PNO-III-90-055, on 900801,unit Shut Down to Repair Check Valve 1A Essential Svc Water Pump.Caused by Failure of Pump Discharge Check Valve to Seat.Check Valve Will Be Replaced

From kanterella
Jump to navigation Jump to search
PNO-III-90-055:on 900801,unit Shut Down to Repair Check Valve 1A Essential Svc Water Pump.Caused by Failure of Pump Discharge Check Valve to Seat.Check Valve Will Be Replaced
ML20058L947
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 08/08/1990
From: Farber M, Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-90-055, PNO-III-90-55, NUDOCS 9008090054
Download: ML20058L947 (1)


, . -

kPRELIMINARYNOTIFICATIONOFEVENT.hR_UNUSUALOCCURRENCEPNO-III-90-55DateAugub.6,199 L. r*

- This; preliminary notification cor stitutes EARLY notice of events of POSSIBLE safety or public g: interest sighificance. The information is as initially received without verification or

- valuation, and is basically all that is known by the Region III staff on this date.

Facility: Commonwealth Edison Co. Licensee Emertency

Braidwood Unit 1 Classificat'cn

L Bracev111e, Illinois ' X Unusual Event Alert Docket No. 50-456 Site Area Imergency General Emergency NotApplicable i

Subject:

SHUTDOWN TO REPAIR CHECK VALVE lAt 9:05 a.m. (CDT) on. August 1, 1990, with Unit I at 99 percent power, the 1A Essential

' Servic] Water pump was declared inoperable due to the failure of the pump discharge check valve to seat during a monthly surveillance. This caused the Unit to. enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

Liniting Condition for Operation to repair the valve. . Repair activities were determined to

-take longer than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and the unit commenced a controlled shutdown on August 2. The licensee plans to repair or. replace the check valve and return to power operations by August 11 or 12. During the outage, additional maintenance activities will take place.

. Region III (Chicago) will monitor the licensee's course of action.

The State of Illinois will be notified.

~ The information in this Preliminary Notification has been reviewed with licensee management.

Region III first learned of this event at 6:46 p.m. (CDT). August 2, 1990. This information is current as of 11:30 p.m. (CDT), August 3,1990. ,

i CONTACT: F Farber W. Shafe {

FTS 388-5774 FTS 388-5656 4

DISTRIBUTION:

i HEADQUARTERS OFFICES REGIONS MAIL T0:

_ Chairman Carr NMS5 Region I DCS (Orig)

Comm._ Rogers GPA:SP Region II- 00T(Trans.

, Comm. Curtiss GPA:PA Region IV Only) ,

Com. Remick GPA:CA Region V EDO- *0lG Gen. Counsel *ASLAP FAX T0:

NRR Research INPO NSAC LIC

'AE00 IRM NRC OPS CTR Enforcement ACRS PDR (8/634-3743)

~
  • Denotes a Displaywriter/PC not an IBM 5520 Terminal. '

Rev. 07/17/90

' 3 133 90 _t_,:' 2 #

9008090054 900808

-PDR I&E PNO-III-90-OSS PDC