 Issue dateTitleTopic
PNO-III-98-013, on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration29 January 1998PNO-III-98-013:on 980126,turbine Tripped Causing Subsequent Reactor Trip.Cause of Turbine Trip Remains Under Investigation.Appears Replacement Circuit Board Had Incorrect Electronic Configuration
PNO-III-97-071, on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes3 September 1997PNO-III-97-071:on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes
PNO-III-94-086, on 941103,near End of Operability Test for 2B Emergency Diesel Generator Master Rod in Diesel Failed Resulting in Significant Internal Damage to 1L & 1R Cylinders7 November 1994PNO-III-94-086:on 941103,near End of Operability Test for 2B Emergency Diesel Generator Master Rod in Diesel Failed Resulting in Significant Internal Damage to 1L & 1R Cylinders
PNO-III-94-013, on 940308,contract Worker Was Injured When He Fell Into Blowdown Demineralizer Vault.Worker Was Transported in Ambulance to Area Hosp in Serious Condition9 March 1994PNO-III-94-013:on 940308,contract Worker Was Injured When He Fell Into Blowdown Demineralizer Vault.Worker Was Transported in Ambulance to Area Hosp in Serious Condition
PNO-III-93-061, on 931023,licensee Commenced Shutdown of Unit 1 Due to Indications of Primary to Secondary Leak in SG 1C. Shutdown Completed on 931025.State of Il Notified25 October 1993PNO-III-93-061:on 931023,licensee Commenced Shutdown of Unit 1 Due to Indications of Primary to Secondary Leak in SG 1C. Shutdown Completed on 931025.State of Il Notified
PNO-III-93-057, on 931003,reactor Tripped Due to Low Steam Generator Level.Feedwater Regulating Valve for D Steam Generator Had Failed in Fully Closed Position Due to Failed Positioner.State of Il Notified4 October 1993PNO-III-93-057:on 931003,reactor Tripped Due to Low Steam Generator Level.Feedwater Regulating Valve for D Steam Generator Had Failed in Fully Closed Position Due to Failed Positioner.State of Il Notified
PNO-III-92-056, on 921015,licensee Reported Discovery of Evidence of Vandalism in Upper Cable Spreading Room,Shared by Both Units,Caused by Contractor Employee Who Performed Firewatch Duties.Employee Site Access Suspended16 October 1992PNO-III-92-056:on 921015,licensee Reported Discovery of Evidence of Vandalism in Upper Cable Spreading Room,Shared by Both Units,Caused by Contractor Employee Who Performed Firewatch Duties.Employee Site Access Suspended
PNO-III-90-055, on 900801,unit Shut Down to Repair Check Valve 1A Essential Svc Water Pump.Caused by Failure of Pump Discharge Check Valve to Seat.Check Valve Will Be Replaced8 August 1990PNO-III-90-055:on 900801,unit Shut Down to Repair Check Valve 1A Essential Svc Water Pump.Caused by Failure of Pump Discharge Check Valve to Seat.Check Valve Will Be Replaced
PNO-III-89-047, on 890718,rod Control Sys Lost Power,Dropping Control Rods Into Reactors.Caused by Lightning Strikes.Power Supplies Reset & Rod Control Sys Operating Normally.Licensee Plans to Restart Both Units on 89071919 July 1989PNO-III-89-047:on 890718,rod Control Sys Lost Power,Dropping Control Rods Into Reactors.Caused by Lightning Strikes.Power Supplies Reset & Rod Control Sys Operating Normally.Licensee Plans to Restart Both Units on 890719
PNO-III-89-029A, on 890425,Augmented Insp Team Began Insp at Plant in Response to NRC Observations of Two Employees Appearing Inattentive to Duty.Licensee Reestablished Shift Overview Superintendent Position to Provide Mgt Visibility28 April 1989PNO-III-89-029A:on 890425,Augmented Insp Team Began Insp at Plant in Response to NRC Observations of Two Employees Appearing Inattentive to Duty.Licensee Reestablished Shift Overview Superintendent Position to Provide Mgt Visibility
