PNO-78-172:on 780923,following Insp in Drywell W/Reactor Operating at Low Power,Three Men Were Trapped in Containment for Approx One Hour & 20 Minutes Due to Door Interlock Malfunction
ML20216K131
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/25/1978
From: Blackwood E, Nolan F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-78-172, NUDOCS 9804220102
Download: ML20216K131 (1)


Text

Vt> A M V' 0 I

l C 0l PRELD11 NARY NOTIFICATION Q/,

/

j September 25, 1978

/

v 1

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PN0-78-172 This preliminary notification constitutes EARLY notice of an event f

of P0SSIBLE_ safety or public interest significance.

The information 1

presented is as initially received without verification or evaluation.

i

_and is_ basically all that is known by IE staff as of this date.

_F_ACILITY: Georgia Power Company Hatch, Unit No. 2 l

Dopket No. 50-366 Baxley, Georgia

SUBJECT:

MEN TRAPPED IN CONTAINMENT On September 23, 1978 following an inspection in the drywell with the reactor operating at low power, three men were trapped in containment j

for approximately one hour and 20 minutes due to a door interlock i

malfunction.

Rescue was effected through the control rod drive removal j

j hatch.

One man who had a history of high blood pressure was sent to the hospital for checkup, but was not admitted.

No contamination or over-gl

[s.

exposures were involved. Georgia Power Company is considering modifications

(,

to the interlock which prevented opening the outer airlock door.

li

( ]-

Media interest is expected due to a local newspaper article on a similar event at this facility in June 1977.

Neither the licensee nor the NRC is planning a news release.

The resident inspector is onsite.

OSHA 4

and the State of Georgia have been notified.

1 Region II (Atlanta) received notification of this occurrence by telephone from the plant manager at 10:30 a.m. on September 23.

This information is current as of 11:00 a.m. on September 25.

l

Contact:

E. Blackwood IE, x28019; F. Nolan IE, x28019 Distribution:

Transmitted H St #7 M 1%Iirman Hendrie Commissioner Bradford S. J. Chilk, SECY l

Commission,er Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky.

(ForDistribution)

Transmit @ed: MNBBE/W P Bldg M*0 L J.G. Davis,9.'('f IE L. V. Cossick, ED0 H. R. Denton, NRR Region _2Z l

S. H. Hanauer, EDO J. J. Fouchard, PA SS Bldg 8/ d J (MAIL)

N. M. Haller, NPA C. V. Smith, NMSS

0. G. Abston, 0IA R. G. Ryan, OSP R. Minogue, SD
  • (g H. K. Sha w /

-_........pa r, EL D PRELIMINARY NOTIFICATION ofj I'

9804220102 780925 i

y@O p PDR I&E 5

PNO-78-172 PDR

-..,,I

.,, c