,documenting Event Which Occurred at Millstone Unit 2 on 980408.LER Is Being Resubmitted Due to Omission of Rept Date on Original Submittal.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-002, Informs of Revised Completion Date to Complete Commitment Contained in LER 98-002-00, Verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Not Being Met. New Commitment Made by Util,Encl (← links)
- 05000423/LER-1998-016, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-022, Forwards LER 98-022-00,documenting Condition That Determined Reportable at Millstone Unit 3 on 980408.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-023, Forwards LER 98-023-00,documenting Condition That Determined Reportable at Millstone Unit 3 on 980411.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-024, Forwards LER 98-024-00, Failure to Complete Action Associated W/Ts 4/3.3.1 within Required Time Period. Commitments Made by Util,Encl (← links)
- 05000245/LER-1998-005, Forwards LER 98-005-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 980330.LER Being Submitted Per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed (← links)