PNO-III-89-031, on 890423,licensee Shutdown Reactor Because Instrument Power Supply Was Found to Be Inoperable on 970422.Caused by Faulty Capacitor & Inverter Repaired & Returned to Svc on 89042525 April 1989PNO-III-89-031:on 890423,licensee Shutdown Reactor Because Instrument Power Supply Was Found to Be Inoperable on 970422.Caused by Faulty Capacitor & Inverter Repaired & Returned to Svc on 890425
PNO-III-89-029, on 890418,Region III Operator Licensing Examiner Observed Individual with Eyes Closed in Chair in Unit 1 Cr.On 890419,licensing Examiner Observed Radiation Control Technician Asleep at Desk by RCA at Building Exit24 April 1989PNO-III-89-029:on 890418,Region III Operator Licensing Examiner Observed Individual with Eyes Closed in Chair in Unit 1 Cr.On 890419,licensing Examiner Observed Radiation Control Technician Asleep at Desk by RCA at Building ExitInattentive
PNO-III-89-025, on 890411,main Turbine Tripped by Licensee. Reactor Shut Down for Repairs on Already Malfunctioning Main Turbine Governor Valve.Unit Expected to Return to Svc on 890416.State of Il to Be Notified11 April 1989PNO-III-89-025:on 890411,main Turbine Tripped by Licensee. Reactor Shut Down for Repairs on Already Malfunctioning Main Turbine Governor Valve.Unit Expected to Return to Svc on 890416.State of Il to Be Notified
PNO-III-88-094, on 881115,discovered Joint in 4-inch Instrument Air Line Damaged & Causing Loss of Pressure in Compressed Air Sys.Air Line Joint Probably Stepped on by Painter Working in Area16 November 1988PNO-III-88-094:on 881115,discovered Joint in 4-inch Instrument Air Line Damaged & Causing Loss of Pressure in Compressed Air Sys.Air Line Joint Probably Stepped on by Painter Working in Area
PNO-III-88-088, on 881025,unit Manually Tripped from 28% Power to Avoid Challenging Reactor Protection Sys.Caused by Low Steam Generator Water Levels.Unit Expected to Be Down from Five to Seven Days While Strainers Cleaned26 October 1988PNO-III-88-088:on 881025,unit Manually Tripped from 28% Power to Avoid Challenging Reactor Protection Sys.Caused by Low Steam Generator Water Levels.Unit Expected to Be Down from Five to Seven Days While Strainers Cleaned
PNO-III-88-086, on 881016,reactor Automatically Shut Down Following Loss of Offsite power.Diesel-driven Auxiliary Feedwater Pumps Maintained Steam Generator Level.Caused by Explosion & Fire in Substation & Carboard in Delay Relay18 October 1988PNO-III-88-086:on 881016,reactor Automatically Shut Down Following Loss of Offsite power.Diesel-driven Auxiliary Feedwater Pumps Maintained Steam Generator Level.Caused by Explosion & Fire in Substation & Carboard in Delay Relay
PNO-III-88-048, on 880520,full Power OL Issued.Currently at 8% Power,Licensee Engaged in Power Ascension Activities. NRR Region IV Will Provide Augmented Insp Coverage of Power Ascension23 May 1988PNO-III-88-048:on 880520,full Power OL Issued.Currently at 8% Power,Licensee Engaged in Power Ascension Activities. NRR Region IV Will Provide Augmented Insp Coverage of Power Ascension
PNO-III-88-026, on 880323,licensee Began Orderly Shutdown of Unit 1 Due to Identified Deficiencies in Lubricant Used in motor-operated Limitorque Valves.Deficiencies Apply to 263 safety-related Valves in Both Units 1 & 224 March 1988PNO-III-88-026:on 880323,licensee Began Orderly Shutdown of Unit 1 Due to Identified Deficiencies in Lubricant Used in motor-operated Limitorque Valves.Deficiencies Apply to 263 safety-related Valves in Both Units 1 & 2
