PNO-III-93-061, on 931023,licensee Commenced Shutdown of Unit 1 Due to Indications of Primary to Secondary Leak in SG 1C. Shutdown Completed on 931025.State of Il Notified

From kanterella
Jump to navigation Jump to search
PNO-III-93-061:on 931023,licensee Commenced Shutdown of Unit 1 Due to Indications of Primary to Secondary Leak in SG 1C. Shutdown Completed on 931025.State of Il Notified
ML20059D060
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/25/1993
From: Farber M, Hague D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-93-061, PNO-III-93-61, NUDOCS 9311020121
Download: ML20059D060 (1)


r4 ,

-li Date: October-25, 1993' i

PRELIMINARY NOTIFICATION OF. EVENT OR-UNUSUAL OCCURRENCE PNO-III-93-61 l l

This preliminary notification constitutes EARLY notice of events of-POSSIBLE

~

l safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III. staff on this date.

Facility: Licensee Emeroency Classification . _

i Commonwealth Edison Co.

Braidwood Unit 1 Braceville, Illinois General Emergency Site Area Emergency Alert p yhp V

Unusual Event

  • Docket No. 50-456 X N/A

Subject:

SHUTDOWN TO REPAIR STEAM GENERATOR TUBE LEAK On October 23, 1993, the licensee commenced a shutdown of Unit I due to ,

indications of a primary to secondary leak in the 1C steam generator'. These indications were increasing radiation levels and alarms on the IC steam line, '

blowdown line, and steam jet air ejector exhaust lines at about 7:48 a.m. a Subsequent chemistry samples confirmed a primary to secondary steam generator. -

tube leak of about 228 gallons per day (Technical Specification limit of 500 -

gpd) at aboui 2:10 p.m. The leak rate appeared to increase to 300 gpd at about 3:00 p.m.

The licensee used a slow shutdown rate of five percent power per hour to i eliminate possible stresses that might aggravate the leak. The shutdown was completed on October 25. The licensee estimates the outage will last 21. days.

The Senior Resident Inspector was notified of the shutdown by the licensee. He responded to the plant and observed the shutdown. The resident inspectors and Region 111-(Chicago) will monitor the licensee's repair activities.

The State of Illinois has been notified. Information in this preliminary notification'has been reviewed with licensee management.

This information is current as of 9 a.m. on October 25, 1993. 3 CONTACT: l 9%c Martin Farber 8