PNO-II-88-026, on 880419,plant Shutdown Will Begin for Evaluation & Correction of Problems Noted in INPO Evaluation Conducted During Wks of 880314 & 21.Restart Planned within 30 Days.Unit 2 Reactor Scram Occurred on 880417

From kanterella
(Redirected from PNO-II-88-026)
Jump to navigation Jump to search
PNO-II-88-026:on 880419,plant Shutdown Will Begin for Evaluation & Correction of Problems Noted in INPO Evaluation Conducted During Wks of 880314 & 21.Restart Planned within 30 Days.Unit 2 Reactor Scram Occurred on 880417
ML20151V562
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/19/1988
From: Trocine L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-II-88-026, PNO-II-88-26, NUDOCS 8805030100
Download: ML20151V562 (1)


_ _ _ _ _ _ _ _ _ _ _ _ _ _

rA Sm.%J da. (COO s t- IO; e o t h #[i%f?4 April 19, 1988 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-II-88-26 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or  ;

public interest significance. The information is as initially received without verifi-cation or evaluation, and is basically all that is known by the Region II staff on this

! date, FACILITY: Georgia Power Company Licensee Emergency Classification:

Hatch Units 1 & 2 Notification of Unusual Event Docket Nos. 50-321 and 50-366 Alert  !

Baxley, Georgia Site Area Emergency General Emergency X Not Applicable

SUBJECT:

PLANT SHUTDOWN FOR 30 DAYS TO EVALUATE INPO FINDINGS AND CORRECT PROBLEMS The licensee will begin a controlled shutdown of Hatch Nuclear Plant Units 1 and 2 today (April 19,1988) in order to evaluate and correct problems identified as a result of an  !

INP0 evaluation conducted during the weeks of March 14 and 21,1988. The licensee i anticipates restarting both units in 30 days.

Prior to shutdown, Unit 1 was at 100 percent power and Unit 2 was preparing to start up  ;

after recovering from a reactor scram from 79 percent power on April 17, 1988. l i The State of Georgia will be informed.  !

The licensee is considering issuance of a news release.

The NRC received initial notification of this event by telephone from the licensee at  :

8:05 a.m. (EDT) on April 19, 1988.

This information is current as of 9:00 a.m. (EDT) on April 19, 1988.

CONTACT: L. Trocine - 242-2686 ,

l DISTRIBUTION W111ste Regions l

H. Street Chairnan Zech MNBB XMi Phillips NRR LEW OIA KMSS Region ! /M/ l Com. Roberts ARM O! Region II - , j i

Com. Bernthal EDO Region III /[ O

Com. Carr PA Region IV - f/l/)

Com. Rogers OGC Air Rights Region V ff,[O  ;

SECY SLITP i OGC-H CA FAX TO: Nicholson Lane MAIL TO GPA INP0- 7X4' RES DCS (Original)

ACRS NSAC DOT (Trans.only)  !

POR LICENSEE"Il;b RESIDENTINSPECTOR-ll,g i HQS. OPERATIONS OFFICER i ... ************************************************************************************** .

l

$@50fgOoeeo439

] PNO-II-88-026 DCD

, zuy