PNO-III-88-017, on 880308,unit Achieved Initial Criticality. Conditions at Criticality as Expected.Nrc Inspectors Monitored Preparation for Criticality.Ol Permitting Fuel Loading & Low Power Testing Issued on 8712188 March 1988PNO-III-88-017:on 880308,unit Achieved Initial Criticality. Conditions at Criticality as Expected.Nrc Inspectors Monitored Preparation for Criticality.Ol Permitting Fuel Loading & Low Power Testing Issued on 871218
PNO-III-87-154, on 871218,OL Issued to Facility to Permit Fuel Loading & Operation Up to 5% Power.Fuel Loading Scheduled for 871221.Initial Criticality Planned for Feb 198821 December 1987PNO-III-87-154:on 871218,OL Issued to Facility to Permit Fuel Loading & Operation Up to 5% Power.Fuel Loading Scheduled for 871221.Initial Criticality Planned for Feb 1988
PNO-III-87-155, on 871220,fire Damaged Const Warehouse Outside Protected Area.Cause Under Investigation.Fire Did Not Affect Plant Operations.Local Fire Depts Summoned21 December 1987PNO-III-87-155:on 871220,fire Damaged Const Warehouse Outside Protected Area.Cause Under Investigation.Fire Did Not Affect Plant Operations.Local Fire Depts Summoned
PNO-III-87-099, on 870717,licensee Declared Diesel Generator 1B Inoperable Following Monthly Surveillance Test.Licensee Unable to Maintain Min Load of 5,500 Kw Per Tech Specs Due to Output Swings.Unit Shut Down in Excess of 48 H21 July 1987PNO-III-87-099:on 870717,licensee Declared Diesel Generator 1B Inoperable Following Monthly Surveillance Test.Licensee Unable to Maintain Min Load of 5,500 Kw Per Tech Specs Due to Output Swings.Unit Shut Down in Excess of 48 H
PNO-III-87-092, on 870702,util Issued full-power Operating License for Unit 1.State of Il to Be Notified.Unit 2 Under Const & 97% Complete2 July 1987PNO-III-87-092:on 870702,util Issued full-power Operating License for Unit 1.State of Il to Be Notified.Unit 2 Under Const & 97% Complete
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
PNO-III-87-080, on 870529,reactor Achieved Initial Criticality.Ol Issued on 861017,authorizing Fuel Load & Subcritical Testing.Preparation for & Achievement of Initial Criticality Monitored by Resident Inspectors1 June 1987PNO-III-87-080:on 870529,reactor Achieved Initial Criticality.Ol Issued on 861017,authorizing Fuel Load & Subcritical Testing.Preparation for & Achievement of Initial Criticality Monitored by Resident Inspectors
PNO-III-87-049, on 870408,handgun Found on Contract Employee During Walk Through Metal Detector at Entrance to Protected Area.Incident Under Investigation.Individual Has Access to All Vital Areas in Plant Except for Central Alarm Station8 April 1987PNO-III-87-049:on 870408,handgun Found on Contract Employee During Walk Through Metal Detector at Entrance to Protected Area.Incident Under Investigation.Individual Has Access to All Vital Areas in Plant Except for Central Alarm Station
PNO-III-87-047, on 870329,failure of Rocker Arm on Emergency Diesel Generator 2B Number 5 Right Cylinder Occurred. Concurrent Metallurgical Analyses Being Conducted to Determine Cause of Event2 April 1987PNO-III-87-047:on 870329,failure of Rocker Arm on Emergency Diesel Generator 2B Number 5 Right Cylinder Occurred. Concurrent Metallurgical Analyses Being Conducted to Determine Cause of Event
PNO-III-87-020, on 870204,lubricating Oil & Fuel Leaks Detected During 24 H Test Run of Emergency Diesel Generator. Caused by Interference Between Cross Head & Cross Head Guide.Steps to Ensure Correct Clearance Being Taken6 February 1987PNO-III-87-020:on 870204,lubricating Oil & Fuel Leaks Detected During 24 H Test Run of Emergency Diesel Generator. Caused by Interference Between Cross Head & Cross Head Guide.Steps to Ensure Correct Clearance Being Taken
