Part 21 Rept Re Potential Defect in Engine Generator Control Panels of Dsr or DSRV-16 Standby Diesel Generator.Review of Generator Control Panel Installation by Each Facility Recommended
ML20127H541
Person / Time
Site: Catawba, Grand Gulf, River Bend, Vogtle, Comanche Peak, Rancho Seco, Bellefonte, 05000000, Washington Public Power Supply System, Shoreham
Issue date: 05/17/1985
From: Boyer R
TRANSAMERICA DELAVAL, INC.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-85 130, NUDOCS 8505210323
Download: ML20127H541 (5)


Text

,V*

Transamenoa

&"'*'"a"as;",','",Loio, gglgggl 550 85th Av;nus P.O. Boy 216' Oakland, California 94621 (415) 577 7400

  1. 130 May 17, 1985 Director, Office of Inspection & Fnforcement U.S. Nuclear Regulatory Comission Washington, D.C.

20555

Dear Sir:

In accordance with the requirments of Title 10, Chapter 10, Code of Federal Regulations, Part 21, Transamerica Delaval Inc., hereby notifies the Comission of a potential defect in a ccxnpanent of a DSR or DSRV-16 Standby Diesel Generator. There exists a potential problem with the Engine Generator Control Panel which could result in Engine non-availability.

Transamerica Delaval has supolied the DSR and DSRV Engines with the potential defect to the following utilities:

Utility Site Serial No.

Model Long Island Lighting Shoreham 74010/12 DSR 48 Middle South Energy Grand Gulf 74033/36 DSRV 16 Gulf States Utilities River Bend 74039/40 DSR 48 Duke Power Ccxnpany Catawba 75017/20 DSRV 16 Texas Utilities Services Comanche Peak 76001/04 DSRV 16 Georgia Power Vogtle 76021/24 DSRV 16 TVA Bellefante 75080/83 DSRV 16 Washington Public Power WPPSS 1 75084/85 DSRV 16 Washington Public Power WPPSS 4 76031/32 DSRV 16 SMUD Rancho Seco 81015/16 DSR 48 8505210323 850517 4

/> @ 1

$DR ADOCK 05000312 PDR

\\

1

Transamenoa Delaval T

Page 2 May 17, 1985 U.S. Nuclear Regulatory Conmission he Engine Generator Control Panels were purchased by Transamerica Delaval fr a RIE DELTA of Stockton, California. Some of the cm-ponents were furnished by the Generator Manufacturer (NEI Peeples-Electric Products, Inc. of Cleveland, Ohio) for installation in the Generator Control Panel'by RTE DELTA.

We potential problem with the Control Panel is overheating, which could lead to failure of some components.

We reconmend that each Site review their Generator Control Panel installation for this potential problem.

If this review indicates the problem exists, changes made to the installation may solve the overheating situation. Reducing the j

anbient tenperature, operating with the doors open, or other things which will reduce heat rise are suggested.

In the event that it is not possible to eliminate the problan by site changes, fan assenblies for inproved ventilation can be in-stalled in the cabinets. L e installation of forced ventilation has been reviewed by our Engineering Department and the Control Panel Manufacturer. We design for forced ventilation is couplete.

If required, we will furnish all material, instructions and service on request, to complete this revision in accordance with each individual contract.

A copy of this letter will be sent to each site listed in paragraph l

2 as shown by the cc's.

Our evaluation of this untter was completed on May 16, 1985.

Since correction of this potential defect depends on action by others, we cannot estiaate whm the action will be complete.

Very truly yoors, g l2)

R. E. Boyer Manager, Quality Assurance REB:hw Enclosure

Transamenoa Delaval T

Page 3 i

Date May 17, 1985 U.S. Nuclear Regulatory enmd=sion Y

OC:

Izmig Island Lighting Co.

Shoreham Nuclear Power Station l

North Country Rd.

l Wading River, New York 11791 Attention: Mr. M. H. M4114gmi l

Project Engine Middle So. Energy - Grand Gulf P.O. Box 1640 (l

Jackson, Mississippi 39205 I

Attention: Mr. J. B. Richard Sr. Vice-Pres. Ncclear Production o

Oulf States Utilities Co.

Stone & Webster Eng. Co.

[

Cherry Hill Operations Center 3 Executive Campus P.O. Box 5200 j

G erry Hill, New Jersey 08034 I

Attestion: Project Manager (J.O. No. 12210)

Gulf States Project t

l t

t i

fa r

2 Duke Power - Catawba Mill Power Supply Co.

P.O. Box 32307 m arlotte, North Carolina 28232 Attentions W. T. Robertson, President

Transamenca Delaval

'E il Page 4 Date May 17, 1985 U. S. Nuclear Regulatory C h asion CC: (continued)

Sacramento Mmicipal Utility Dist.

L. R. Keilman Nuclear Engineering Dept., M.S. 32 P.O. Bat 15830 Sacramento, CA 95813 Mr. George Bockhold, Jr.

Plant Manager Georgia Power Co.

q Plant Vogtle P.O. Bat 282 Wayensboro, Georgia 30830 Sacramento Mmicipal Utility Dist.

J. R. Beal Purchasing Department, M.S.

50 P.O. BaK 15830 l

Sacramento, CA 95813

Transamenoa Delaval T

Page 5 m

t Date May 17, 1985 U. S. Nuclear Regulatory Comission t

(E: (conthmed) s L

(IVA - Bellefonte)

W. C. A. Chandley Tennessee Valley Authority W7C126, 400 West Sumit Hill Dr.

Knoxville, Tenn. 37902 Attention:

&. I. L. Beltz

&. G. K. Dyekman, Acting Assistant Program Director - Engineering (899)

Washington Public Power Supply System Post Office Bett 460 Richland, Wash. 99352 (Call Vince Dilworth for i that will go with 10CFR21)

Texas Utilities Services Inc.

r P.O. Bax 2300 Glen Rose, Texas 76043 i

Attention: W. J. T. Merritt, Jr.

f Engineering & Construction W.

Georgia Power Bechtel Power Corp.

Ios Angeles Power Div.

P.O. Box 60860, Terminal Annex Bldg.

Ios Angeles, Ca. 90%0 Attention: Mr. M. Maler Project Engir.

'Mgr.

u