PNO-III-86-030, on 860325,while Conducting Hft,Two Main Steam Line Pipe Supports in Steam Tunnel Failed as Result of Apparent Water Hammer.State of Il Notified

From kanterella
Jump to navigation Jump to search
PNO-III-86-030:on 860325,while Conducting Hft,Two Main Steam Line Pipe Supports in Steam Tunnel Failed as Result of Apparent Water Hammer.State of Il Notified
ML20212E857
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 03/26/1986
From: Gardner R, Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-86-030, PNO-III-86-30, NUDOCS 9711040086
Download: ML20212E857 (1)


-PREllNINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE NO 11-86-34 Date March 26, 1986-X- This prelidnary. notification constitutes 'EARLY notice-of events of POSSIBLE safety:

f( p~or'public interest-significance. -The.infontation is as initially received without r verification or evaluation, and is basicall) ell that is known by the Aegion III staff on this date.

facility
Comonwealth Edison Company ~ ~

Licensee Emergency Classification:

Braidwood Unit 1 Notification of an Unusual Event Braceville, IL 60407 Alert

_ . Site Area Emergency Docket No: 50-456- General Emergency XX ' Not ' Applicable

Subject:

WATER HAMMER DAMAGES PIPE SUPPORTS PUtLIC DOCUMENT FCCM At:7:30p.m.(CST), March 25, 1986, while conducting hot functional testing (HFT),

two main steam line pipe supp s thpp sWyN9pnnel failed as the result of an apparent

, water hamer. Both the pipe s o erfd the Yt'eam lines are outside containment and considered non-safety related. Damage occurred during a rapid depressurization of main

' steam line "B" when steam was dtypqtdef0095the main condensor via the main steam bypass valve. The water hamer, which 'foflowed, may have been caused by pipe configuration.

l The' steam line dropped about seven inches below normal as a result of. the failed supports.

There was.no apparent damage to the steam line itself. :The licensee has replaced the supports and impounded the damaged corrponents for further analysis. The HFT will not.

continue until the analysis is complete.

, -Region III (Chicago) and the resident inspectors are following the licensee's course of

-/ m\ action.-.

The State of Illinois will be notified.

Region 1 III-was first notified of this event at 8 a.m. (CST), March 26, 1986. This

.information is current as of 4 p.m. (CST), March 26, 1986.

CONTACT: .'R. Gardner .W. Little FTS 388-5524 .FTS 388-5578- )

i 4 -

p DISTRIBUTION:

0@'

H.:St. E00 NRR- E/W Willste~ Mail: ADM:DMB Chairman Palladino PA IE NMSS DOT:Trans only Com. Zech ELD OIA RES .

Com. Bernthal AE00 Comm.- Roberts Comm Asselstine SP Regional Offices ACRS .

SECY INPO NSAC P

.CA Rill Resident 0ffice POR . Licensee- (Corp. Office - Reactor Lic. Only) k ,)-

~'-

r,

\

yod Region III Rev. November 1985 Chm, Cmrs, C/R Distribution:

PE, GC, CA, ACRS, Historian, SECY,: Records.

97110W)S6 860326 PDR ISE PNO-III-86-030 PDR .)