PNO-III-87-010, on 870121,both Component Cooling Water Pumps Tripped in Succession Rendering Sys Inoperable.Initial Cause Due to Low Surge Tank Flow.Cause of Low Flow Under Investigation.Operability Restored by Restoring Flow Level,22 January 1987PNO-III-87-010:on 870121,both Component Cooling Water Pumps Tripped in Succession Rendering Sys Inoperable.Initial Cause Due to Low Surge Tank Flow.Cause of Low Flow Under Investigation.Operability Restored by Restoring Flow Level,
PNO-III-86-126, on 861101,anonymous Male Caller Telephoned Plant Security Ofc Claiming Bomb Had Been Planted in Auxiliary Bldg.Auxiliary Bldg Evacuated Except for Firewatch & Security Personnel & Search Conducted.No Bomb Found3 November 1986PNO-III-86-126:on 861101,anonymous Male Caller Telephoned Plant Security Ofc Claiming Bomb Had Been Planted in Auxiliary Bldg.Auxiliary Bldg Evacuated Except for Firewatch & Security Personnel & Search Conducted.No Bomb Found
PNO-III-86-117, on 861017,operating License Issued to Commonwealth Edison Co for Braidwood Nuclear Power Station, Unit 1.License Limited to Fuel Loading & Initial Testing Activities Leading to Criticality17 October 1986PNO-III-86-117:on 861017,operating License Issued to Commonwealth Edison Co for Braidwood Nuclear Power Station, Unit 1.License Limited to Fuel Loading & Initial Testing Activities Leading to Criticality
PNO-III-86-101, on 860918,ASLB Issued Memorandum & Order Authorizing NRR to Issue Limited License to Util for Fuel Loading & Precriticality Testing.Fuel Loading Expected on 86101519 September 1986PNO-III-86-101:on 860918,ASLB Issued Memorandum & Order Authorizing NRR to Issue Limited License to Util for Fuel Loading & Precriticality Testing.Fuel Loading Expected on 861015
PNO-III-86-053, on 860604,pressurizer Relief Tank Overpressurized W/Pure Water Bursting Rupture Diaphragm. Caused by Incorrect Valve Lineup During Testing Leak Detection Sys.Contractor Employees Injured5 June 1986PNO-III-86-053:on 860604,pressurizer Relief Tank Overpressurized W/Pure Water Bursting Rupture Diaphragm. Caused by Incorrect Valve Lineup During Testing Leak Detection Sys.Contractor Employees Injured
PNO-III-86-030, on 860325,while Conducting Hft,Two Main Steam Line Pipe Supports in Steam Tunnel Failed as Result of Apparent Water Hammer.State of Il Notified26 March 1986PNO-III-86-030:on 860325,while Conducting Hft,Two Main Steam Line Pipe Supports in Steam Tunnel Failed as Result of Apparent Water Hammer.State of Il Notified
PNO-III-80-040, station Will Start Limited Const of safety- Related Activities During Wk of 800303-08.Staff Will Slowly Be Increased to High of 700 in June29 February 1980PNO-III-80-040:station Will Start Limited Const of safety- Related Activities During Wk of 800303-08.Staff Will Slowly Be Increased to High of 700 in June
ML20249A88527 December 1977PNS-77-050:on 771223,telephone Call Was Received by Secretary for Piping Contractor for Braidwood Site Re Bomb Threat.No Mass Evacuation Was Made & No Suspicious Devices Were Found During Search
ML20236E91216 August 1977PNS-77-031:on 770815,anonymous Call Was Received by Supervisor,Stating That Three Sticks of Dynamite Had Been Placed in Unit 1 Containment.Immediate Search Was Conducted & No Explosives Were Found.Site Was Not Evacuated
ML20151U99312 May 1977PNO-77-081:on 770511,ironworkers from Kankakee,Il Went on Strike.Ironworkers Contract Expires 770420 & Strike Concerns Wages & Work Rules.No Press Release Made
ML20249B63825 May 1976PNO-76-091:on 760525,primary Coolant Target Rock Relief Valve Failed to Close Properly.Preliminary Info Indicates No safety-related Problems Resulted from Event.Inspector at Site to Review Corrective Action & Cause of Failure